Colorado projects · FY 2026-27
Projects
Updated Oct 5
Every Colorado project on this site is here, 1,478 in all, each on one row. They are CDOT’s corridors and the state’s buildings, and every capital project and capital request the state lists for FY 2026-27. They also include the act’s 13 IT projects and every project in CDOT’s own catalog. A project with a page on this site opens it from its row.
Where they are, on the map
FACTThe map draws the 103 projects whose own records name a place, each circle at the place its record names. The table below lists all of them, and its filters move the map too. Tap a circle for its page.
CDOT lists 1,340 road projects that are not on this map. Its pages name a county, not a place, so we do not guess where they are. Find them in the table below, or pick your county on Near You.
Does the money follow the people?
Here is how the $119.3M this act appropriates to a capital project with a place lands.
Western Slope:
10.0% of Coloradans, 7.3% of the money. Front Range and central mountains:
87.1% of Coloradans, 87.4% of the money. Eastern Plains:
2.9% of Coloradans, 5.2% of the money.
The $41.1M appropriated to statewide items belongs to no part of the
state and is excluded from both sides. Putting it on one would tilt the comparison.
Population is the Census Vintage 2025 county estimate. The shading is
people per square mile of land, on a scale of round powers of ten that is ours.
This view totals the capital schedule instead of drawing projects. There is one mark for each of the
25 counties that holds one. Its left half is sized by what was appropriated
there, and its right half by what was requested and refused. Each half is sized by its own
basis, and the two are never added. A mark with a small left half and a large right one is a
county that asked for a great deal and got a little.
Money the committee recommended is not drawn. The reason is worth stating:
8 of the 13 recommended requests appear in the enacted act at the
identical amount, $56.6M of them. Drawing both would put the same dollars
on the map twice. Every county's own recommended figure is on its card.
103 of 1,478 projects are drawn. A project is drawn where its own record names a place. A ledger project sits at its site, and a capital line item at the facility it names. Placement is ours, not the state's: neither budget document publishes a coordinate, so we place each named facility in the county it operates in. Some rows are in the table and not on the map. They are statewide programs, line items whose site we have not established, halted projects, IT projects and every CDOT catalog page.
This grid holds the 116 capital projects and capital requests of FY 2026-27. They sit in three bands across (Western Slope, Front Range and central mountains, Eastern Plains) and three tiers down. Select a box to show only its projects in the table below, and select it again to show them all. This grouping is ours. No publisher defines it, and the county column in the table is the finer and more honest answer.
The same money, county by county — all 64 (25 hold a project, 39 hold none)
This is the grid and the county marks, in one table. The nine cells above count these same 93 capital projects and requests, grouped by the county each one sits in. The cells sum to 93 projects across 25 counties, which is exactly the 25 marks the map draws in the People & money view. 39 of Colorado's 64 counties hold neither a project nor a request in FY 2026-27, and they are listed here rather than left out.
One year is not a horizon, so we read the year before as well. Of those 39, exactly one held a capital project in FY 2025-26 (Clear Creek, $375K). So 38 of the 64 got nothing in either year. SB25-206 is a separate act for a separate year, and none of its money is added to anything on this page. The last column pair is the same Census population and land-area density the map shades by. It opens sorted by money refused, highest first — select any heading to sort by that column instead.
“Named requests” is doing work in that column heading. Part I of the act is controlled maintenance, itemized building by building — but the request document does not name controlled maintenance by county at all. It pools it into three statewide Controlled Maintenance Level lines. So a county can hold appropriated money and still show every named request refused, and 10 of them do. The share is of what a county asked for by name, and nothing else.
| Mesa | Central Western Slope | 6 | $3,047,863 | $101,614,499 | 100% | 162,845 | 48.9 |
| Weld | North Front Range & central mountains | 4 | $1,388,928 | $87,191,383 | 100% | 378,426 | 95 |
| Fremont | Central Front Range & central mountains | 9 | $11,227,130 | $62,464,307 | 99% | 50,039 | 32.6 |
| Arapahoe | North Front Range & central mountains | 4 | $1,226,282 | $49,903,223 | 100% | 673,820 | 844.5 |
| Gunnison | Central Western Slope | 1 | — | $45,576,953 | 100% | 17,439 | 5.4 |
| Larimer | North Front Range & central mountains | 10 | $33,026,045 | $35,343,270 | 58% | 377,292 | 145.4 |
| Jefferson | North Front Range & central mountains | 4 | $4,751,743 | $34,483,762 | 100% | 580,451 | 759.4 |
| Denver | North Front Range & central mountains | 11 | $16,185,127 | $29,175,930 | 41% | 740,613 | 4,838.3 |
| Otero | South Eastern Plains | 3 | $2,192,580 | $24,813,776 | 100% | 17,683 | 14 |
| Boulder | North Front Range & central mountains | 6 | $3,489,924 | $24,229,642 | 100% | 328,560 | 452.3 |
| El Paso | Central Front Range & central mountains | 6 | $8,528,566 | $21,569,116 | 61% | 757,040 | 356 |
| Crowley | South Eastern Plains | 3 | $831,567 | $20,328,389 | 62% | 5,677 | 7.2 |
| Delta | Central Western Slope | 2 | $1,891,154 | $13,926,353 | 100% | 32,178 | 28.2 |
| Garfield | Central Western Slope | 1 | — | $12,433,591 | 100% | 63,474 | 21.5 |
| Las Animas | South Eastern Plains | 1 | — | $11,369,144 | 100% | 14,391 | 3 |
| Rio Blanco | North Western Slope | 2 | $897,491 | $10,212,695 | 100% | 6,683 | 2.1 |
| La Plata | South Western Slope | 3 | $2,889,127 | $10,006,795 | 100% | 56,898 | 33.7 |
| Rio Grande | South Front Range & central mountains | 1 | — | $8,964,491 | 100% | 11,087 | 12.2 |
| Prowers | South Eastern Plains | 2 | $973,191 | $6,618,378 | 100% | 11,884 | 7.3 |
| Alamosa | South Front Range & central mountains | 1 | — | $4,292,449 | 100% | 16,688 | 23.1 |
| Adams | North Front Range & central mountains | 3 | $8,017,423 | — | — | 554,668 | 475.4 |
| Archuleta | South Western Slope | 0 | — | — | — | 14,306 | 10.6 |
| Baca | South Eastern Plains | 0 | — | — | — | 3,347 | 1.3 |
| Bent | South Eastern Plains | 1 | $997,616 | — | — | 5,716 | 3.8 |
| Broomfield | North Front Range & central mountains | 0 | — | — | — | 79,174 | 2,401.5 |
| Chaffee | Central Front Range & central mountains | 1 | $1,000,937 | — | — | 20,831 | 20.6 |
| Cheyenne | Central Eastern Plains | 0 | — | — | — | 1,713 | 1 |
| Clear Creek | North Front Range & central mountains | 0 | — | — | — | 8,994 | 22.8 |
| Conejos | South Front Range & central mountains | 0 | — | — | — | 7,529 | 5.8 |
| Costilla | South Front Range & central mountains | 0 | — | — | — | 3,679 | 3 |
| Custer | South Front Range & central mountains | 0 | — | — | — | 5,590 | 7.6 |
| Dolores | South Western Slope | 0 | — | — | — | 2,466 | 2.3 |
| Douglas | North Front Range & central mountains | 0 | — | — | — | 399,396 | 475 |
| Eagle | Central Western Slope | 0 | — | — | — | 54,291 | 32.2 |
| Elbert | North Eastern Plains | 0 | — | — | — | 30,534 | 16.5 |
| Gilpin | North Front Range & central mountains | 0 | — | — | — | 6,073 | 40.5 |
| Grand | North Western Slope | 0 | — | — | — | 16,496 | 8.9 |
| Hinsdale | Central Western Slope | 0 | — | — | — | 753 | 0.7 |
| Huerfano | South Front Range & central mountains | 0 | — | — | — | 7,011 | 4.4 |
| Jackson | North Western Slope | 0 | — | — | — | 1,211 | 0.8 |
| Kiowa | Central Eastern Plains | 0 | — | — | — | 1,412 | 0.8 |
| Kit Carson | Central Eastern Plains | 0 | — | — | — | 7,069 | 3.3 |
| Lake | Central Front Range & central mountains | 0 | — | — | — | 7,552 | 20 |
| Lincoln | Central Eastern Plains | 0 | — | — | — | 5,645 | 2.2 |
| Logan | North Eastern Plains | 1 | $1,251,250 | — | — | 20,654 | 11.2 |
| Mineral | South Front Range & central mountains | 0 | — | — | — | 910 | 1 |
| Moffat | North Western Slope | 0 | — | — | — | 13,122 | 2.8 |
| Montezuma | South Western Slope | 0 | — | — | — | 26,678 | 13.1 |
| Montrose | Central Western Slope | 0 | — | — | — | 44,591 | 19.9 |
| Morgan | North Eastern Plains | 0 | — | — | — | 30,306 | 23.7 |
| Ouray | Central Western Slope | 0 | — | — | — | 5,265 | 9.7 |
| Park | Central Front Range & central mountains | 0 | — | — | — | 18,314 | 8.3 |
| Phillips | North Eastern Plains | 0 | — | — | — | 4,420 | 6.4 |
| Pitkin | Central Western Slope | 0 | — | — | — | 16,625 | 17.1 |
| Pueblo | South Front Range & central mountains | 7 | $15,477,495 | — | 0% | 169,277 | 70.9 |
| Routt | North Western Slope | 0 | — | — | — | 25,329 | 10.7 |
| Saguache | South Front Range & central mountains | 0 | — | — | — | 6,732 | 2.1 |
| San Juan | South Western Slope | 0 | — | — | — | 813 | 2.1 |
| San Miguel | Central Western Slope | 0 | — | — | — | 7,753 | 6 |
| Sedgwick | North Eastern Plains | 0 | — | — | — | 2,247 | 4.1 |
| Summit | Central Western Slope | 0 | — | — | — | 31,517 | 51.8 |
| Teller | Central Front Range & central mountains | 0 | — | — | — | 24,756 | 44.4 |
| Washington | North Eastern Plains | 0 | — | — | — | 4,732 | 1.9 |
| Yuma | North Eastern Plains | 0 | — | — | — | 9,896 | 4.2 |
Appropriated and requested are different bases and are never added. The share column is a proportion of the ask alone. Recommended and not recommended are the two halves of one request document, so they share a total. Appropriated money comes from a different document and is never put in that denominator. The $41.1M appropriated to statewide items and the 6 projects whose site is not established sit in no county and are in neither column.
The nine do not add up to 100%, and that is not a rounding error. They come to 74% of what the state appropriated and 81% of what it refused. The rest belongs to no part of the state: $30.7M appropriated and $144.4M refused to statewide items, plus $10.4M whose site we have not established. Each share is of every dollar on that basis, not of the money that happens to have a place. A denominator built from what we managed to place would make the nine add to 100%. It would also make each one a share of our own work rather than of the state's.
The population line is the one that does add to 100%, for a plain reason. Every Coloradan lives in a county, and every county is in one of these nine. Money can belong to no part of the state. People cannot.
Read the empty cell first. Central Eastern Plains holds no capital project and no capital request in either document. Not one was funded, and not one was asked for and turned down.
Each row opens its own page. Several bases sit in this table and are never added together. An appropriation is money the legislature authorized to be spent in one year. A request is money an agency asked for, and a project’s total cost spans every year it takes. A CDOT amount is what CDOT’s page prints. A budget line that pays for part of a project listed here is shown under that project.
The act’s 13 IT projects are rows here too, $32,325,503 in all, the total Section 4 of HB26-1410 prints. They name no place and have no page of their own on this site, so their rows link nothing.
Search and filter
| Central 70 Project | CDOT | Complete | $1.2B FACT | Denver County |
| I-70 Floyd Hill Improvement ProjectPacing: spending against the calendar, I-70 Floyd Hill Improvement Project | CDOT | Underway | $905M FACT | Clear Creek County |
| I-270 Corridor ImprovementsPacing: spending against the calendar, I-270 Corridor Improvements | CDOT | Underway | Construction cost: $806M FACT | Adams and Denver counties |
| I-25 South Gap: Monument to Castle Rock | CDOT | Complete | $419M FACT | Douglas and El Paso counties |
| I-70 West Vail Pass Auxiliary Lanes | CDOT | Underway | $325M FACT | Eagle County |
| North I-25 Express Lanes — Segment 6 (Berthoud–Johnstown) | CDOT | Complete | ≈ $305M FACT | Larimer and Weld counties |
| North I-25 Express Lanes — Segments 7 & 8 (Johnstown–Fort Collins) | CDOT | Complete | $302M FACT | Larimer County |
| C-470 Express Lanes | CDOT | Archived Project | Cost: $276M FACT | CDOT’s page names no county. |
| Capitol Complex Renovation, Phase 3/4 | DPA | Underway | ≈ $216.7M FACT | Denver County |
| This year’s budget line Capitol Complex renovation and footprint reduction ph 3/4 | DPA | Requested, recommended | $41,450,138 FACT | Capitol Complex Denver County |
| North I-25 Express Lanes — Segment 5 (Mead–Berthoud)Pacing: spending against the calendar, North I-25 Express Lanes — Segment 5 (Mead–Berthoud) | CDOT | Underway | Contracts awarded so far: $214.52M CALC | Weld County |
| US 6 & Wadsworth Boulevard Interchange Improvements | CDOT | Active Construction | Cost: $202M FACT | Jefferson County |
| CO 119 Safety, Mobility & BikewayPacing: spending against the calendar, CO 119 Safety, Mobility & Bikeway | CDOT | Underway | $165M FACT | Boulder County |
| CSU Clark Building Renovation & Addition | CSU | Underway | ≈ $136.6M CALC | Larimer County |
| This year’s budget line Clark Building Renovation and Addition | Colorado State University | Appropriated this year | $25,798,175 FACT | Colorado State University Larimer County |
| This year’s budget line CSU Clark Building renovation & addition ph 4/4 | IHE | Requested, recommended | $25,798,175 FACT | Colorado State University Larimer County |
| I-25 and Crystal Valley interchange project (Town of Castle Rock) | CDOT | Active Construction | Construction Cost: $120M FACT | Douglas County |
| I-25/US 50B Interchange Reconstruction | CDOT | Active Construction | Construction Cost: $114M FACT | Pueblo County |
| I-25 / Cimarron Street (US 24) Interchange Design-Build | CDOT | No status printed | Cost: $113.1M FACT | CDOT’s page names no county. |
| US 85 Corridor Improvements in Douglas County | CDOT | No status printed | Total Construction Cost: $108M FACT | Douglas County |
| Statewide Controlled Maintenance — Level 1 (FY 2026-27) | State Architect | Underway | $103.2M FACT | Statewide |
| This year’s budget line Controlled Maintenance Level 1 | — | Requested, recommended | $109,383,329 FACT | NO SINGLE SITE A statewide controlled-maintenance pool, spread across state buildings by the level the request names. The document allocates no share of it to any site. |
| Statewide Controlled Maintenance — Level 2 (FY 2026-27) | State Architect | Requested, not recommended | $102.9M FACT | Statewide |
| This year’s budget line Controlled Maintenance Level 2 | — | Requested, not recommended | $102,946,361 FACT | NO SINGLE SITE A statewide controlled-maintenance pool, spread across state buildings by the level the request names. The document allocates no share of it to any site. |
| I-25 Ilex Street to City Center Drive | CDOT | No status printed | Cost: $100M FACT | CDOT’s page names no county. |
| US 550 / US 160 Connection South (Grandview) | CDOT | Complete | $98.6M FACT | La Plata County |
| DRIVES — Vehicle Services Platform | DOR | Complete | $93.3M FACT | Statewide |
| 120th Avenue Connection | CDOT | Archived Project | Cost: $90.1M FACT | CDOT’s page names no county. |
| Unemployment Insurance Systems (MyUI+) | CDLE | Underway | Capital money appropriated: $86.2M CALC | Statewide |
| Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs | CDOT | No status printed | Construction Cost: $71M FACT | Clear Creek and Summit counties |
| I-70 Picadilly Design-Build | CDOT | Active Construction | Construction Cost: $69.985M FACT | Adams County |
| Colorado Mesa University — Maverick Center Renovation & Expansion | CMU | Requested, not recommended | $65.0M FACT | Mesa County |
| This year’s budget line CMU Maverick Center renovation and expansion | IHE | Requested, not recommended | $65,028,688 FACT | Colorado Mesa University Mesa County |
| US 287 Safety Improvements from Ted's Place to the Wyoming Border | CDOT | Active Construction | Construction Cost: $65M FACT | Larimer County |
| I-25 Acceleration/ Deceleration Lanes from Fillmore Street to Garden of the Gods Road | CDOT | Active Construction | Construction Cost: $62M FACT | El Paso County |
| Wadsworth Boulevard Widening Improvements - I-70 to 35th Avenue | CDOT | No status printed | Cost: $60M FACT | Jefferson County |
| Burnham Yard Acquisition & Resale | CDOT | Complete | $50.0M FACT | Denver County |
| CO 21 Powers Boulevard & Airport Road Interchange | CDOT | Active Construction | Construction Cost: $46M FACT | El Paso County |
| Western Colorado University — Savage Library Renovation | Western CU | Requested, not recommended | $45.6M FACT | Gunnison County |
| This year’s budget line Western CU Leslie J. Savage Library renovation | IHE | Requested, not recommended | $45,576,953 FACT | Western Colorado University Gunnison County |
| I-70 Concrete Overlay in Arriba | CDOT | No status printed | Cost: $44.6M FACT | CDOT’s page names no county. |
| Southeastern Colorado Bridge Bundle | CDOT | No status printed | Cost: $42.5M FACT | CDOT’s page names no county. |
| CO 21 Powers Boulevard & Research Parkway Interchange | CDOT | Archived Project | Cost: $42M FACT | CDOT’s page names no county. |
| Arapahoe Community College — Health Program Integration, Phase 2/2 | Arapahoe CC | Requested, not recommended | $41.6M FACT | Arapahoe County |
| This year’s budget line Arapahoe CC Health program integration, ph 2/2 | IHE | Requested, not recommended | $41,615,447 FACT | Arapahoe Community College Arapahoe County |
| HRWorks — Statewide HR Information System (terminated) | DPA | Halted | $41.6M FACT | Statewide |
| University of Northern Colorado — McKee Hall Renewal | UNC | Requested, not recommended | $41.4M FACT | Weld County |
| This year’s budget line UNC McKee Hall (CR) | IHE | Requested, not recommended | $41,378,027 FACT | University of Northern Colorado Weld County |
| CO 115 Improvements - Colorado Springs to Penrose | CDOT | No status printed | Cost: $40M FACT | El Paso County |
| CO 9 Colorado River South Wildlife & Safety Improvements | CDOT | Archived Project | Cost: $40M FACT | Grand County |
| I-70 Aerotropolis Parkway Interchange | CDOT | Active Construction | Construction Cost: $38.6M FACT | Adams County |
| Statewide Controlled Maintenance — Level 3 (FY 2026-27) | State Architect | Requested, not recommended | $37.1M FACT | Statewide |
| This year’s budget line Controlled Maintenance Level 3 | — | Requested, not recommended | $37,089,877 FACT | NO SINGLE SITE A statewide controlled-maintenance pool, spread across state buildings by the level the request names. The document allocates no share of it to any site. |
| DeCORuM — Corrections Offender Management | DOC | Underway | ≈ $36.4M FACT | Statewide |
| I-70 Bethune & Burlington Improvements | CDOT | No status printed | Construction Cost: $36M FACT | Kit Carson County |
| CO Mental Health Institute at Pueblo — Campus Utility Infrastructure | CDHS | Underway | ≈ $34.7M FACT | Pueblo County |
| This year’s budget line Campus Utility Infrastructure Upgrade, CMHHIP (Capital Renewal) | Department of Human Services | Appropriated this year | $4,144,206 FACT | Colorado Mental Health Hospital, Pueblo Pueblo County |
| This year’s budget line Campus utility infrastructure upgrade, CMHIP ph 2/4 (CR) | DHS | Requested, recommended | $4,144,206 FACT | Colorado Mental Health Hospital, Pueblo Pueblo County |
| I-70 Resurfacing from Chief Hosa to Colfax | CDOT | Active Construction | Construction Cost: $34.7M FACT | Jefferson County |
| US 160 East of Durango | CDOT | No status printed | Phase 1: $34M FACT | CDOT’s page names no county. |
| CO 133 Paonia Slope Stabilization | CDOT | Archived Project | Construction Cost: $33.4M FACT | Gunnison County |
| Colorado Mesa University — Rural Technology Hub | CMU | Requested, not recommended | $33.1M FACT | Mesa County |
| This year’s budget line CMU Rural technology hub electrical and computer engineering building | IHE | Requested, not recommended | $33,132,383 FACT | Colorado Mesa University Mesa County |
| US 50 Purcell Interchange | CDOT | No status printed | Cost: $33M FACT | Pueblo County |
| University of Northern Colorado — Candelaria Hall Renewal | UNC | Requested, not recommended | $32.3M FACT | Weld County |
| This year’s budget line UNC Candelaria Hall (CR) | IHE | Requested, not recommended | $32,258,351 FACT | University of Northern Colorado Weld County |
| CO 119 Boulder Canyon Improvements | CDOT | Archived Project | Cost: $31M FACT | Boulder County |
| I-70 Seibert-Stratton Roadway Improvements | CDOT | Active Construction | Construction Cost: $31M FACT | Kit Carson County |
| I-70 Reconstruction Seibert to Stratton | CDOT | No status printed | Cost: $30.8M FACT | CDOT’s page names no county. |
| I-70 Vail Underpass | CDOT | No status printed | Cost: $30M FACT | CDOT’s page names no county. |
| DOC — Fremont Facility Electrical Replacement | DOC | Requested, not recommended | $29.4M FACT | Fremont County |
| This year’s budget line Primary and secondary electrical replacement, Fremont (CR) | DOC | Requested, not recommended | $29,351,940 FACT | Fremont Correctional Facility Fremont County |
| US 85 & Weld County Road 44 Interchange | CDOT | No status printed | Cost: $28.5M FACT | Weld County |
| I-70 Exit 203 Interchange in Frisco | CDOT | Active Construction | Construction Cost: $27.1M FACT | Summit County |
| I-70 Auxiliary Lanes Summit County | CDOT | No status printed | Cost: $27M FACT | CDOT’s page names no county. |
| Auraria Campus — Tivoli Student Union Infrastructure | AHEC | Requested, not recommended | $26.9M FACT | Denver County |
| This year’s budget line AHEC Tivoli Student Union infrastructure (CR) | IHE | Requested, not recommended | $26,891,315 FACT | Auraria Higher Education Center Denver County |
| I-76 York to Dahlia Bridge Reconstruction | CDOT | No status printed | Cost: $25.426M FACT | Adams County |
| Eastern Plains Timber Bridge Replacement | CDOT | No status printed | Cost: $25M FACT | Arapahoe, Elbert, Morgan, Washington and Yuma counties |
| I-70 Over Havana Bridge Replacement | CDOT | No status printed | Cost: $25M FACT | CDOT’s page names no county. |
| US 160 Pagosa Springs Reconstruction | CDOT | Active Construction | Construction Cost: $24.5M FACT | Archuleta County |
| Buchtel Boulevard & Evans Intersection Improvements | CDOT | Active Construction | Construction Cost: $24.2M FACT | Denver County |
| US 285 at CO 9 Intersection Improvements & Bridge Replacement | CDOT | No status printed | Cost: $24.1M FACT | Park County |
| I-25 and Santa Fe Drive | CDOT | No status printed | Cost: $24M FACT | CDOT’s page names no county. |
| US 85 Widening Project in Douglas County from Sedalia to Louviers | CDOT | No status printed | Cost: $23.7M FACT | CDOT’s page names no county. |
| I-25 Trinidad Resurfacing | CDOT | No status printed | Construction Cost: $23M FACT | Las Animas County |
| I-70 & CO 58 Interchange Project | CDOT | News | Cost: $23M FACT | CDOT’s page names no county. |
| I-25 & Alameda Bridge Replacement | CDOT | No status printed | Cost: $22.317M FACT | Denver County |
| I-25 Crossroads Bridge | CDOT | Flood | Cost: $22.1M FACT | Larimer and Weld counties |
| I-25 Central Denver Resurfacing | CDOT | No status printed | Construction Cost: $22M FACT | Denver County |
| US 160 Resurfacing Project from Four Corners to Aztec Creek | CDOT | No status printed | Cost: $22M FACT | CDOT’s page names no county. |
| I-25 Colorado City Surface Treatment | CDOT | No status printed | Construction Cost: $21.867M FACT | Huerfano and Pueblo counties |
| DOC — Electrical Infrastructure, East Cañon City Complex | DOC | Requested, not recommended | $21.8M FACT | Fremont County |
| This year’s budget line Electrical distribution infrastructure replacement, East Cañon City (CR) | DOC | Requested, not recommended | $21,805,010 FACT | East Cañon City prison complex Fremont County |
| I-25 North Express Lanes: 120th to Northwest Parkway/E-470 | CDOT | No status printed | Cost: $21.5M FACT | CDOT’s page names no county. |
| Edwards Spur Road | CDOT | Archived Project | Cost: $21.3M FACT | CDOT’s page names no county. |
| CO 17 Widening & Resurfacing South of Hooper | CDOT | Archived Project | Cost: $21M FACT | Las Animas County |
| US 287 CO 1 to LaPorte Bypass | CDOT | No status printed | Cost: $21M FACT | CDOT’s page names no county. |
| Vail Pass Rest Area Reconstruction | CDOT | No status printed | Cost: $21M FACT | Summit County |
| Colorado School of Mines — Utilities Infrastructure | Mines | Requested, not recommended | $20.9M FACT | Jefferson County |
| This year’s budget line Mines utilities infrastructure upgrade (CR) | IHE | Requested, not recommended | $20,887,540 FACT | Colorado School of Mines Jefferson County |
| CO 9 Frisco to Breckenridge | CDOT | Archived Project | Cost: $20.6M FACT | CDOT’s page names no county. |
| CO 9 Iron Springs Alignment | CDOT | Archived Project | Cost: $20.6M FACT | CDOT’s page names no county. |
| I-70 Noise Wall Replacement: I-76 to Pecos Street | CDOT | No status printed | Construction Cost: $20.541M FACT | Denver and Jefferson counties |
| DOC — Arkansas Valley Electronic Security System | DOC | Requested, not recommended | $20.3M FACT | Crowley County |
| This year’s budget line Electronic security system, Arkansas Valley (CR) | DOC | Requested, not recommended | $20,328,389 FACT | Arkansas Valley Correctional Facility Crowley County |
| Otero College — McBride Hall & Student Services Addition | Otero College | Requested, not recommended | $20.2M FACT | Otero County |
| This year’s budget line Otero College McBride Hall and student services addition and remodel | IHE | Requested, not recommended | $20,219,881 FACT | Otero College Otero County |
| CO 13 Fortification Creek North | CDOT | Archived Project | Cost: $20M FACT | Moffat County |
| CO 13 Garfield County Rio Blanco Hill Widening | CDOT | Archived Project | Cost: $20M FACT | Garfield County |
| Eisenhower/Johnson Tunnels Fixed Fire Suppression System | CDOT | Past Construction, Archived Project | Cost: $20M FACT | CDOT’s page names no county. |
| I-70 Vail to Glenwood Springs Fiber Connectivity | CDOT | No status printed | Cost: $20M FACT | Eagle and Garfield counties |
| I-76 & US 34 Resurfacing in Fort Morgan & Brush | CDOT | No status printed | Cost: $20M FACT | CDOT’s page names no county. |
| I-76 Corridor Improvements Between Iliff & Crook Interchanges | CDOT | No status printed | Construction Cost: $20M FACT | Logan County |
| US 6 & US 385 Bridge Replacements | CDOT | Active Construction | Construction Cost: $20M FACT | Phillips County |
| US 6 Resurfacing Between Sterling & Atwood | CDOT | Active Construction | Construction Cost: $20M FACT | Logan County |
| I-25 Walsenburg Bridge Replacement | CDOT | No status printed | Cost: $19.3M FACT | Huerfano County |
| I-70B South of Rood Avenue Improvements | CDOT | Active Construction | Construction Cost: $19.2M FACT | Mesa County |
| US 550 Otter Road South Safety Improvements | CDOT | No status printed | Cost: $18.9M FACT | Montrose and Ouray counties |
| I-70 & Harlan Street Bridge Replacement & Interchange Safety Improvements | Construction Phase | CDOT | No status printed | Construction Cost: $18.6M FACT | Jefferson County |
| I-70 Resurfacing from Gypsum to Eagle | CDOT | Active Construction | Construction Cost: $18.1M FACT | Eagle County |
| US 50 Bonforte to Avondale Resurfacing | CDOT | Archived Project | Cost: $17.782M FACT | Pueblo County |
| CO 92 Gunnison River Bridge Construction | CDOT | Archived Project | Cost: $17M FACT | Delta and Gunnison counties |
| CO 13 Reconstruction in Rio Blanco County | CDOT | Archived Project | Cost: $16.9M FACT | Rio Blanco County |
| Sterling S Curve Alignment on US 6, CO 14 & CO 138 | CDOT | No status printed | Cost: $16.6M FACT | CDOT’s page names no county. |
| I-25 Lone Tree Mobility Hub Improvements | Construction Phase | CDOT | Active Construction | Construction Cost: $16.5M FACT | Douglas County |
| US 385 Holyoke North Resurfacing | CDOT | Active Construction | Cost: $16.5M FACT | Phillips County |
| US 6 in Clifton Improvements | CDOT | No status printed | Cost: $16.5M FACT | Mesa County |
| I-70 Bridges over Ward Road | CDOT | No status printed | Cost: $16.4M FACT | CDOT’s page names no county. |
| CO 71 Resurfacing South of Limon | CDOT | Archived Project | Cost: $16M FACT | CDOT’s page names no county. |
| I-25 Resurfacing in Pueblo County | CDOT | No status printed | Construction Cost: $15.81M FACT | Pueblo County |
| Glenwood Canyon Phase 7 Improvements | CDOT | No status printed | Cost: $15.7M FACT | CDOT’s page names no county. |
| CU Boulder — Macky Auditorium Renovation | CU Boulder | Requested, not recommended | $15.6M FACT | Boulder County |
| This year’s budget line CU Boulder Macky Auditorium renovation | IHE | Requested, not recommended | $15,601,679 FACT | University of Colorado Boulder Boulder County |
| US 50 Coaldale to Salida Resurfacing Project | CDOT | No status printed | Construction Cost: $15.5M FACT | Chaffee and Fremont counties |
| UCCS — Cybersecurity Engineering Cleanroom | UCCS | Requested, not recommended | $15.2M FACT | El Paso County |
| This year’s budget line UCCS Cybersecurity engineering cleanroom | IHE | Requested, not recommended | $15,158,000 FACT | UC Colorado Springs El Paso County |
| US 50 Olathe Resurfacing | CDOT | No status printed | Construction Cost: $15.2M FACT | Delta and Montrose counties |
| CO 71 Passing Lane Construction from Limon to Brush | CDOT | No status printed | Cost: $15M FACT | Lincoln and Washington counties |
| Eastbound I-70 Mount Vernon Emergency Escape Ramp Reconstruction | CDOT | No status printed | Construction Cost: $15M FACT | Jefferson County |
| I-25 Greenland Wildlife Overpass | CDOT | No status printed | Construction Cost: $15M FACT | Douglas County |
| I-25 Raton Pass Resurfacing | CDOT | No status printed | Construction Cost: $15M FACT | Las Animas County |
| CO 119 Roadwork Near I-25 | CDOT | Archived Project | Cost: $14.9M FACT | Weld County |
| US 285 Resurfacing & New Passing Lanes Near Fairplay | CDOT | No status printed | Cost: $14.5M FACT | CDOT’s page names no county. |
| C-470 Resurfacing from Ken Caryl to Wadsworth | CDOT | Active Construction | Construction Cost: $14.49M FACT | Jefferson County |
| CO 114 Overlay in Gunnison to Saguache County | CDOT | Archived Project | Cost: $14.325M FACT | Gunnison and Saguache counties |
| CO 71 Overlay between Ordway & Punkin Center | CDOT | Archived Project | Construction Cost: $14.3M FACT | Lincoln County |
| I-25 Over Dillon Drive | CDOT | No status printed | Cost: $14.3M FACT | Pueblo County |
| CO 9 Widening from Iron Springs to Frisco | CDOT | Archived Project | Cost: $14M FACT | CDOT’s page names no county. |
| Delta Correctional Center — Level 2 Perimeter Security | DOC | Requested, not recommended | $13.9M FACT | Delta County |
| This year’s budget line Level 2 perimeter security, Delta Correctional Facility | DOC | Requested, not recommended | $13,926,353 FACT | Delta Correctional Center Delta County |
| CO School for the Deaf & Blind — West Hall Renovation, Phase 1/2 | CDE / CSDB | Requested | $13.8M FACT | El Paso County |
| This year’s budget line CSDB West Hall renovation and addition ph 1/2 | EDU | Requested, recommended | $13,778,673 FACT | Colorado School for the Deaf and the Blind El Paso County |
| I-70B East of Third Street Improvements in Grand Junction | CDOT | Active Construction | Construction Cost: $13.8M FACT | Mesa County |
| Colorado School of Mines — Guggenheim Hall HVAC & Plumbing | Mines | Requested, not recommended | $13.6M FACT | Jefferson County |
| This year’s budget line Mines Guggenheim Hall HVAC/Plumbing (CR) | IHE | Requested, not recommended | $13,596,222 FACT | Colorado School of Mines Jefferson County |
| University of Northern Colorado — Crabbe Hall Renewal | UNC | Requested, not recommended | $13.6M FACT | Weld County |
| This year’s budget line UNC Crabbe Hall renewal (CR) | IHE | Requested, not recommended | $13,555,005 FACT | University of Northern Colorado Weld County |
| US 287 & US 50 Resurfacing in Lamar | CDOT | No status printed | Cost: $13.6M FACT | CDOT’s page names no county. |
| CO 13 & CO 317 Surface Treatment | CDOT | Archived Project | Construction Cost: $13.5M FACT | Moffat and Routt counties |
| CSU — Physiology Building | CSU | Requested, not recommended | $13.5M FACT | Larimer County |
| This year’s budget line CSU Physiology Building (CR) | IHE | Requested, not recommended | $13,500,825 FACT | Colorado State University Larimer County |
| I-70 B 1st Street & Grand Avenue | CDOT | No status printed | Cost: $13.5M FACT | CDOT’s page names no county. |
| US 385 Resurfacing North of Cheyenne Wells | CDOT | No status printed | Cost: $13.5M FACT | Cheyenne and Kit Carson counties |
| US 50 Settlement Repair Near Delta | CDOT | No status printed | Cost: $13.5M FACT | CDOT’s page names no county. |
| I-25 & CO 7 Interim Mobility Hub | CDOT | Active Construction | Construction Cost: $13.4M FACT | Adams and Broomfield counties |
| CO 172 Ignacio Resurfacing | CDOT | Archived Project | Cost: $13.3M FACT | La Plata County |
| US 550 Ouray to Colona Resurfacing | CDOT | No status printed | Cost: $13.3M FACT | Ouray County |
| Firestone-Longmont Mobility Hub | CDOT | No status printed | Cost: $13.1M FACT | Weld County |
| CO 14 Cameron Pass Resurfacing | CDOT | No status printed | Construction Cost: $13M FACT | Larimer County |
| CO 7 Road, Bike Lane & ADA Improvements in Estes Park | CDOT | Archived Project | Cost: $13M FACT | Boulder County |
| US 160 Fort Garland East Safety Mitigation | CDOT | Active Construction | Construction Cost: $13M FACT | Costilla County |
| US 287 Resurfacing: I-70 to 92nd Avenue | CDOT | No status printed | Construction Cost: $12.9M FACT | Adams and Denver counties |
| US 50 from Purcell Boulevard to Wills Boulevard | CDOT | No status printed | Cost: $12.9M FACT | Pueblo County |
| I-70 Floyd Hill to Chief Hosa Resurfacing | CDOT | No status printed | Cost: $12.8M FACT | Clear Creek and Jefferson counties |
| CO 96 Overlay between Eads & Sheridan Lake | CDOT | Archived Project | Construction Cost: $12.7M FACT | Kiowa County |
| CO 112 Del Norte to US 285 Junction Resurfacing | CDOT | No status printed | Construction Cost: $12.6M FACT | Rio Grande and Saguache counties |
| I-25 Exit 11 Interchange Improvements | CDOT | No status printed | Cost: $12.6M FACT | CDOT’s page names no county. |
| US 160 West Wolf Creek Pass Resurfacing | CDOT | No status printed | Construction Cost: $12.6M FACT | Mineral County |
| CO 62 Ramp Up Ridgway | CDOT | Archived Project | Cost: $12.5M FACT | CDOT’s page names no county. |
| DOC — Arkansas Valley Critical Living Unit Improvements (Ph 2/2) | DOC | Requested | $12.5M FACT | Crowley County |
| This year’s budget line Critical living unit improve shower/drain/toilets, Arkansas Valley ph 2/2 (CR) | DOC | Requested, recommended | $12,506,208 FACT | Arkansas Valley Correctional Facility Crowley County |
| I-25 Resurfacing Midway in Fountain | CDOT | No status printed | Construction Cost: $12.5M FACT | El Paso County |
| DOC — Rifle Correctional Center Perimeter Security | DOC | Requested, not recommended | $12.4M FACT | Garfield County |
| This year’s budget line Level 2 perimeter security, Rifle Correctional Center | DOC | Requested, not recommended | $12,433,591 FACT | Rifle Correctional Center Garfield County |
| US 285 Resurfacing in Park County | CDOT | No status printed | Construction Cost: $12.4M FACT | Jefferson and Park counties |
| CO 94 Eastern Plains Resurfacing | CDOT | Active Construction | Construction Cost: $12.3M FACT | Lincoln County |
| US 24 North Leadville Resurfacing | CDOT | Active Construction | Construction Cost: $12.3M FACT | Eagle and Lake counties |
| US 50 Blue Creek Sand Dome | CDOT | Archived Project | Cost: $12.3M FACT | Gunnison County |
| US 50 Resurfacing in Pueblo West | CDOT | Active Construction | Construction Cost: $12.3M FACT | Pueblo County |
| Parks & Wildlife — Property Acquisition & Improvements | CPW | Funded | $12.1M FACT | Statewide |
| This year’s budget line CPW Property acquisition and improvements | DNR | Requested, recommended | $12,100,000 FACT | NO SINGLE SITE Colorado Parks and Wildlife land acquisition and maintenance across the state park and wildlife-area system. |
| This year’s budget line Property Acquisition and Improvements | Division of Parks and Wildlife | Appropriated this year | $12,100,000 FACT | NO SINGLE SITE Colorado Parks and Wildlife land acquisition and maintenance across the state park and wildlife-area system. |
| CO 45 from Thatcher Avenue to US 50 | CDOT | Archived Project | Cost: $12M FACT | Pueblo County |
| CO 59 Resurfacing from Seibert to Cope | CDOT | Archived Project | Cost: $12M FACT | CDOT’s page names no county. |
| CO 92 Rogers Mesa Reconstruction | CDOT | Active Construction | Construction Cost: $12M FACT | Delta County |
| Federal Boulevard & 69th Bridge Replacement over BNSF & RTD Railroads | CDOT | Archived Project | Project Cost: $12M FACT | CDOT’s page names no county. |
| I-25 Rockrimmon Bridge Maintenance & Preventative Work | CDOT | No status printed | Cost: $12M FACT | CDOT’s page names no county. |
| US 24 Resurfacing from Divide to Woodland Park | CDOT | No status printed | Construction Cost: $12M FACT | Lake and Teller counties |
| US 40 Milner Resurfacing | CDOT | Active Construction | Construction Cost: $12M FACT | Routt County |
| CO 79 Improvements at WITHHELD Crossing in Bennett | CDOT | Archived Project | Cost: $11.9M FACT | CDOT’s page names no county. |
| I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road | CDOT | Active Construction | Construction Cost: $11.9M FACT | Larimer County |
| I-76 & CO 52 Roundabout Project in Hudson, CO | CDOT | No status printed | Cost: $11.7M FACT | CDOT’s page names no county. |
| CSU — Plant Sciences Building | CSU | Requested, not recommended | $11.5M FACT | Larimer County |
| This year’s budget line CSU Plant Sciences Building (CR) | IHE | Requested, not recommended | $11,467,163 FACT | Colorado State University Larimer County |
| US 24 Manitou Springs Resurfacing & Structural Improvements | CDOT | Archived Project | Cost: $11.5M FACT | El Paso County |
| DOC — Trinidad Wastewater Treatment Facility | DOC | Requested, not recommended | $11.4M FACT | Las Animas County |
| This year’s budget line Waste water treatment facility improvements, Trinidad (CR) | DOC | Requested, not recommended | $11,369,144 FACT | Trinidad Correctional Facility Las Animas County |
| CO 96 East of Westcliffe in Custer County | CDOT | Archived Project | Cost: $11.3M FACT | Custer County |
| DOC — Fire Alarm System Replacement, Fremont | DOC | Requested, not recommended | $11.3M FACT | Fremont County |
| This year’s budget line Fire alarm system replacement, Fremont (CR) | DOC | Requested, not recommended | $11,307,357 FACT | Fremont Correctional Facility Fremont County |
| Parks & Wildlife — Infrastructure & Real Property Maintenance | CPW | Funded | $11.3M FACT | Statewide |
| This year’s budget line CPW Infrastructure and property maintenance | DNR | Requested, recommended | $11,293,800 FACT | NO SINGLE SITE Colorado Parks and Wildlife land acquisition and maintenance across the state park and wildlife-area system. |
| This year’s budget line Infrastructure and Real Property Maintenance | Division of Parks and Wildlife | Appropriated this year | $11,293,800 FACT | NO SINGLE SITE Colorado Parks and Wildlife land acquisition and maintenance across the state park and wildlife-area system. |
| US 24 Resurfacing from Peyton to Calhan | CDOT | Active Construction | Construction Cost: $11.3M FACT | El Paso County |
| US 160 /491 Passing Lanes Addition | CDOT | No status printed | Cost: $11.2M FACT | CDOT’s page names no county. |
| US 160 Resurfacing Durango to Elmore's Corner | CDOT | Active Construction | Construction Cost: $11.2M FACT | La Plata County |
| I-25 Resurfacing from C-470 to Belleview Avenue | CDOT | No status printed | Cost: $11.1M FACT | CDOT’s page names no county. |
| I-70 Wolcott East | CDOT | No status printed | Cost: $11.1M FACT | CDOT’s page names no county. |
| CO 9 & US 6 in Dillon Resurfacing | CDOT | Archived Project | Cost: $11M FACT | CDOT’s page names no county. |
| I-70 West Vail Pass Resurfacing | CDOT | No status printed | Cost: $11M FACT | CDOT’s page names no county. |
| US 160 Wildlife Crossings - La Plata & Archuleta Counties | CDOT | No status printed | Cost: $11M FACT | CDOT’s page names no county. |
| US 24 South of Minturn Resurfacing | CDOT | Archived Project | Construction Cost: $11M FACT | Eagle County |
| US 24/Meridian Improvements in Falcon | CDOT | Archived Project | Cost: $11M FACT | El Paso County |
| US 491 & CO 184 Resurfacing in Southwest Colorado | CDOT | No status printed | Cost: $11M FACT | CDOT’s page names no county. |
| US 50 Westbound from RR Bridge to West of Pueblo Boulevard | CDOT | No status printed | Cost: $11M FACT | Pueblo County |
| US 6 Clear Creek Canyon Resurfacing and Safety Improvements | CDOT | Archived Project | Cost: $11M FACT | Jefferson County |
| Vasquez Boulevard Improvements: I-270 to 64th AvenuePacing: spending against the calendar, Vasquez Boulevard Improvements: I-270 to 64th Avenue | CDOT | Underway | Construction cost: $10.9M FACT | Adams County |
| US 160 Surface Treatment from Kim to Pritchett | CDOT | No status printed | Construction Cost: $10.8M FACT | Baca and Las Animas counties |
| US 50B Surface Treatment between Fowler and Manzanola | CDOT | No status printed | Cost: $10.8M FACT | CDOT’s page names no county. |
| CO 141 & CO 145 Surface Improvements | CDOT | Archived Project | Cost: $10.688M FACT | Montrose County |
| CO 64 Bridges West of Meeker | CDOT | Archived Project | Cost: $10.6M FACT | Rio Blanco County |
| I-76 Resurfacing in Adams, Denver and Jefferson Counties | CDOT | Active Construction | Construction Cost: $10.6M FACT | Adams, Denver and Jefferson counties |
| I-70 Vail East to West Resurfacing | CDOT | No status printed | Cost: $10.5M FACT | CDOT’s page names no county. |
| US 287 in Lamar from Park to Colonia | CDOT | No status printed | Cost: $10.5M FACT | Prowers County |
| US 85 Eaton to Ault Resurfacing | CDOT | No status printed | Cost: $10.5M FACT | CDOT’s page names no county. |
| US 160 & CO 370 Resurfacing and ADA Ramps in Monte Vista and Alamosa | CDOT | No status printed | Cost: $10.441M FACT | CDOT’s page names no county. |
| CO 115 Resurfacing in Colorado Springs | CDOT | No status printed | Construction Cost: $10.4M FACT | El Paso County |
| CO 67 Overlay | CDOT | Archived Project | Cost: $10.4M FACT | CDOT’s page names no county. |
| CSU — District Heating Plant | CSU | Requested, not recommended | $10.4M FACT | Larimer County |
| This year’s budget line CSU District heating plant sustainability upgrade (CR) | IHE | Requested, not recommended | $10,375,282 FACT | Colorado State University Larimer County |
| US 50 Granada, East and West | CDOT | No status printed | Cost: $10.3M FACT | Prowers County |
| Northwestern Community College — Weiss & Hefley Renovation | CNCC | Requested, not recommended | $10.2M FACT | Rio Blanco County |
| This year’s budget line Northwestern CC Weiss and Hefley renovation | IHE | Requested, not recommended | $10,212,695 FACT | Colorado Northwestern CC — Rangely Rio Blanco County |
| CO 13 Widening & Reconstruction Near Craig | CDOT | Archived Project | Cost: $10.1M FACT | CDOT’s page names no county. |
| C-470 Bridge over University Boulevard Improvements | CDOT | No status printed | Construction Cost: $10M FACT | Douglas County |
| CO 9 in Frisco: Main Street to Iron Springs | CDOT | Archived Project | Cost: $10M FACT | CDOT’s page names no county. |
| CO 96 Arkansas River to US 50B and CO 47 from US 50B to Pete Jimenez Boulevard | CDOT | Archived Project | Cost: $10M FACT | Pueblo County |
| Drew Dix Parkway Dillon Drive at I-25 Interchange | CDOT | Archived Project | Cost: $10M FACT | Pueblo County |
| Fort Lewis College — Southwest Campus Renewal | Fort Lewis | Requested, not recommended | $10.0M FACT | La Plata County |
| This year’s budget line Fort Lewis Southwest Campus renewal | IHE | Requested, not recommended | $10,006,795 FACT | Fort Lewis College La Plata County |
| I-76 at US 85 Reconstruction | CDOT | No status printed | Cost: $10M FACT | CDOT’s page names no county. |
| US 24 Buena Vista Enhancement | CDOT | Archived Project | Cost: $10M FACT | Chaffee County |
| US 34 & US 36 Resurfacing | CDOT | Archived Project | Construction Cost: $10M FACT | Larimer County |
| US 350 Resurfacing in Otero County | CDOT | Active Construction | Construction Cost: $10M FACT | Otero County |
| US 40 Resurfacing in Empire | CDOT | No status printed | Construction Cost: $10M FACT | Clear Creek County |
| US 50 Las Animas Bridge Repair | CDOT | No status printed | Construction Cost: $10M FACT | Bent County |
| US 6 Elk Creek Bridge Replacement in New CastlePacing: spending against the calendar, US 6 Elk Creek Bridge Replacement in New Castle | CDOT | Underway | Construction cost: $10.0M FACT | Garfield County |
| Wadsworth Boulevard Widening | CDOT | No status printed | Cost: $10M FACT | CDOT’s page names no county. |
| Workers’ Compensation Database Replacement | Department of Labor and Employment | Appropriated this year | $9,964,519 FACT | An IT project. The act names no place. |
| US 287 & US 50 Resurfacing & Improvements in Lamar | CDOT | No status printed | Cost: $9.9M FACT | CDOT’s page names no county. |
| US 6 East of Holyoke Resurfacing | CDOT | Archived Project | Construction Cost: $9.8M FACT | Phillips County |
| CO 109 A Resurfacing between La Junta & Kim | CDOT | Archived Project | Cost: $9.7M FACT | Baca, Las Animas and Otero counties |
| CO 17 Resurfacing from Antonito to New Mexico State Line | CDOT | Active Construction | Construction Cost: $9.7M FACT | Conejos County |
| I-225 Resurfacing from I-25 to Parker Road | CDOT | No status printed | Cost: $9.7M FACT | CDOT’s page names no county. |
| US 287 Passing Lanes between Kit Carson and Lamar | CDOT | No status printed | Cost: $9.7M FACT | CDOT’s page names no county. |
| CO 72 Coal Creek Canyon | CDOT | Archived Project | Cost: $9.55M FACT | Boulder County |
| I-70 B and CO 141 B Resurfacing Project in Mesa County | CDOT | Active Construction | Construction Cost: $9.5M FACT | Mesa County |
| US 287 and US 40 Passing Lanes | CDOT | No status printed | Cost: $9.4M FACT | CDOT’s page names no county. |
| I-70 over 32nd Avenue Bridge Replacement | CDOT | No status printed | Cost: $9.3M FACT | Jefferson County |
| US 160 Pagosa West Resurfacing | CDOT | Active Construction | Construction Cost: $9.3M FACT | Archuleta County |
| US 24 Johnson Village Chipseal | CDOT | Archived Project | Cost: $9.3M FACT | Chaffee County |
| I-70 Pavement Repairs from Chambers to E-470 | CDOT | Active Construction | Construction Cost: $9.2M FACT | Adams County |
| US 160 Walsenburg West Resurfacing | CDOT | Active Construction | Construction Cost: $9.2M FACT | Huerfano County |
| US 6/North Avenue Resurfacing | CDOT | Archived Project | Cost: $9.2M FACT | Mesa County |
| CO 45 Rehabilitation Work in Pueblo, from CO 96 to US 50 | CDOT | Archived Project | Cost: $9.1M FACT | CDOT’s page names no county. |
| US 50/US 550 Montrose Overlay | CDOT | No status printed | Cost: $9.1M FACT | CDOT’s page names no county. |
| I-70 Silverthorne to Eisenhower Johnson Memorial Tunnel Resurfacing Project | Phase 2 | CDOT | Active Construction | Construction Cost: $9M FACT | Summit County |
| Southwestern Colorado Culvert Repairs | CDOT | Active Construction | Construction Cost: $9M FACT | Archuleta, Conejos, La Plata, Montezuma, Rio Grande and Saguache counties |
| US 160-CR 225 Intersection Improvements | Design Phase | CDOT | Active Construction | Cost: $9M FACT | CDOT’s page names no county. |
| US 50C Overlay & Drainage Improvements in Pueblo | CDOT | News | Cost: $9M FACT | Pueblo County |
| US 85: I-76 to 168th Avenue Resurfacing | CDOT | No status printed | Cost: $9M FACT | CDOT’s page names no county. |
| CSU San Luis Valley potato research and storage facility | IHE | Requested, not recommended | $8,964,491 FACT | CSU San Luis Valley Research Center Rio Grande County |
| CO 52 Resurfacing between I-25 & US 85 | CDOT | Active Construction | Construction Cost: $8.9M FACT | Weld County |
| CO 7 Resurfacing between I-25 & Brighton | CDOT | No status printed | Construction Cost: $8.9M FACT | Adams County |
| I-70 Silverthorne to Eisenhower Johnson Memorial Tunnel Resurfacing Project | Phase 1 | CDOT | No status printed | Cost: $8.9M FACT | CDOT’s page names no county. |
| US 40/CO 287 Boyero Bridge Replacement | CDOT | No status printed | Construction Cost: $8.9M FACT | Lincoln County |
| CO 116 Two Buttes Resurfacing | CDOT | Archived Project | Cost: $8.8M FACT | CDOT’s page names no county. |
| Southwestern Colorado Rumble Strip Installation | CDOT | No status printed | Cost: $8.8M FACT | CDOT’s page names no county. |
| CO 16 & CO 21 (Powers Boulevard) - Syracuse to Bradley | CDOT | Archived Project | Cost: $8.7M FACT | El Paso County |
| CR 314 Idaho Springs to Veterans Memorial Tunnel | CDOT | Archived Project | Cost: $8.7M FACT | CDOT’s page names no county. |
| US 160 La Veta Pass Resurfacing Project | CDOT | No status printed | Cost: $8.614M FACT | CDOT’s page names no county. |
| US 6 Improvements in Sterling | CDOT | Archived Project | Cost: $8.6M FACT | Logan County |
| CO 14 Pawnee Pass to Sterling Resurfacing | CDOT | Archived Project | Cost: $8.5M FACT | Logan County |
| US 24 East Resurfacing from Falcon to Peyton | CDOT | Archived Project | Construction Cost: $8.5M FACT | El Paso County |
| CO 3 at Ewing Mesa Road Intersection Improvements | CDOT | No status printed | Construction Cost: $8.3M FACT | La Plata County |
| Aurora CC Classroom building third floor renovation | IHE | Requested, not recommended | $8,287,776 FACT | Community College of Aurora Arapahoe County |
| CO 52 Prospect Valley Resurfacing | CDOT | Archived Project | Cost: $8.2M FACT | CDOT’s page names no county. |
| I-70 Rulison to Rifle Resurfacing | CDOT | Archived Project | Construction Cost: $8.2M FACT | Garfield County |
| US 160 & Wilson Gulch Road Extension | CDOT | No status printed | Cost: $8.2M FACT | La Plata County |
| CO 72 Frontage Road to Indiana Street Resurfacing | CDOT | Archived Project | Cost: $8.098M FACT | CDOT’s page names no county. |
| CO 139 Douglas Pass Resurfacing Project | CDOT | Archived Project | Cost: $8M FACT | Garfield County |
| CO 141 Resurfacing near Gateway | CDOT | No status printed | Construction Cost: $8M FACT | Mesa County |
| I-25 Near Aguilar | CDOT | No status printed | Cost: $8M FACT | Huerfano and Las Animas counties |
| I-70 Wadsworth to Pecos Resurfacing | CDOT | No status printed | Cost: $8M FACT | CDOT’s page names no county. |
| Resurfacing on I-70 in Mesa County | CDOT | No status printed | Construction Cost: $8M FACT | Mesa County |
| CO 63 Resurfacing North & South of Akron | CDOT | No status printed | Construction Cost: $7.9M FACT | Washington County |
| US 160 Wolf Creek Pass Fiber & Safety Systems | CDOT | No status printed | Cost: $7.9M FACT | Archuleta and Mineral counties |
| US 6 Repaving East of Sterling | CDOT | Archived Project | Cost: $7.9M FACT | Logan County |
| CO 151 Resurfacing & Culvert Improvement in La Plata/Archuleta County | CDOT | No status printed | Construction Cost: $7.8M FACT | Archuleta and La Plata counties |
| CO 96C Resurfacing from Ordway to Arlington | CDOT | Archived Project | Cost: $7.8M FACT | Crowley, Kiowa and Otero counties |
| I-70 Concrete Slab Replacement Project | CDOT | Active Construction | Cost: $7.8M FACT | CDOT’s page names no county. |
| CO 82 Snowmass Canyon Resurfacing | CDOT | Archived Project | Construction Cost: $7.7M FACT | Pitkin County |
| CO 167 & CO 96 Bridge & ADA Improvements | CDOT | Archived Project | Cost: $7.6M FACT | Otero County |
| Hampden Resurfacing Project | CDOT | No status printed | Cost: $7.6M FACT | CDOT’s page names no county. |
| US 34 Resurfacing North of Granby | CDOT | Archived Project | Cost: $7.6M FACT | Grand County |
| US 85 (Santa Fe) Resurfacing in Denver and Arapahoe Counties | CDOT | No status printed | Cost: $7.6M FACT | CDOT’s page names no county. |
| CO 13 North of Piceance Creek | CDOT | Archived Project | Cost: $7.5M FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Bridge Joint Improvements | CDOT | Active Construction | Construction Cost: $7.5M FACT | Eagle and Garfield counties |
| I-76 Cable Rail Project - Wiggins to Brush | CDOT | Active Construction | Construction Cost: $7.5M FACT | Morgan County |
| US 160 Mesa Verde Bridge Coating | CDOT | No status printed | Cost: $7.5M FACT | Montezuma County |
| US 160 Resurfacing from US 84 East to Treasure Falls | CDOT | No status printed | Cost: $7.5M FACT | CDOT’s page names no county. |
| US 40 & Downhill Drive Intersection Improvements | CDOT | Active Construction | Construction Cost: $7.5M FACT | Routt County |
| US 50 Delta Resurfacing | CDOT | Active Construction | Construction Cost: $7.5M FACT | Delta County |
| US 50 Passing Lane - Gunnison County | CDOT | Active Construction | Cost: $7.499M FACT | Gunnison County |
| Denver Metro Bridge Maintenance | CDOT | No status printed | Construction Cost: $7.4M FACT | Adams and Arapahoe counties |
| US 285/US 50 Intersection and Surface Improvements | CDOT | No status printed | Construction Cost: $7.4M FACT | Chaffee County |
| CO 82 Resurfacing from Glenwood Springs to Carbondale | CDOT | Archived Project | Cost: $7.3M FACT | CDOT’s page names no county. |
| I-25 Bridge Replacement at Butte Creek | CDOT | No status printed | Cost: $7.3M FACT | CDOT’s page names no county. |
| US 40 Berthoud Pass Paving Project | CDOT | Archived Project | Construction Cost: $7.3M FACT | Grand County |
| US 6 Resurfacing from Rifle to New Castle | CDOT | Archived Project | Cost: $7.3M FACT | Garfield County |
| CO 67 Widening in Woodland Park | CDOT | Active Construction | Construction Cost: $7.2M FACT | Teller County |
| I-70 Bridge Repairs in Arapahoe County | CDOT | Active Construction | Construction Cost: $7.2M FACT | Arapahoe County |
| US 160 Wolf Creek Pass East | CDOT | No status printed | Cost: $7.15M FACT | Mineral County |
| US 6 Palisade Intersection Improvements | CDOT | Active Construction | Construction Cost: $7.1M FACT | Mesa County |
| CO 13 North of Craig Resurfacing | CDOT | Archived Project | Cost: $7M FACT | CDOT’s page names no county. |
| I-25 Resurfacing North of Walsenburg Project | CDOT | Active Construction | Cost: $7M FACT | Huerfano County |
| US 24 Leadville South Improvements | CDOT | Archived Project | Cost: $7M FACT | Chaffee and Lake counties |
| US 50 Paving West of Texas Creek | CDOT | No status printed | Cost: $7M FACT | CDOT’s page names no county. |
| US 550 Paco - Billy Wildlife & Safety Improvements | CDOT | No status printed | Construction Cost: $7M FACT | Ouray County |
| US 6 New Castle Roundabout | CDOT | Archived Project | Construction Cost: $7M FACT | Garfield County |
| CO 119 Resurfacing in Nederland | CDOT | Archived Project | Construction Cost: $6.9M FACT | Boulder County |
| CO 392 Resurfacing Lucerne to Briggsdale | CDOT | Archived Project | Cost: $6.9M FACT | Weld County |
| I-76 Brush to Merino | CDOT | No status printed | Cost: $6.9M FACT | CDOT’s page names no county. |
| US 6 & US 24 Improvements in Minturn | CDOT | Archived Project | Cost: $6.8M FACT | CDOT’s page names no county. |
| CO 10 Overlay La Junta West | CDOT | Archived Project | Cost: $6.7M FACT | CDOT’s page names no county. |
| CO 318 Resurfacing in Moffat County | CDOT | No status printed | Cost: $6.7M FACT | Moffat County |
| CO 61 Resurfacing East of Sterling | CDOT | Archived Project | Construction Cost: $6.7M FACT | Logan County |
| I-70 Repaving & Guardrail Replacement Between Vail Pass & Officers Gulch | CDOT | No status printed | Cost: $6.7M FACT | CDOT’s page names no county. |
| Lamar CC Trustees Building renovation | IHE | Requested, not recommended | $6,618,378 FACT | Lamar Community College Prowers County |
| CO 141 Resurfacing Between Gateway & Whitewater | CDOT | Archived Project | Cost: $6.6M FACT | Mesa County |
| CO 9 Surface Treatment in Summit and Grand County | CDOT | Archived Project | Construction Cost: $6.6M FACT | Grand and Summit counties |
| I-25 and CO 21 (Powers Blvd) Water Quality Project | CDOT | No status printed | Cost: $6.6M FACT | CDOT’s page names no county. |
| US 24 Trout Creek Pass Passing Lanes | CDOT | Archived Project | Cost: $6.6M FACT | Chaffee County |
| CO 74 Resurfacing in Evergreen | CDOT | Active Construction | Construction Cost: $6.5M FACT | Jefferson County |
| US 160 Wildlife Crossing at Dry Creek | CDOT | No status printed | Cost: $6.5M FACT | La Plata County |
| US 24 Resurfacing North of Buena Vista | CDOT | Active Construction | Construction Cost: $6.5M FACT | Chaffee and Lake counties |
| US 85 Platteville Resurfacing | CDOT | No status printed | Cost: $6.42M FACT | CDOT’s page names no county. |
| Pikes Peak State College Window replacement, Centennial Campus (CR) | IHE | Requested, not recommended | $6,411,116 FACT | Pikes Peak State College El Paso County |
| CO 60 Bridge Replacement Over the South Platte River | CDOT | Archived Project | Cost: $6.4M FACT | Weld County |
| US 40 Rabbit Ears Pass Repairs & Resurfacing | CDOT | Archived Project | Cost: $6.4M FACT | Routt County |
| US 40 Resurfacing Project from Sand Springs Gulch to Craig | CDOT | Archived Project | Cost: $6.4M FACT | Moffat County |
| US 287 Intersection Improvements in Fort Collins | CDOT | Active Construction | Construction Cost: $6.38M FACT | Larimer County |
| CO 177 (University Boulevard) Resurfacing from Arapahoe Road to Hampden Avenue | CDOT | Archived Project | Cost: $6.3M FACT | CDOT’s page names no county. |
| CO 21 Powers Boulevard Widening Fountain Boulevard to Platte Avenue | CDOT | Archived Project | Cost: $6.3M FACT | El Paso County |
| I-70 Parachute to Rulison Resurfacing | CDOT | No status printed | Cost: $6.3M FACT | CDOT’s page names no county. |
| US 160 East Wolf Creek Resurfacing | CDOT | No status printed | Cost: $6.3M FACT | CDOT’s page names no county. |
| C-470 & Quincy Roundabouts | CDOT | No status printed | Construction Cost: $6.2M FACT | Jefferson County |
| CO 145/US 160 Cortez, Dolores, Rico Heater Repave | CDOT | Archived Project | Cost: $6.2M FACT | CDOT’s page names no county. |
| CO 340 Resurfacing in Mesa County | CDOT | Active Construction | Construction Cost: $6.2M FACT | Mesa County |
| CO 64 & CO 13 Meeker Resurfacing | CDOT | Archived Project | Construction Cost: $6.2M FACT | Rio Blanco County |
| CO 82 Basalt Pedestrian Underpass | CDOT | Archived Project | Cost: $6.2M FACT | Pitkin County |
| Federal Boulevard (CO 88) Reconstruction from W. Holden Place to W. 7th Avenue | CDOT | Archived Project | Cost: $6.2M FACT | CDOT’s page names no county. |
| I-25 Douglas County Concrete Rehabilitation | CDOT | No status printed | Cost: $6.2M FACT | CDOT’s page names no county. |
| US 24/US 285 Overlay, Trout Creek Pass East | CDOT | Archived Project | Cost: $6.2M FACT | Park County |
| US 50 Surface Improvements in Bent County | CDOT | No status printed | Construction Cost: $6.154M FACT | Bent County |
| I-25 South Fiber Optic Installation | CDOT | No status printed | Cost: $6.1M FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Emergency Project | CDOT | No status printed | Cost: $6.1M FACT | CDOT’s page names no county. |
| CO 207 & CO 266 Resurfacing | CDOT | Archived Project | Cost: $6.049M FACT | Crowley and Otero counties |
| CO 13 Mud Springs Draw Reconstruction | CDOT | Archived Project | Cost: $6M FACT | CDOT’s page names no county. |
| CO 257 Resurfacing US 34 Business to Walnut Street | CDOT | Archived Project | Construction Cost: $6M FACT | Weld County |
| US 160 and US 550 in Durango: Concrete Rehabilitation | CDOT | No status printed | Cost: $6M FACT | CDOT’s page names no county. |
| US 160 Roadway Improvements in Southwestern Colorado | CDOT | No status printed | Construction Cost: $6M FACT | Archuleta and La Plata counties |
| US 17 Alamosa to Hooper | CDOT | Archived Project | Cost: $6M FACT | Alamosa County |
| US 50 Emergency Bridge Improvements | CDOT | No status printed | Estimated Construction Cost: $6M FACT | Gunnison, Hinsdale and Montrose counties |
| CO 1 Wellington South Resurfacing | CDOT | Archived Project | Cost: $5.9M FACT | CDOT’s page names no county. |
| CO 52 Reclamation & Overlay | CDOT | Archived Project | Cost: $5.9M FACT | CDOT’s page names no county. |
| I-25 Resurfacing & Safety Improvements in Walsenburg | CDOT | Archived Project | Construction Cost: $5.9M FACT | Huerfano County |
| I-70 Glenwood Canyon Variable Speed Limit Sign Installation | CDOT | No status printed | Cost: $5.9M FACT | CDOT’s page names no county. |
| I-70 Improvements from Frisco to Silverthorne | CDOT | No status printed | Cost: $5.9M FACT | CDOT’s page names no county. |
| US 385 Resurfacing in Yuma County | CDOT | No status printed | Cost: $5.9M FACT | CDOT’s page names no county. |
| US 6 Avon to Dowd Junction Resurfacing | CDOT | Archived Project | Cost: $5.9M FACT | CDOT’s page names no county. |
| US 36 & CO 66 Information Technology Services Devices & Fiber Installation | CDOT | Active Construction | Construction Cost: $5.89M FACT | Boulder and Larimer counties |
| CO 392 Windsor to Lucerne | CDOT | Archived Project | Cost: $5.8M FACT | CDOT’s page names no county. |
| I-70 Noise Wall Replacement in Denver | CDOT | No status printed | Cost: $5.8M FACT | CDOT’s page names no county. |
| US 50 Enhancements Southeast of Salida | CDOT | No status printed | Cost: $5.7M FACT | CDOT’s page names no county. |
| CO 14 Resurfacing from Lemay Street to I-25 | CDOT | Archived Project | Cost: $5.6M FACT | CDOT’s page names no county. |
| CO 194 in Bent County – Surface Treatments & Drainage Improvements | CDOT | Archived Project | Construction Cost: $5.6M FACT | Bent and Las Animas counties |
| Eastbound US 50 Resurfacing West of Delta | CDOT | Archived Project | Cost: $5.6M FACT | CDOT’s page names no county. |
| I-70 Resurfacing & Guardrail Replacement from Officers Gulch to Frisco | CDOT | No status printed | Cost: $5.6M FACT | CDOT’s page names no county. |
| I-70B/US 6 Interchange Improvements in Grand Junction | CDOT | No status printed | Cost: $5.6M FACT | CDOT’s page names no county. |
| US 6 & CO 141 Resurfacing | CDOT | Archived Project | Cost: $5.6M FACT | Mesa County |
| CO 52 Resurfacing East of Hudson | CDOT | Archived Project | Construction Cost: $5.5M FACT | Weld County |
| CO 60 Resurfacing: US 287 to Milliken | CDOT | Archived Project | Cost: $5.5M FACT | CDOT’s page names no county. |
| CO 14 & CO 125 Resurfacing in Walden | CDOT | Archived Project | Cost: $5.4M FACT | Jackson County |
| CO 14 Paving from Briggsdale to New Raymer | CDOT | Archived Project | Cost: $5.4M FACT | CDOT’s page names no county. |
| CO 145 Passing Lane Addition North of Telluride | CDOT | Archived Project | Cost: $5.4M FACT | CDOT’s page names no county. |
| CO 65 Mesa North Resurfacing | CDOT | Archived Project | Cost: $5.4M FACT | CDOT’s page names no county. |
| CO 69 Overlay from Westcliffe to Hillside | CDOT | Archived Project | Cost: $5.4M FACT | CDOT’s page names no county. |
| I-25 Resurfacing South of Trinidad | CDOT | No status printed | Cost: $5.4M FACT | CDOT’s page names no county. |
| US 24 Resurfacing Manitou Springs to Chipita Park | CDOT | Archived Project | Cost: $5.4M FACT | El Paso County |
| US 40 Passing Lanes in Grand County | CDOT | Active Construction | Construction Cost: $5.4M FACT | Grand County |
| US 550 Camino del Rio Center Medians & Signal Improvements in Durango | CDOT | No status printed | Cost: $5.4M FACT | CDOT’s page names no county. |
| CO 144 Flood Repairs & Upgrades Near Orchard | CDOT | Archived Project | Cost: $5.3M FACT | CDOT’s page names no county. |
| CO 145 Overlay North of Rico | CDOT | Archived Project | Cost: $5.3M FACT | Dolores County |
| CO 149 Spring Creek Pass North | CDOT | Archived Project | Cost: $5.3M FACT | Hinsdale County |
| CO 95 (Sheridan Boulevard) Repaving & Repairs from Arizona Avenue to Hampden Avenue (US 285) | CDOT | Archived Project | Cost: $5.3M FACT | Jefferson County |
| I-70 Resurfacing from Horizon Drive to Clifton | CDOT | Active Construction | Construction Cost: $5.3M FACT | Mesa County |
| Pike's Peak Area Traffic Signals | CDOT | No status printed | Cost: $5.3M FACT | CDOT’s page names no county. |
| US 34 North Fork River Bridges Replacement | CDOT | Archived Project | Cost: $5.3M FACT | Yuma County |
| US 40 Rabbit Ears East Resurfacing | CDOT | Archived Project | Cost: $5.3M FACT | Jackson and Routt counties |
| I-70 Exit 31 Horizon Drive Roundabouts | CDOT | No status printed | Cost: $5.25M FACT | CDOT’s page names no county. |
| CO 121 Rehabilitation in Lakewood | CDOT | Archived Project | Cost: $5.2M FACT | Jefferson County |
| CO 52 Resurfacing from WCR 95 to MCR 5 | CDOT | No status printed | Construction Cost: $5.2M FACT | Morgan and Weld counties |
| Eisenhower-Johnson Memorial Tunnel Resurfacing | CDOT | Archived Project | Cost: $5.2M FACT | CDOT’s page names no county. |
| I-25 Overlay - Circle Drive and Nevada Exit | CDOT | No status printed | Cost: $5.2M FACT | El Paso County |
| I-70 Rural Bridge Rehabilitation | CDOT | Active Construction | Construction Cost: $5.2M FACT | Kit Carson and Lincoln counties |
| I-70 Vail Pass Barrier Replacement | CDOT | No status printed | Cost: $5.2M FACT | CDOT’s page names no county. |
| US 160 and CO 100 Resurfacing in Baca County | CDOT | No status printed | Cost: $5.2M FACT | CDOT’s page names no county. |
| US 24 Leadville Overlay & ADA Ramps | CDOT | Archived Project | Cost: $5.2M FACT | Lake County |
| US 287 & CO 52 Intersection Safety Improvements | CDOT | Active Construction | Cost: $5.1M FACT | Boulder County |
| US 85 Platteville Resurfacing Between CO 60 and CO 66 | CDOT | Active Construction | Construction Cost: $5.1M FACT | Weld County |
| I-70 Bridge Maintenance between Limon and Agate | CDOT | Active Construction | Cost: $5.099M FACT | Elbert County |
| I-270 & US 36 Bridge Preventative Maintenance | CDOT | Active Construction | Construction Cost: $5.075M FACT | Adams and Denver counties |
| US 160 Cortez & Durango Concrete Repairs | CDOT | No status printed | Cost: $5.02M FACT | CDOT’s page names no county. |
| CO 138 Logan County Widening Project | CDOT | Archived Project | Construction Cost: $5M FACT | Logan County |
| CO 159 Resurfacing Fort Garland to San Luis | CDOT | Archived Project | Cost: $5M FACT | CDOT’s page names no county. |
| CO 30/Gun Club Road Widening at Hampden | CDOT | Archived Project | Construction Cost: $5M FACT | Arapahoe County |
| CO 340 Redlands Roundabout | CDOT | Archived Project | Cost: $5M FACT | CDOT’s page names no county. |
| CO 64 Rangely East/US 40 Surface Treatment | CDOT | Archived Project | Cost: $5M FACT | Rio Blanco County |
| CO 7 Cherryvale Road to 28th Street Resurfacing | CDOT | No status printed | Construction Cost: $5M FACT | Boulder County |
| CO 71 Bridge Replacement between Rocky Ford & Hawley | CDOT | Archived Project | Cost: $5M FACT | CDOT’s page names no county. |
| CO 71 Resurfacing South of CO 14 | CDOT | No status printed | Construction Cost: $5M FACT | Morgan and Weld counties |
| CO 82 Aspen Roundabout | CDOT | Archived Project | Cost: $5M FACT | CDOT’s page names no county. |
| CO 86 Bridge Replacement in Kiowa | CDOT | Active Construction | Construction Cost: $5M FACT | Elbert County |
| CO 93 Resurfacing between US 6 & 58th Avenue | CDOT | Archived Project | Cost: $5M FACT | Jefferson County |
| Colfax Resurfacing and Pedestrian Improvements | CDOT | No status printed | Cost: $5M FACT | CDOT’s page names no county. |
| CU Boulder — Guggenheim Geography Renovation | CU Boulder | Requested, not recommended | $5.0M FACT | Boulder County |
| This year’s budget line CU Boulder Guggenheim Geography Building renovation | IHE | Requested, not recommended | $5,022,196 FACT | University of Colorado Boulder Boulder County |
| Eastern Plains Timber Bridge Repairs | CDOT | Archived Project | Construction Cost: $5M FACT | CDOT’s page names no county. |
| Federal Boulevard Resurfacing and Curb Ramp Replacement between I-70 and Colfax Avenue | CDOT | No status printed | Cost: $5M FACT | CDOT’s page names no county. |
| I-270 Bridge Preventative Maintenance | CDOT | Active Construction | Construction Cost: $5M FACT | Adams County |
| I-70 Bridge Repairs at Kipling & Garrison | CDOT | Active Construction | Construction Cost: $5M FACT | Jefferson County |
| I-70 East of DeBeque Resurfacing | CDOT | No status printed | Cost: $5M FACT | Garfield and Mesa counties |
| I-70 Eastbound Resurfacing in Clear Creek County | CDOT | No status printed | Construction Cost: $5M FACT | Clear Creek County |
| I-70 Glenwood Canyon/Grizzly Creek Rockfall Fence | CDOT | No status printed | Cost: $5M FACT | CDOT’s page names no county. |
| I-70 Resurfacing West of Parachute | CDOT | No status printed | Cost: $5M FACT | CDOT’s page names no county. |
| I-70 Variable Speed Limit Signs in Dowd Canyon | CDOT | No status printed | Construction Cost: $5M FACT | Eagle County |
| Park County Chain-Up Stations | CDOT | No status printed | Cost: $5M FACT | CDOT’s page names no county. |
| Sign Improvements in Park & Summit Counties | CDOT | Active Construction | Construction Cost: $5M FACT | Park and Summit counties |
| US 160 McCabe Creek Culvert Replacement in Pagosa Springs | CDOT | No status printed | Cost: $5M FACT | CDOT’s page names no county. |
| US 287 Surface Improvement Project | CDOT | No status printed | Construction Cost: $5M FACT | Baca County |
| US 34 Timber Bridge Replacement East of Laird | CDOT | Archived Project | Construction Cost: $5M FACT | Yuma County |
| US 36 Resurfacing 28th to Table Mesa Drive | CDOT | Archived Project | Cost: $5M FACT | Boulder County |
| US 6 Tunnel Lights & Intelligent Transportation Systems (ITS) | CDOT | Archived Project | Cost: $5M FACT | Clear Creek and Jefferson counties |
| US 85 at WCR 66 Acceleration Lanes in North Greeley | CDOT | Active Construction | Construction Cost: $5M FACT | Weld County |
| US 85 Concrete Panel Replacement | CDOT | No status printed | Construction Cost: $5M FACT | Weld County |
| US 287 Passing Lanes South of Lamar | CDOT | No status printed | Cost: $4.98M FACT | CDOT’s page names no county. |
| CO 69 Walsenburg Shoulder Widening & Safety Improvements | CDOT | Active Construction | Construction Cost: $4.978M FACT | Huerfano County |
| CO 45 Between I-25 and Thatcher Avenue | CDOT | Archived Project | Cost: $4.9M FACT | Pueblo County |
| CO 47 Bonforte Bridge Work | CDOT | Archived Project | Cost: $4.9M FACT | Pueblo County |
| CO 59 Resurfacing in Kit Carson | CDOT | No status printed | Construction Cost: $4.9M FACT | Cheyenne County |
| CO 82 Twin Lakes Resurfacing | CDOT | No status printed | Construction Cost: $4.9M FACT | Lake County |
| US 550 Red Mountain Pass | CDOT | No status printed | Cost: $4.9M FACT | CDOT’s page names no county. |
| Vine Drive Bridge Replacement Over I-25 North of Fort Collins | CDOT | No status printed | Cost: $4.9M FACT | CDOT’s page names no county. |
| US 160 Widening Near La Veta | CDOT | No status printed | Cost: $4.86M FACT | CDOT’s page names no county. |
| CO 74 Evergreen Lake North Trail | CDOT | Archived Project | Cost: $4.85M FACT | Jefferson County |
| Reimagining Colorado’s Benefit Management System | Department of Human Services | Appropriated this year | $4,823,806 FACT | An IT project. The act names no place. |
| I-70 Vail Chain Station Improvements | CDOT | No status printed | Cost: $4.82M FACT | CDOT’s page names no county. |
| CO 139 Road & Guardrail Repairs on Douglas Pass | CDOT | Archived Project | Cost: $4.8M FACT | Garfield County |
| Roadway & Bridge Repairs on US Highway 34D (Business Route) in Greeley | CDOT | No status printed | Cost: $4.8M FACT | CDOT’s page names no county. |
| US 40 Winter Park Resurfacing | CDOT | No status printed | Construction Cost: $4.8M FACT | Grand County |
| Wadsworth (CO 121) Resurfacing from I-70 to 65th Avenue | CDOT | No status printed | Cost: $4.8M FACT | CDOT’s page names no county. |
| CO 96 Haswell East & West | CDOT | Archived Project | Cost: $4.7M FACT | Kiowa County |
| I-70 Resurfacing from 32nd Avenue to 44th Avenue | CDOT | No status printed | Cost: $4.7M FACT | CDOT’s page names no county. |
| US 40 Fraser Flats Resurfacing | CDOT | Active Construction | Construction Cost: $4.7M FACT | Grand County |
| CO 67 Overlay Wetmore to Florence | CDOT | Archived Project | Cost: $4.623M FACT | CDOT’s page names no county. |
| Adams County Curb Ramp Removal & Replacement | CDOT | No status printed | Cost: $4.6M FACT | Adams and Broomfield counties |
| CO 119 & CO 7 Resurfacing | CDOT | Active Construction | Construction Cost: $4.6M FACT | Boulder County |
| CO 12 Bridge Replacement in Las Animas County | CDOT | Archived Project | Cost: $4.6M FACT | Las Animas County |
| I-70 Wildlife Safety Fencing Improvements from Rifle to De Beque | CDOT | No status printed | Cost: $4.6M FACT | CDOT’s page names no county. |
| US 6 Improvements Over Loveland Pass | CDOT | Archived Project | Cost: $4.6M FACT | Clear Creek and Summit counties |
| US 85 Resurfacing North of Fort Lupton | CDOT | No status printed | Cost: $4.6M FACT | CDOT’s page names no county. |
| Otero College McDivitt Hall cosmetology and barbering addition/remodel | IHE | Requested, not recommended | $4,593,895 FACT | Otero College Otero County |
| CO 350 East & West of Las Animas | CDOT | Archived Project | Cost: $4.5M FACT | Otero County |
| CO 65 Orchard City Resurfacing | CDOT | Active Construction | Construction Cost: $4.5M FACT | Delta County |
| CO 86 Resurfacing & Bridge Repairs from East of Kiowa to I-70 | CDOT | Archived Project | Cost: $4.5M FACT | CDOT’s page names no county. |
| El Paso County Bridge Maintenance | CDOT | Archived Project | Cost: $4.5M FACT | CDOT’s page names no county. |
| I-25 Cable Tension Barrier in Weld/Larimer Counties | CDOT | No status printed | Cost: $4.5M FACT | CDOT’s page names no county. |
| I-70 Improvements Georgetown to Empire | CDOT | No status printed | Cost: $4.5M FACT | CDOT’s page names no county. |
| Southwestern Colorado Chain Station Improvements | CDOT | No status printed | Construction Cost: $4.5M FACT | Chaffee, Costilla, Gunnison, Mineral and San Miguel counties |
| US 160 & CO 17 Intersection Improvements | CDOT | No status printed | Cost: $4.5M FACT | CDOT’s page names no county. |
| US 287 Passing Lanes South of Springfield and Campo | CDOT | No status printed | Cost: $4.5M FACT | CDOT’s page names no county. |
| US 6 & Post Boulevard Roundabout in Avon | CDOT | Archived Project | Construction Cost: $4.5M FACT | Eagle County |
| Fire Alarm Improvements, Four Mile Correctional Center | Department of Corrections | Appropriated this year | $4,470,890 FACT | Four Mile Correctional Center Fremont County |
| CO 2 & CO 95 Safety Improvements | CDOT | Archived Project | Cost: $4.4M FACT | Denver and Jefferson counties |
| CO 64 Resurfacing in West Rural Meeker | CDOT | Archived Project | Cost: $4.4M FACT | CDOT’s page names no county. |
| I-25 Bridge Preventative Maintenance in Adams County | CDOT | No status printed | Construction Cost: $4.4M FACT | Adams County |
| US 36 from Strasburg to Byers | CDOT | Archived Project | Cost: $4.4M FACT | Arapahoe County |
| US 50 Improvements at Sargents | CDOT | No status printed | Cost: $4.4M FACT | CDOT’s page names no county. |
| US 84 Slope Repair in Archuleta County | CDOT | No status printed | Construction Cost: $4.4M FACT | Archuleta County |
| Electric vehicle charging infrastructure | DPA | Requested, not recommended | $4,341,476 FACT | NO SINGLE SITE Electric-vehicle charging appropriated across the state fleet’s locations. |
| CO 157 Pavement Rehabilitation | CDOT | Active Construction | Construction Cost: $4.3M FACT | Boulder County |
| Adams State Admissions welcome center | IHE | Requested, not recommended | $4,292,449 FACT | Adams State University Alamosa County |
| CO 13 Yampa River Bridge Repair | CDOT | Archived Project | Cost: $4.2M FACT | CDOT’s page names no county. |
| CO 69 Improvements Between Westcliffe & Walsenburg | CDOT | Archived Project | Cost: $4.2M FACT | CDOT’s page names no county. |
| I-70 and I-25 Interchange Bridge Repairs | CDOT | No status printed | Cost: $4.2M FACT | CDOT’s page names no county. |
| US 36 Surface & Safety Improvements between Boulder & Lyons | CDOT | Archived Project | Construction Cost: $4.2M FACT | Boulder County |
| Upgrade Heat Plant Controls System, Building CMHHIP | Department of Human Services | Appropriated this year | $4,188,372 FACT | Colorado Mental Health Hospital, Pueblo Pueblo County |
| Fire Alarm Upgrade, Lawrence Street Center | University of Colorado - Denver | Appropriated this year | $4,100,768 FACT | University of Colorado Denver Denver County |
| CO 7 Bike Lane Shoulder Widening | CDOT | No status printed | Construction Cost: $4.1M FACT | Boulder, Broomfield and Weld counties |
| US 287 from 120th Avenue South Resurfacing | CDOT | No status printed | Cost: $4.1M FACT | CDOT’s page names no county. |
| Pavement marking in Southeastern Colorado | CDOT | No status printed | Construction Cost: $4.074M FACT | Bent, Douglas, El Paso, Huerfano, Las Animas, Park, Prowers, Pueblo and Teller counties |
| Social Health Information Exchange Project | Department of Health Care Policy and Financing | Appropriated this year | $4,049,989 FACT | An IT project. The act names no place. |
| Systems Renovation, Brown Hall and Modular Classrooms | Colorado School for the Deaf and the Blind | Appropriated this year | $4,030,257 FACT | Colorado School for the Deaf and the Blind El Paso County |
| I-70 Eagle Essential Wall Repair | CDOT | Active Construction | Construction Cost: $4.029M FACT | Eagle County |
| 6th Avenue Mill and Fill: Potomac Street to North Airport Boulevard | CDOT | Archived Project | Cost: $4M FACT | CDOT’s page names no county. |
| Concrete Panel Replacement in Three Counties | CDOT | Past Construction, Archived Project | Cost: $4M FACT | CDOT’s page names no county. |
| I-76 Fiber Optic Installation | CDOT | No status printed | Cost: $4M FACT | CDOT’s page names no county. |
| US 85 & US 34 Interchange Improvements | CDOT | No status printed | Construction Cost: $4M FACT | Weld County |
| Baptist Road & Terrazzo Drive Roundabout in Monument | CDOT | No status printed | Construction Cost: $3.9M FACT | El Paso County |
| CO 121 Signal Improvements in Jefferson County | CDOT | Archived Project | Construction Cost: $3.9M FACT | Jefferson County |
| CO 133 Rockfall Project North of McClure Pass to South of Carbondale | CDOT | Archived Project | Construction Cost: $3.9M FACT | Pitkin County |
| CO 83 Resurfacing in Douglas County | CDOT | Archived Project | Construction Cost: $3.9M FACT | Douglas County |
| US 160 Del Norte Revitalization | CDOT | Active Construction | Construction Cost: $3.9M FACT | CDOT’s page names no county. |
| C-470 and I-76 Ramp Signalization | CDOT | Archived Project | Cost: $3.8M FACT | Denver County |
| Chain Station Technology & Communications Upgrades | CDOT | Active Construction | Construction Cost: $3.8M FACT | Clear Creek, Eagle, El Paso, Jefferson, Las Animas and Summit counties |
| CO 7 Resurfacing from Boulder to Lafayette | CDOT | Archived Project | Construction Cost: $3.8M FACT | Boulder County |
| CO 90 Bedrock/Dolores River Bridge Replacement | CDOT | Archived Project | Cost: $3.8M FACT | Montrose County |
| Idaho Springs Clear Creek Greenway Path | CDOT | No status printed | Cost: $3.8M FACT | CDOT’s page names no county. |
| US 24 Passing Lanes West of Peyton | CDOT | Archived Project | Cost: $3.8M FACT | El Paso County |
| US 34 Bridge Replacement over Colorado River | CDOT | Archived Project | Cost: $3.8M FACT | Grand County |
| US 36 Bridge Replacement East of Last Chance | CDOT | Archived Project | Cost: $3.8M FACT | Washington County |
| US 385 Realignment and New Structure South of Bristol | CDOT | Active Construction | Cost: $3.775M FACT | Prowers County |
| Replace Domestic and Hot Water Heating Systems YSC, CALM, NMF, NMV and NPV | Department of Human Services | Appropriated this year | $3,756,573 FACT | SITE NOT ESTABLISHED The item names only internal Human Services abbreviations (NCD, DYS, CALM, YSC, NMF, NMV, NPV). We have not established which facilities these are, and will not pin them to a plausible one. |
| Leetsdale Resurfacing | Mississippi Avenue to Colorado Boulevard | CDOT | No status printed | Cost: $3.72M FACT | CDOT’s page names no county. |
| CO 35 Resurfacing & Bridge Maintenance | CDOT | Active Construction | Construction Cost: $3.7M FACT | Denver County |
| CO 86 & County Road 13 - Elizabeth Intersection | CDOT | Archived Project | Cost: $3.7M FACT | CDOT’s page names no county. |
| US 160 Wolf Creek Fiber Optic Installation | CDOT | No status printed | Cost: $3.7M FACT | Mineral County |
| US 6 & 20 Road Intersection Improvements | CDOT | Archived Project | Cost: $3.7M FACT | Mesa County |
| US 6 Paving Merino to Atwood | CDOT | Archived Project | Cost: $3.7M FACT | Logan County |
| CU Boulder Economics Building renovation | IHE | Requested, not recommended | $3,605,767 FACT | University of Colorado Boulder Boulder County |
| CO 112 Resurfacing from US 285 to CO 17 | CDOT | Archived Project | Cost: $3.6M FACT | Alamosa, Rio Grande and Saguache counties |
| CO 115 Penrose Concrete Preventive Maintenance | CDOT | Active Construction | Construction Cost: $3.6M FACT | Fremont County |
| CO 119 & Sugarloaf Road Retaining Wall Replacement | CDOT | Archived Project | Cost: $3.6M FACT | Boulder County |
| US 550 Intersection Improvements at 17th, 22nd & 32nd Streets in Durango | CDOT | No status printed | Cost: $3.6M FACT | CDOT’s page names no county. |
| US 6 Castle Creek Bridge Replacement in Eagle | CDOT | Archived Project | Cost: $3.6M FACT | Eagle County |
| CO 17 Culvert Replacement & Repairs | CDOT | No status printed | Construction Cost: $3.543M FACT | Archuleta and Conejos counties |
| C-470 Noise Wall and Trail Improvements | CDOT | Archived Project | Cost: $3.5M FACT | CDOT’s page names no county. |
| CO 12 Safety Improvements in Weston | CDOT | Active Construction | Construction Cost: $3.5M FACT | Las Animas County |
| CO 52 Resurfacing North of Fort Morgan | CDOT | Active Construction | Construction Cost: $3.5M FACT | Morgan County |
| CO 95/Sheridan Boulevard Resurfacing: 25th to 52nd Avenues | CDOT | Archived Project | Cost: $3.5M FACT | Denver and Jefferson counties |
| Colfax Avenue Resurfacing | CDOT | Archived Project | Cost: $3.5M FACT | CDOT’s page names no county. |
| I-25 Cable Rail Safety Improvements | CDOT | Archived Project | Construction Cost: $3.5M FACT | Pueblo County |
| I-70 No Name Tunnel Lighting Replacement | CDOT | No status printed | Cost: $3.5M FACT | CDOT’s page names no county. |
| I-70 Vail Pass Eastbound Resurfacing | CDOT | Past Construction | Construction Cost: $3.5M FACT | Summit County |
| Southeastern Colorado Striping | CDOT | Active Construction | Construction Cost: $3.5M FACT | El Paso, Huerfano, Las Animas, Park, Pueblo, Summit and Teller counties |
| US 285 Wildlife Underpass in Nathrop | CDOT | No status printed | Cost: $3.5M FACT | Chaffee County |
| US 36 Resurfacing West of Last Chance | CDOT | Archived Project | Cost: $3.5M FACT | Washington County |
| US 40 Resurfacing from Genesee to County Road 93 | CDOT | Archived Project | Cost: $3.5M FACT | Jefferson County |
| CMU Allied Health relocation | IHE | Requested, not recommended | $3,453,428 FACT | Colorado Mesa University Mesa County |
| I-70 Geological Hogback Trail Rehabilitation | CDOT | Active Construction | Construction Cost: $3.43M FACT | Jefferson County |
| I-70 Exit 49 Grand Mesa Ramp Improvement | CDOT | No status printed | Cost: $3.4M FACT | CDOT’s page names no county. |
| US 550 Coal Bank Pass Wall Replacement | CDOT | No status printed | Construction Cost: $3.4M FACT | San Juan County |
| C-470 & Bowles Avenue Interchange Improvements | CDOT | Active Construction | Construction Cost: $3.3M FACT | Jefferson County |
| CO 145 Widening West of Society Turn | CDOT | Active Construction | Construction Cost: $3.3M FACT | San Miguel County |
| CO 9 (Summit Boulevard) Resurfacing in Frisco from I-70 to Main Street | CDOT | Archived Project | Cost: $3.3M FACT | CDOT’s page names no county. |
| I-25 Ramp Signal Installation Across Colorado Springs | CDOT | No status printed | Cost: $3.3M FACT | CDOT’s page names no county. |
| I-70 Salt Wash Bridges Scour, Mesa County | CDOT | Active Construction | Cost: $3.3M FACT | CDOT’s page names no county. |
| I-70 Straight Creek Culvert Repair | CDOT | Active Construction | Construction Cost: $3.3M FACT | Summit County |
| I-70 Truck Parking Expansion Near Glenwood Springs | CDOT | No status printed | Cost: $3.3M FACT | CDOT’s page names no county. |
| Mesa County Chip Seal | CDOT | No status printed | Cost: $3.3M FACT | CDOT’s page names no county. |
| Colorado Boulevard Resurfacing | CDOT | Archived Project | Construction Cost: $3.269M FACT | Adams and Denver counties |
| I-76 Bridge Repairs East of Roggen & East of Wiggins | CDOT | Active Construction | Construction Cost: $3.26M FACT | Morgan and Weld counties |
| CO 10 Crooked Arroyo Bridge Replacement in Otero County | CDOT | Archived Project | Cost: $3.23M FACT | Otero County |
| Belleview Overlay from University to I-25 | CDOT | Archived Project | Cost: $3.2M FACT | CDOT’s page names no county. |
| CO 13 Chip Seal North of Craig | CDOT | Archived Project | Construction Cost: $3.2M FACT | Moffat County |
| CO 52 Prospect Valley Resurfacing & Culvert Improvements | CDOT | Archived Project | Cost: $3.2M FACT | CDOT’s page names no county. |
| I-225 Ramp Safety Improvements | CDOT | No status printed | Cost: $3.2M FACT | CDOT’s page names no county. |
| I-70 Silver Plume Sound Wall Replacement | CDOT | No status printed | Cost: $3.2M FACT | CDOT’s page names no county. |
| Regionwide Paving in Southeastern Colorado | CDOT | No status printed | Cost: $3.2M FACT | CDOT’s page names no county. |
| US 285 Resurfacing Monte Vista to Saguache | CDOT | Active Construction | Cost: $3.2M FACT | CDOT’s page names no county. |
| US 85 Resurfacing from I-25 to Florida Avenue | CDOT | No status printed | Construction Cost: $3.2M FACT | Denver County |
| I-70 & Ward Road Improvements | CDOT | No status printed | Cost: $3.17M FACT | CDOT’s page names no county. |
| Modernize Restrooms, State Office Building | Department of Personnel | Appropriated this year | $3,145,604 FACT | State Office Building Denver County |
| Replace Access Control, Security Systems, Campuswide | Auraria Higher Education Center | Appropriated this year | $3,110,590 FACT | Auraria Higher Education Center Denver County |
| Clear Creek Scour Mitigation on I-70 | CDOT | Archived Project | Cost: $3.1M FACT | Clear Creek and Jefferson counties |
| CO 52 & Weld County Road 37 Intersection Improvements | CDOT | Archived Project | Cost: $3.1M FACT | Weld County |
| Douglas County Bridge Repair & Mitigation on CO 67, CO 83 & CO 86 | CDOT | Archived Project | Cost: $3.1M FACT | CDOT’s page names no county. |
| Metro Denver Area Traffic Signal and ADA Curb Ramp Upgrades | CDOT | No status printed | Cost: $3.1M FACT | CDOT’s page names no county. |
| Northeastern Colorado Pavement Marking & Rumble Strips | CDOT | Active Construction | Construction Cost: $3.1M FACT | Boulder, Cheyenne, Larimer, Morgan, Washington, Weld and Yuma counties |
| US 6 Resurfacing Mack to Fruita | CDOT | Archived Project | Cost: $3.1M FACT | Mesa County |
| General Population ADA Improvements, Fremont Correctional Facility | Department of Corrections | Appropriated this year | $3,077,054 FACT | Fremont Correctional Facility Fremont County |
| Replace C Basin Sanitary Sewer Outfall | Colorado State University | Appropriated this year | $3,028,814 FACT | Colorado State University Larimer County |
| Occupational Hazard Mitigation, R1 North | University of Colorado - Anschutz | Appropriated this year | $3,020,870 FACT | CU Anschutz Medical Campus Adams County |
| CO 330 Resurfacing to Collbran | CDOT | Archived Project | Cost: $3M FACT | Mesa County |
| CO 95/Sheridan Boulevard Resurfacing: 52nd to 58th Avenues | CDOT | Archived Project | Cost: $3M FACT | Denver County |
| Controlled Maintenance Emergency Account | Department of Personnel | Appropriated this year | $3,000,000 FACT | NO SINGLE SITE The Controlled Maintenance Emergency Account is drawn on wherever an emergency happens. It has no site until it is spent. |
| East Central Colorado ADA Curb Ramps | CDOT | Archived Project | Cost: $3M FACT | CDOT’s page names no county. |
| I-70 Eisenhower-Johnson Memorial Tunnels Barrier, Handrail & Walkway Replacement | CDOT | No status printed | Cost: $3M FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Material Flows | CDOT | Active Construction | Cost: $3M FACT | CDOT’s page names no county. |
| I-70 Hanging Lake Tunnel Electronic and Lane-Usage Sign Replacement | CDOT | No status printed | Cost: $3M FACT | CDOT’s page names no county. |
| I-70 Wildlife Fence in Eagle County | CDOT | Active Construction | Cost: $3M FACT | CDOT’s page names no county. |
| South Federal Blvd. Safety Improvements | CDOT | No status printed | Cost: $3M FACT | CDOT’s page names no county. |
| T-Rex Narrows Bridge Preventative Maintenance | CDOT | No status printed | Cost: $3M FACT | CDOT’s page names no county. |
| US 34 from I-25 to Greeley Intelligent Transportation System installation | CDOT | Archived Project | Cost: $3M FACT | Larimer and Weld counties |
| US 36 Rumble Strip Construction from Boulder to Estes Park | CDOT | Archived Project | Cost: $3M FACT | Boulder and Larimer counties |
| US 6 Clear Creek Canyon Rockfall Mitigation | CDOT | Archived Project | Cost: $3M FACT | CDOT’s page names no county. |
| US 6 North Avenue Traffic Signal Replacement | CDOT | Archived Project | Construction Cost: $3M FACT | Mesa County |
| US 6 Resurfacing in Mesa County | CDOT | Active Construction | Construction Cost: $3M FACT | Mesa County |
| US 85 from Denver to Greeley Intelligent Transportation System Installation | CDOT | No status printed | Cost: $3M FACT | CDOT’s page names no county. |
| Fire Alarm System Replacement, Various Buildings | University of Colorado - Anschutz | Appropriated this year | $2,997,553 FACT | CU Anschutz Medical Campus Adams County |
| CO 83 (Parker Road) Sidewalk East Side | CDOT | No status printed | Construction Cost: $2.948M FACT | Douglas County |
| CO 66 & Weld County Road 21 Intersection Improvements | CDOT | Archived Project | Construction Cost: $2.94M FACT | Weld County |
| CO 133 Chip Seal in Pitkin & Gunnison Counties | CDOT | No status printed | Construction Cost: $2.9M FACT | Gunnison and Pitkin counties |
| CO 14 Chip Seal Treatment | CDOT | Archived Project | Cost: $2.9M FACT | CDOT’s page names no county. |
| CO 52 Widening & ADA Ramp Construction at CR 13 | CDOT | Archived Project | Cost: $2.9M FACT | CDOT’s page names no county. |
| CO 74 Resurfacing from I-70 to County Road 65 | CDOT | Archived Project | Cost: $2.9M FACT | Jefferson County |
| CO 74 Rockfall Mitigation | CDOT | Archived Project | Cost: $2.9M FACT | CDOT’s page names no county. |
| Denver Metro Area Traffic Signal Improvements | CDOT | Archived Project | Cost: $2.9M FACT | CDOT’s page names no county. |
| Retaining Wall Improvements in Jefferson County | CDOT | No status printed | Construction Cost: $2.9M FACT | Jefferson County |
| Southeastern Colorado Pavement Marking | CDOT | Active Construction | Cost: $2.9M FACT | CDOT’s page names no county. |
| US 40 & CO 394 Bridge Repairs in Craig & Hayden | CDOT | Archived Project | Cost: $2.9M FACT | Moffat and Routt counties |
| US 40/Colfax Avenue Resurfacing Between I-70 and Kipling Street | CDOT | Archived Project | Cost: $2.9M FACT | Jefferson County |
| US 50 Delta Intersection Improvements | CDOT | No status printed | Cost: $2.9M FACT | CDOT’s page names no county. |
| US 50/CO 115 Roundabout in Penrose | CDOT | No status printed | Construction Cost: $2.9M FACT | Fremont County |
| US 6 Culvert Improvements in Garfield County | CDOT | Archived Project | Construction Cost: $2.9M FACT | Garfield County |
| US 85 (Santa Fe Drive) Widening from Hampden Avenue to Lipan Street | CDOT | No status printed | Cost: $2.9M FACT | CDOT’s page names no county. |
| Federal Boulevard Median Improvements | CDOT | No status printed | Construction Cost: $2.895M FACT | Adams County |
| Berthoud Pass Wall Repair | CDOT | Archived Project | Cost: $2.8M FACT | CDOT’s page names no county. |
| CO 133 McClure Pass Rockfall | CDOT | Archived Project | Cost: $2.8M FACT | CDOT’s page names no county. |
| CO 133 Paonia Landslide Repair | CDOT | Archived Project | Cost: $2.8M FACT | CDOT’s page names no county. |
| CO 69 Bridge Replacement Near Gardner | CDOT | Archived Project | Cost: $2.8M FACT | CDOT’s page names no county. |
| CO 92 and CO 133 Chip Seal | CDOT | Archived Project | Cost: $2.8M FACT | Delta, Gunnison and Montrose counties |
| CO 96 and CO 71 Intersection Culvert Replacement in Ordway | CDOT | Active Construction | Construction Cost: $2.8M FACT | Bent, Crowley, Kiowa, Otero and Pueblo counties |
| I-225 Bridge Rehabilitation at 6th & 2nd Avenues | CDOT | No status printed | Construction Cost: $2.8M FACT | Arapahoe County |
| Signal Improvements in Florence and Pueblo | CDOT | No status printed | Cost: $2.8M FACT | Fremont, Otero and Pueblo counties |
| US 285 Bridge Improvements in Conejos County | CDOT | Active Construction | Construction Cost: $2.8M FACT | Conejos County |
| US 50 & CO 71 Intersection Improvements | CDOT | Archived Project | Cost: $2.8M FACT | Otero County |
| US 550 Coal Bank Pass | CDOT | No status printed | Cost: $2.8M FACT | La Plata and San Juan counties |
| US 85 Resurfacing from Platteville to Fort Lupton | CDOT | No status printed | Cost: $2.8M FACT | CDOT’s page names no county. |
| I-70 Cable Rail & Guardrail Installation | CDOT | No status printed | Cost: $2.75M FACT | CDOT’s page names no county. |
| I-70 Eisenhower-Johnson Memorial Tunnels Resurfacing | CDOT | No status printed | Construction Cost: $2.75M FACT | Clear Creek and Summit counties |
| Metro Denver Bridge Deck Safety | CDOT | No status printed | Cost: $2.746M FACT | Adams and Arapahoe counties |
| Northeastern Colorado Bridge Rehabilitation in Boulder County | CDOT | Active Construction | Cost: $2.72M FACT | CDOT’s page names no county. |
| CO 21 & US 24 Signal Improvment Project in El Paso County | CDOT | Archived Project | Cost: $2.7M FACT | CDOT’s page names no county. |
| CO 231 Bridge Repair | CDOT | Archived Project | Cost: $2.7M FACT | Pueblo County |
| CO 79 Resurfacing & Irrigation Pipe Replacement | CDOT | Archived Project | Cost: $2.7M FACT | Weld County |
| I-70 Bridge Repair Near De Beque | CDOT | No status printed | Cost: $2.7M FACT | CDOT’s page names no county. |
| CO 96 Traffic Signal & Drainage Improvements in Pueblo | CDOT | Archived Project | Cost: $2.642M FACT | Pueblo County |
| I-25 and CO 115 Ramp Resurfacing | CDOT | No status printed | Cost: $2.63M FACT | CDOT’s page names no county. |
| CO 133 Resurfacing in Delta and Gunnison Counties | CDOT | Archived Project | Cost: $2.6M FACT | CDOT’s page names no county. |
| CO 46 Resurfacing in Gilpin & Jefferson Counties | CDOT | Active Construction | Construction Cost: $2.6M FACT | Gilpin and Jefferson counties |
| I-25 & I-70/I-76 Interchange Bridge Repairs | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| I-25 and 58th Avenue Barrier Work | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| I-70 Eagle County Bridge Repair | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| I-70 Wildlife Fence in Eagle County | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| Pikes Peak Area Traffic Signal Enhancement | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| Southwestern Colorado Bridge Maintenance | CDOT | No status printed | Cost: $2.6M FACT | Archuleta County |
| US 160 & CO 145 Improvements in Cortez & Mancos | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| US 24 ITS Fiber Optic Installation | CDOT | Archived Project | Cost: $2.6M FACT | El Paso County |
| US 285 South Fork of South Platte Bridge Replacement | CDOT | No status printed | Cost: $2.6M FACT | CDOT’s page names no county. |
| US 85 & Carson Boulevard Intersection Improvements | CDOT | No status printed | Construction Cost: $2.6M FACT | El Paso County |
| Fire Alarm Device Replacement, CMHHIP | Department of Human Services | Appropriated this year | $2,584,179 FACT | Colorado Mental Health Hospital, Pueblo Pueblo County |
| I-25 Wrong Way Preventive Signage Updates | CDOT | No status printed | Cost: $2.57M FACT | El Paso, Huerfano, Las Animas and Pueblo counties |
| Records Utilization Upgrade | Department of Public Safety | Appropriated this year | $2,564,100 FACT | An IT project. The act names no place. |
| CO 133 Resurfacing from McClure Pass to Redstone | CDOT | Archived Project | Cost: $2.5M FACT | CDOT’s page names no county. |
| CO 82/CO 133 Signal Replacement | CDOT | Archived Project | Cost: $2.5M FACT | CDOT’s page names no county. |
| I-70 Bridge from Stanley Road to Fall River Road in Clear Creek County | CDOT | No status printed | Cost: $2.5M FACT | CDOT’s page names no county. |
| I-70 Over Garrison Street | CDOT | No status printed | Cost: $2.5M FACT | CDOT’s page names no county. |
| Santa Fe to Eastbound C-470 Flyover Bridge Repairs | CDOT | Archived Project | Construction Cost: $2.5M FACT | Douglas County |
| Statewide Weigh-In-Motion Scales Replacement | CDOT | Active Construction | Construction Cost: $2.5M FACT | El Paso, Elbert, Gilpin, Las Animas, Mesa, Morgan, Prowers and Weld counties |
| US 40 & I-70 Intersection Improvements in Aurora | CDOT | Archived Project | Cost: $2.5M FACT | Adams County |
| Building Envelope Leak Repair, Green Center | Colorado School of Mines | Appropriated this year | $2,494,236 FACT | Colorado School of Mines Jefferson County |
| Southern Colorado Pavement Marking | CDOT | No status printed | Construction Cost: $2.49M FACT | El Paso, Huerfano and Pueblo counties |
| US 6 Lake Creek Bridge | CDOT | Archived Project | Cost: $2.48M FACT | Eagle County |
| CO 2/CO 88/US 285 Denver Metro ADA Ramps | CDOT | Archived Project | Construction Cost: $2.47M FACT | CDOT’s page names no county. |
| I-25 & US 287 Bridge Maintenance Project | CDOT | No status printed | Cost: $2.4M FACT | CDOT’s page names no county. |
| I-25 at Monument Creek Branch Flood Repairs | CDOT | No status printed | Cost: $2.4M FACT | CDOT’s page names no county. |
| I-70 and Kipling North Phase Interchange Improvements | CDOT | No status printed | Cost: $2.4M FACT | CDOT’s page names no county. |
| Metro Denver Critical Culvert Rehabilitation | CDOT | No status printed | Construction Cost: $2.4M FACT | Clear Creek, Gilpin and Jefferson counties |
| US 24 East at Rainbow Falls Bridge | CDOT | Archived Project | Cost: $2.4M FACT | El Paso County |
| US 24 Fiber-Optic Installation for Transporation Management | CDOT | Archived Project | Cost: $2.4M FACT | El Paso County |
| US 285 Surface Treatment in Antonito | CDOT | No status printed | Cost: $2.4M FACT | CDOT’s page names no county. |
| US 40 Elk Springs Resurfacing | CDOT | Archived Project | Cost: $2.4M FACT | Moffat County |
| US 40 Over Shelton Ditch Bridge Replacement | CDOT | Active Construction | Construction Cost: $2.4M FACT | Routt County |
| Replace HVAC Systems, NCD, DYS, and CALM | Department of Human Services | Appropriated this year | $2,391,947 FACT | SITE NOT ESTABLISHED The item names only internal Human Services abbreviations (NCD, DYS, CALM, YSC, NMF, NMV, NPV). We have not established which facilities these are, and will not pin them to a plausible one. |
| US 36 Curb Ramp Replacements | CDOT | Active Construction | Construction Cost: $2.39M FACT | Boulder County |
| I-76 Diamond Grind Project in Morgan & Weld Counties | CDOT | No status printed | Cost: $2.359M FACT | CDOT’s page names no county. |
| Living Unit Shower Improvements, Fremont Correctional Facility | Department of Corrections | Appropriated this year | $2,343,652 FACT | Fremont Correctional Facility Fremont County |
| I-25 Exit 14 Trinidad Ramp Improvements | CDOT | Archived Project | Construction Cost: $2.34M FACT | Las Animas County |
| South Douglas Creek Flood Repairs Under I-25 | CDOT | No status printed | Cost: $2.34M FACT | CDOT’s page names no county. |
| Critical Classroom and Office Life/Safety Security Upgrade, Multiple Buildings | University of Colorado - Colorado Springs | Appropriated this year | $2,334,609 FACT | UC Colorado Springs El Paso County |
| Fire Sprinkler Installation, Code Upgrades, 4-H Complex | Department of Agriculture | Appropriated this year | $2,328,045 FACT | SITE NOT ESTABLISHED The 4-H Complex is not identified further in the act. The Department of Agriculture runs facilities in more than one county and we have not established which this is. |
| CO 138 Bridge Replacement, Paving & ADA Upgrades | CDOT | Archived Project | Cost: $2.3M FACT | Sedgwick County |
| CO 145 Ophir Wall Replacement | CDOT | No status printed | Construction Cost: $2.3M FACT | San Miguel County |
| CO 318 Browns Park Culvert Replacement | CDOT | Active Construction | Construction Cost: $2.3M FACT | Moffat County |
| CO 55 River Bank Repairs Over the South Platte River | CDOT | Archived Project | Cost: $2.3M FACT | Logan County |
| CO 66 Intersection Improvements in Northeastern Colorado | CDOT | Archived Project | Construction Cost: $2.3M FACT | Weld County |
| CO 71 Widening between Rocky Ford & Ordway | CDOT | No status printed | Construction Cost: $2.3M FACT | Crowley and Otero counties |
| Colorado Highways 74, 79, 103 & 105 Maintenance | CDOT | Archived Project | Cost: $2.3M FACT | CDOT’s page names no county. |
| Denver Metro Guardrail Project | CDOT | Archived Project | Construction Cost: $2.3M FACT | CDOT’s page names no county. |
| I-70 VSL and CO 74 & US 285 ITS Upgrades | CDOT | No status printed | Cost: $2.3M FACT | Clear Creek, Jefferson and Summit counties |
| Regionwide Striping in Southwest Colorado | CDOT | No status printed | Cost: $2.3M FACT | CDOT’s page names no county. |
| US 287 Preventative Bridge Maintenance | CDOT | No status printed | Cost: $2.3M FACT | CDOT’s page names no county. |
| Statewide Procurement System | Department of Personnel | Appropriated this year | $2,299,500 FACT | An IT project. The act names no place. |
| Roof Replacement, Legislative Services Building | Department of Personnel | Appropriated this year | $2,280,260 FACT | Legislative Services Building Denver County |
| US 160 Bridge Maintenance in Montezuma County | CDOT | Active Construction | Construction Cost: $2.28M FACT | CDOT’s page names no county. |
| US 24 Wildlife Fencing Johnson Village East | CDOT | Archived Project | Cost: $2.26M FACT | Chaffee County |
| Infrastructure and ADA/Parking Improvements, Camp George West | Department of Personnel | Appropriated this year | $2,257,507 FACT | Camp George West Jefferson County |
| El Paso County American with Disabilities Act Ramp Work | CDOT | No status printed | Construction Cost: $2.24M FACT | El Paso County |
| Veterans Memorial Cemetery improvements ph 1/2 | DMVA | Requested, not recommended | $2,211,493 FACT | SITE NOT ESTABLISHED Colorado has more than one veterans cemetery and the request names neither. We have not established which. |
| CO 2 Curb Ramp Improvements | CDOT | Archived Project | Cost: $2.2M FACT | CDOT’s page names no county. |
| Denver Metro Area Wrong-Way Signage Improvements | CDOT | Archived Project | Cost: $2.2M FACT | CDOT’s page names no county. |
| I-25 Cable Barrier Phase IV | CDOT | No status printed | Cost: $2.2M FACT | CDOT’s page names no county. |
| I-25 Median Barrier Installation Between Pueblo & Colorado Springs | CDOT | No status printed | Cost: $2.2M FACT | CDOT’s page names no county. |
| I-70 - Northwestern Colorado Wrong Way Detection | CDOT | No status printed | Cost: $2.2M FACT | CDOT’s page names no county. |
| Region 5 Chain Station Upgrades | CDOT | No status printed | Cost: $2.2M FACT | CDOT’s page names no county. |
| US 24 Rockfall Mitigation from Cascade to Manitou Springs | CDOT | Archived Project | Cost: $2.2M FACT | El Paso County |
| US 40 Steamboat Main Street Rehabilitation Project | CDOT | Archived Project | Construction Cost: $2.2M FACT | Routt County |
| Replace/Upgrade Building Automation System Controls, Campuswide | Otero Junior College | Appropriated this year | $2,192,580 FACT | Otero College Otero County |
| Replace and Upgrade Building Automation System, Rampart Campus | Pikes Peak State College | Appropriated this year | $2,163,700 FACT | Pikes Peak State College El Paso County |
| South Central Colorado Bridge Preventative Maintenance | CDOT | Active Construction | Construction Cost: $2.16M FACT | Alamosa and Chaffee counties |
| Striping in Southwestern Colorado | CDOT | No status printed | Cost: $2.11M FACT | CDOT’s page names no county. |
| CO 41 Surface Treatment: US 160 to Utah | CDOT | Archived Project | Cost: $2.1M FACT | CDOT’s page names no county. |
| CO 83 Concrete Panel Replacement E-470 to Arapahoe Road | CDOT | Archived Project | Cost: $2.1M FACT | Arapahoe and Douglas counties |
| Health Facilities and EMS Modernization | Department of Public Health | Appropriated this year | $2,100,000 FACT | An IT project. The act names no place. |
| I-70 Eastbound Auxiliary Lane Addition Between Ward Road & Kipling Street | CDOT | No status printed | Cost: $2.1M FACT | CDOT’s page names no county. |
| I-70 Hanging Lake Tunnel Vertical Door Replacement | CDOT | No status printed | Cost: $2.1M FACT | CDOT’s page names no county. |
| I-70 Vail Pass Wall Repairs | CDOT | No status printed | Cost: $2.1M FACT | CDOT’s page names no county. |
| Statewide Fiber Backbone Connection to State Buildings | CDOT | No status printed | Cost: $2.1M FACT | CDOT’s page names no county. |
| US 24 Curve Correction in Teller County | CDOT | Archived Project | Cost: $2.1M FACT | Teller County |
| US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray | CDOT | Archived Project | Construction Cost: $2.1M FACT | Morgan, Washington and Yuma counties |
| US 385 Cheyenne Wells | CDOT | No status printed | Cost: $2.1M FACT | CDOT’s page names no county. |
| US 40 Chip Seal in Steamboat Springs 2021 | CDOT | Archived Project | Cost: $2.1M FACT | Routt County |
| US 160 Priority Culverts in Southwestern Colorado | CDOT | Active Construction | Cost: $2.096M FACT | CDOT’s page names no county. |
| I-76 Bridge Rehabilitation Over Clear Creek | CDOT | No status printed | Cost: $2.02M FACT | CDOT’s page names no county. |
| US 50 La Junta Microsurfacing | CDOT | Active Construction | Cost: $2.019M FACT | CDOT’s page names no county. |
| CO 119 Sign Replacement | CDOT | Archived Project | Cost: $2M FACT | Boulder County |
| CO 133 Rockfall Mitigation in Gunnison County | CDOT | No status printed | Construction Cost: $2M FACT | Gunnison County |
| CO 14 Shoulder Widening in the Poudre Canyon | CDOT | Archived Project | Cost: $2M FACT | CDOT’s page names no county. |
| CO 67 Safety Improvements in Douglas & Teller Counties | CDOT | Archived Project | Construction Cost: $2M FACT | Douglas County |
| CO 96 Bridge Replacement Over Rush Creek | CDOT | Archived Project | Cost: $2M FACT | El Paso County |
| Colorado Springs Capital Signal Replacement | CDOT | Archived Project | Cost: $2M FACT | El Paso and Teller counties |
| I-25 Bridge Replacement at MP 112 in Pinon | CDOT | No status printed | Cost: $2M FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Rockfall Mitigation Emergency Project | CDOT | No status printed | Cost: $2M FACT | CDOT’s page names no county. |
| Signal Pole Replacement in Fort Collins and Boulder | CDOT | No status printed | Cost: $2M FACT | CDOT’s page names no county. |
| South Central Colorado Culvert Repairs | CDOT | No status printed | Construction Cost: $2M FACT | Chaffee and Costilla counties |
| Southwest Colorado Pavement Marking | CDOT | Active Construction | Construction Cost: $2M FACT | Alamosa, Archuleta, La Plata, Mineral, Montezuma and Rio Grande counties |
| Traffic Signal Upgrades in Northwestern Colorado | CDOT | Active Construction | Construction Cost: $2M FACT | Delta, Eagle, Garfield, Grand, Gunnison, Lake, Mesa, Montrose, Pitkin, Routt and Summit counties |
| US 160 Sidewalk Improvements in Mancos | CDOT | No status printed | Construction Cost: $2M FACT | Montezuma County |
| US 24 Intersection Improvements at Baylor & DePaul | CDOT | Archived Project | Construction Cost: $2M FACT | Chaffee County |
| US 285 Bailey Safety Improvements (Crow Hill) | CDOT | No status printed | Construction Costs: $2M FACT | Park County |
| US 34 and CO 257 Signalization | CDOT | Archived Project | Cost: $2M FACT | Weld County |
| US 34 Fort Morgan Repaving and Signal Upgrade | CDOT | Archived Project | Cost: $2M FACT | Morgan County |
| US 40 Floyd Hill Mill and Fill | CDOT | Archived Project | Cost: $2M FACT | CDOT’s page names no county. |
| US 50 Cañon City Road Maintenance | CDOT | Archived Project | Construction Cost: $2M FACT | Fremont County |
| US 50 Surface Treatment, Otero and Bent Counties | CDOT | Past Construction | Cost: $2M FACT | Otero County |
| Replace Roof, Main Building, Westminster Campus | Front Range Community College | Appropriated this year | $1,999,000 FACT | Front Range CC — Westminster Adams County |
| Replace HVAC Units, Upgrade Lighting Systems, CBI Grand Junction Facility | Department of Public Safety | Appropriated this year | $1,990,834 FACT | CBI Grand Junction Facility Mesa County |
| Life Safety Technology Modernization | University of Northern Colorado | Appropriated this year | $1,982,160 FACT | An IT project. The act names no place. |
| US 287 Intersection Improvements in Broomfield County | CDOT | Active Construction | Construction Cost: $1.95M FACT | Broomfield County |
| US 50 Dozier Intersection Improvements | CDOT | No status printed | Cost: $1.94M FACT | Fremont County |
| Bridge Preventative Maintenance in Mineral County | CDOT | Archived Project | Cost: $1.9M FACT | Mineral County |
| CO 133 Culvert Repair in Bowie, CO | CDOT | No status printed | Construction Cost: $1.9M FACT | Gunnison County |
| CO 145 Chip Seal West Fork North, South of Rico | CDOT | Archived Project | Cost: $1.9M FACT | Dolores County |
| CO 83 Lighted Median Addition from E. Mississippi to E. Harvard Avenues | CDOT | Archived Project | Cost: $1.9M FACT | CDOT’s page names no county. |
| Denver Metro Bridge Rehabilitation and Fiber Wrap | CDOT | Archived Project | Cost: $1.9M FACT | CDOT’s page names no county. |
| I-225 Bottleneck Mitigation | CDOT | Active Construction | Construction Cost: $1.9M FACT | Arapahoe and Denver counties |
| I-25/I-270 Bridge Preventative Maintenance | CDOT | No status printed | Cost: $1.9M FACT | CDOT’s page names no county. |
| Security Upgrades, Campuswide | Front Range Community College | Appropriated this year | $1,900,000 FACT | SITE NOT ESTABLISHED Front Range Community College runs four campuses in three counties and the item says "Campuswide". A single pin would name one of them. |
| Southwestern Colorado Culvert Repairs | CDOT | No status printed | Construction Cost: $1.9M FACT | Archuleta, Chaffee, Conejos, La Plata and Montezuma counties |
| US 50B Drainage Improvements east of Swink | CDOT | Active Construction | Construction Cost: $1.9M FACT | Otero County |
| US 550 Retaining Wall & Tunnel Repairs | CDOT | Archived Project | Construction Cost: $1.9M FACT | Ouray and San Juan counties |
| US 85 and WCR 98 Intersection Improvements in Nunn, CO | CDOT | No status printed | Cost: $1.9M FACT | CDOT’s page names no county. |
| Testing lab relocation | CDLE | Requested, recommended | $1,899,341 FACT | SITE NOT ESTABLISHED The testing lab is named by function only, with no place, current or intended. |
| CO 88/Belleview Avenue Traffic Safety | CDOT | Archived Project | Construction Cost: $1.898M FACT | Arapahoe County |
| Generator and Controls Improvements, Delta Correctional Center | Department of Corrections | Appropriated this year | $1,891,154 FACT | Delta Correctional Center Delta County |
| US 160 Wolf Creek Tunnel Maintenance | CDOT | Active Construction | Construction Cost: $1.89M FACT | Mineral County |
| US 24 Traffic Signal Installations | CDOT | Active Construction | Construction Cost: $1.89M FACT | El Paso County |
| Replace Fire Alarm Equipment, Multiple Buildings | Fort Lewis College | Appropriated this year | $1,884,573 FACT | Fort Lewis College La Plata County |
| Denver Metro Essential Wall Repairs | CDOT | Active Construction | Construction Cost: $1.88M FACT | Arapahoe, Boulder and Denver counties |
| CO 47 Microsurfacing in Pueblo | CDOT | Archived Project | Construction Cost: $1.85M FACT | Pueblo County |
| Southeastern CO Centerline Rumble Strip Installation | CDOT | Active Construction | Cost: $1.847M FACT | CDOT’s page names no county. |
| US 160 Hawkins Signal & ADA Ramp Project | CDOT | No status printed | Cost: $1.83M FACT | CDOT’s page names no county. |
| C-470 Westbound Bridge Repairs over I-70 | CDOT | Archived Project | Construction Cost: $1.8M FACT | Jefferson County |
| CO 121/Wadsworth Signal Improvements in Jefferson County | CDOT | No status printed | Cost: $1.8M FACT | Jefferson County |
| Drainage Improvements to 21st Lane from Clearview Drive to Santa Fe Drive | CDOT | Archived Project | Cost: $1.8M FACT | CDOT’s page names no county. |
| I-25 and CO 12 Critical Culvert Repair | CDOT | No status printed | Construction Cost: $1.8M FACT | Pueblo County |
| I-70 Barrier & Median Improvements in Genesee, Morrison & Denver | CDOT | No status printed | Cost: $1.8M FACT | CDOT’s page names no county. |
| I-70 Bridge Over Washington Street | CDOT | Active Construction | Construction Cost: $1.8M FACT | CDOT’s page names no county. |
| Northeastern Colorado Culvert Repairs | CDOT | No status printed | Construction Cost: $1.8M FACT | Boulder, Elbert, Larimer, Logan, Morgan and Weld counties |
| Sign Improvements in El Paso & Teller Counties | CDOT | No status printed | Construction Cost: $1.8M FACT | El Paso and Teller counties |
| Timber Bridge Preservation in El Paso, Park & Teller Counties | CDOT | Active Construction | Construction Cost: $1.8M FACT | El Paso, Park and Teller counties |
| Traffic Signal Upgrades in Broomfield, Boulder & Jefferson Counties | CDOT | No status printed | Cost: $1.8M FACT | CDOT’s page names no county. |
| US 24 El Paso County Sign Replacement | CDOT | Archived Project | Cost: $1.8M FACT | El Paso County |
| US 40 Americans with Disabilities Act Ramp on Colfax | CDOT | Archived Project | Cost: $1.8M FACT | Jefferson County |
| US 50 Median Cable Rail near Penrose | CDOT | No status printed | Cost: $1.8M FACT | CDOT’s page names no county. |
| US 50 Westbound from Wills to RR bridge | CDOT | No status printed | Cost: $1.8M FACT | Pueblo County |
| US 85 and O Street Intersection Improvements | CDOT | No status printed | Cost: $1.8M FACT | CDOT’s page names no county. |
| US 85 Resurfacing at Weld County Road 18 | CDOT | No status printed | Cost: $1.8M FACT | CDOT’s page names no county. |
| Mast Arm Installation in Jefferson and Arapahoe Counties | CDOT | No status printed | Cost: $1.76M FACT | CDOT’s page names no county. |
| US 287 Resurfacing Northwest of Fort Collins | CDOT | No status printed | Construction Cost: $1.75M FACT | Larimer County |
| Stationary Sources Modernization | Department of Public Health | Appropriated this year | $1,748,863 FACT | An IT project. The act names no place. |
| Lamar Traffic Signal Replacement | CDOT | No status printed | Construction Cost: $1.74M FACT | Prowers County |
| Northeast Colorado Traffic Signal Upgrades | CDOT | No status printed | Cost: $1.74M FACT | CDOT’s page names no county. |
| Window Replacement, Engineering Center Office Tower | University of Colorado - Boulder | Appropriated this year | $1,716,326 FACT | University of Colorado Boulder Boulder County |
| CO 113 Structure Replacement in Peetz | CDOT | Archived Project | Cost: $1.7M FACT | Logan County |
| CO 71D Resurfacing South of Brush | CDOT | Archived Project | Cost: $1.7M FACT | CDOT’s page names no county. |
| CO 79 Kiowa to Bennett Trail Improvements | CDOT | No status printed | Construction Cost: $1.7M FACT | Adams County |
| I-76 Over Clear Creek Scour Mitigation | CDOT | Active Construction | Cost: $1.7M FACT | CDOT’s page names no county. |
| US 24 Lane, Signal & Ramp Work at 31st Street & Ridge Road | CDOT | Archived Project | Cost: $1.7M FACT | El Paso County |
| US 36 Guardrail Improvements | CDOT | Archived Project | Construction Cost: $1.7M FACT | Boulder and Larimer counties |
| US 40 & CO 121 Traffic Signal Upgrades in Denver & Golden | CDOT | Archived Project | Cost: $1.7M FACT | Jefferson County |
| US 40 Americans with Disabilities Act Ramp Upgrades, Grand County & Jackson County | CDOT | Archived Project | Cost: $1.7M FACT | Jackson County |
| US 50 & CO 231 Improvements | CDOT | Environmental, Archived Project | Construction Cost: $1.7M FACT | Pueblo County |
| Walsenburg Pedestrian/Bicycle Improvements | CDOT | Active Construction | Cost: $1.7M FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Wall Improvements | CDOT | No status printed | Cost: $1.66M FACT | CDOT’s page names no county. |
| Roof Replacement, Johnson Hall | Colorado State University | Appropriated this year | $1,645,987 FACT | Colorado State University Larimer County |
| Replace Ground Source Heat Pumps Compressor, State Capitol Building | Department of Personnel | Appropriated this year | $1,641,375 FACT | State Capitol Building Denver County |
| Building Stabilization, CMHHIP Buildings | Department of Human Services | Appropriated this year | $1,614,817 FACT | Colorado Mental Health Hospital, Pueblo Pueblo County |
| Security and Emergency Systems Upgrade, Campuswide | Colorado State University - Pueblo | Appropriated this year | $1,604,350 FACT | Colorado State University – Pueblo Pueblo County |
| 23rd Lane Storm Sewer (US 50C to Everett Road) | CDOT | Archived Project | Cost: $1.6M FACT | Pueblo County |
| CO 131 State Bridge | CDOT | Archived Project | Cost: $1.6M FACT | CDOT’s page names no county. |
| CO 65 & CO 330 Grand Junction Chip Seal | CDOT | Archived Project | Construction Cost: $1.6M FACT | Mesa County |
| CO 82 (Independence Pass) Chip Seal | CDOT | Archived Project | Construction Cost: $1.6M FACT | Pitkin County |
| CO 82 Red Hill Rockfall Mitigation | CDOT | Active Construction | Construction Cost: $1.6M FACT | Garfield County |
| CO 83 Americans with Disabilities Act Curb Ramp Upgrades | CDOT | Archived Project | Construction Cost: $1.6M FACT | Arapahoe and Denver counties |
| CO 92 Chip Seal Project in Montrose and Delta County | CDOT | Archived Project | Construction Cost: $1.6M FACT | Delta and Montrose counties |
| Fremont and El Paso County Guardrail Placement | CDOT | Past Construction | Cost: $1.6M FACT | El Paso and Fremont counties |
| I-25 Interchange Curb Ramps in Denver County | CDOT | No status printed | Cost: $1.6M FACT | CDOT’s page names no county. |
| I-70 Bridge Repairs Over Clear Creek & Soda Creek Road | CDOT | No status printed | Cost: $1.6M FACT | CDOT’s page names no county. |
| Southeast Colorado Guardrail Replacement | CDOT | No status printed | Cost: $1.6M FACT | CDOT’s page names no county. |
| Southwest Colorado Striping | CDOT | No status printed | Construction Cost: $1.6M FACT | Alamosa, Archuleta, Chaffee, Gunnison, La Plata, Mineral, Montezuma, Ouray, Rio Grande, Saguache, San Juan and San Miguel counties |
| Southwestern Colorado Highway Restriping | CDOT | No status printed | Cost: $1.6M FACT | CDOT’s page names no county. |
| US 160 Cortez Signal Improvements | CDOT | Active Construction | Construction Cost: $1.6M FACT | CDOT’s page names no county. |
| US 160 Harrison & Mildred Signals | CDOT | Archived Project | Construction Cost: $1.6M FACT | Montezuma County |
| US 24 Signal Replacement in Woodland Park | CDOT | Archived Project | Construction Cost: $1.6M FACT | Teller County |
| Denver Metro Bridge Safety Improvements | CDOT | Archived Project | Cost: $1.58M FACT | CDOT’s page names no county. |
| CO 172 & CR 318 Intersection Improvements South of Ignacio | CDOT | Archived Project | Cost: $1.568M FACT | La Plata County |
| CO 94 & Peyton Intersection Improvements | CDOT | Archived Project | Cost: $1.56M FACT | El Paso County |
| CO 142 Improvements from Romeo to San Luis | CDOT | Archived Project | Cost: $1.5M FACT | CDOT’s page names no county. |
| CO 145 / US 550 Deep Patch & Wall Repairs | CDOT | Archived Project | Cost: $1.5M FACT | CDOT’s page names no county. |
| CO 150 Chip Seal Treatment | CDOT | Archived Project | Cost: $1.5M FACT | Alamosa County |
| CO 60 & CR 40 Intersection Widening | CDOT | Archived Project | Cost: $1.5M FACT | Weld County |
| CO 92 Crawford Resurfacing | CDOT | Archived Project | Cost: $1.5M FACT | Delta and Montrose counties |
| Mesa County ADA Ramps Phase III | CDOT | No status printed | Cost: $1.5M FACT | CDOT’s page names no county. |
| Timber Bridge Maintenance | CDOT | No status printed | Construction Cost: $1.5M FACT | Baca, Bent, Las Animas and Prowers counties |
| US 160 Signal Improvements in Pagosa Springs | CDOT | No status printed | Cost: $1.5M FACT | CDOT’s page names no county. |
| US 24, CO 17 and US 160 Culvert Repair | CDOT | Archived Project | Cost: $1.5M FACT | Chaffee, Conejos and Montezuma counties |
| US 550 Cascade Curve Safety Improvements | CDOT | Active Construction | Construction Cost: $1.5M FACT | La Plata County |
| US 550 Skyrocket Creek Culvert Replacement | CDOT | No status printed | Cost: $1.5M FACT | Ouray County |
| VMS Sign Upgrades in Southwestern Colorado | CDOT | No status printed | Cost: $1.5M FACT | CDOT’s page names no county. |
| Conflict Warning Systems Installation in Denver Metro | CDOT | Archived Project | Construction Cost: $1.45M FACT | Douglas and Jefferson counties |
| US 50 Culverts Repairs in Cañon City | CDOT | No status printed | Construction Cost: $1.45M FACT | Fremont County |
| NESB Chilled Water Connection | Colorado State University | Appropriated this year | $1,445,479 FACT | Colorado State University Larimer County |
| I-70 Median Cable Rail in Eagle County | CDOT | Active Construction | Cost: $1.401M FACT | CDOT’s page names no county. |
| Beetle Kill Tree Removal in Routt, Jackson, Grand and Summit counties | CDOT | Archived Project | Cost: $1.4M FACT | Grand, Jackson, Routt and Summit counties |
| Bridge Repairs in Denver, Adams, Jefferson & Clear Creek Counties | CDOT | Archived Project | Cost: $1.4M FACT | Adams, Clear Creek, Denver and Jefferson counties |
| CO 145 Lizard Head Pass Avalanche Mitigation System | CDOT | Archived Project | Cost: $1.4M FACT | CDOT’s page names no county. |
| CO 21 & CO 16 Traffic Signal Replacement in El Paso County | CDOT | Archived Project | Cost: $1.4M FACT | El Paso County |
| CO 340 Redlands Resurfacing | CDOT | Archived Project | Cost: $1.4M FACT | CDOT’s page names no county. |
| CO 86 Resurfacing in Elizabeth | CDOT | Active Construction | Construction Cost: $1.4M FACT | Elbert County |
| I-70 Concrete Panel Replacement Project Arapahoe County | CDOT | No status printed | Construction Cost: $1.4M FACT | Arapahoe County |
| US 160 Walsenburg ADA Ramps | CDOT | No status printed | Cost: $1.4M FACT | CDOT’s page names no county. |
| US 285 Bridge Repairs in Jefferson County | CDOT | No status printed | Cost: $1.4M FACT | CDOT’s page names no county. |
| US 34 ADA Curb Ramp Improvements in Akron, Otis, Yuma and Wray | CDOT | Archived Project | Cost: $1.4M FACT | Washington and Yuma counties |
| US 550 & 14th Street Signal Replacement | CDOT | No status printed | Construction Cost: $1.4M FACT | La Plata County |
| US 550 Culvert Repairs North of Red Mountain Pass | CDOT | No status printed | Cost: $1.4M FACT | CDOT’s page names no county. |
| Renovate Variable Flow Chilled Water Systems, Michener and Candelaria | University of Northern Colorado | Appropriated this year | $1,388,928 FACT | University of Northern Colorado Weld County |
| I-25 Southbound Bottleneck Mitigation | CDOT | No status printed | Cost: $1.35M FACT | CDOT’s page names no county. |
| US 285 Safety Improvements | CDOT | No status printed | Cost: $1.35M FACT | CDOT’s page names no county. |
| Replacement/Upgrade Building Fire Alarm Equipment, Campus | Colorado State University - Pueblo | Appropriated this year | $1,341,571 FACT | Colorado State University – Pueblo Pueblo County |
| CO 12 & CO 194 Bridge Preventative Maintenance | CDOT | Archived Project | Cost: $1.34M FACT | Bent and Otero counties |
| CO 144 Bridge & Road Repairs from Log Lane Village to Weldona | CDOT | Archived Project | Construction Cost: $1.31M FACT | Morgan County |
| Capitol Grounds Renovation (CR) | DPA | Requested, not recommended | $1,300,115 FACT | State Capitol Building Denver County |
| CO 131 Oak Creek Resurfacing | CDOT | Archived Project | Cost: $1.3M FACT | Routt County |
| CO 133 McClure Pass Fault Repairs | CDOT | Archived Project | Cost: $1.3M FACT | CDOT’s page names no county. |
| CO 141 Signal Replacement in Clifton | CDOT | Archived Project | Cost: $1.3M FACT | Mesa County |
| CO 6 Resurfacing Near Fleming in Logan County | CDOT | Archived Project | Cost: $1.3M FACT | Logan County |
| CO 72 Chip Seal from James Creek to CO 7 | CDOT | Active Construction | Construction Cost: $1.3M FACT | Boulder County |
| Denver & Silver Plume Bridge Pad Repairs | CDOT | Archived Project | Cost: $1.3M FACT | CDOT’s page names no county. |
| Highway Crack Repairs in Adams, Arapahoe, Broomfield, Clear Creek, Denver & Jefferson Counties | CDOT | No status printed | Cost: $1.3M FACT | CDOT’s page names no county. |
| I-25 El Paso County Sign Replacement Project | CDOT | No status printed | Cost: $1.3M FACT | CDOT’s page names no county. |
| Metro Denver Crack Seal Project | CDOT | No status printed | Cost: $1.3M FACT | CDOT’s page names no county. |
| Temporary Barrier on I-270 | CDOT | No status printed | Construction Cost: $1.3M FACT | Adams County |
| Traffic Signal Face Replacements Across Northwest Colorado | CDOT | No status printed | Cost: $1.3M FACT | CDOT’s page names no county. |
| U.S. 160 Towaoc to Cortez Resurfacing Project | CDOT | No status printed | Cost: $1.3M FACT | CDOT’s page names no county. |
| US 24 Cross Creek Culvert | CDOT | Archived Project | Cost: $1.3M FACT | Eagle County |
| US 287 Longmont Intersection Improvements | CDOT | No status printed | Cost: $1.3M FACT | CDOT’s page names no county. |
| US 6 Highway Improvements in Palisade | CDOT | Archived Project | Cost: $1.3M FACT | Mesa County |
| Replace Microwave Communication Site Shelters, Statewide | Department of Public Safety | Appropriated this year | $1,261,293 FACT | NO SINGLE SITE The line item says "Statewide" in its own name. |
| Elevator Install ADA, Walker Hall | Northeastern Junior College | Appropriated this year | $1,251,250 FACT | Northeastern Junior College Logan County |
| CO 13 Roadway Reinforcement Between Rifle & Meeker | CDOT | Archived Project | Cost: $1.25M FACT | CDOT’s page names no county. |
| CO 83 & US 40 Intersection Improvements | CDOT | Archived Project | Cost: $1.25M FACT | CDOT’s page names no county. |
| I-76 & Dahlia Emergency Bridge Repair | CDOT | No status printed | Construction Cost: $1.25M FACT | Adams County |
| US 50 Monarch Pass Emergency Truck Ramp Repair | CDOT | Active Construction | Cost: $1.25M FACT | CDOT’s page names no county. |
| US 550/US 160 Durango & Alamosa Striping | CDOT | No status printed | Cost: $1.24M FACT | CDOT’s page names no county. |
| I-70 Sign Structure Replacement Project | CDOT | No status printed | Cost: $1.217M FACT | CDOT’s page names no county. |
| US 285 Englewood Traffic Signal Upgrades | CDOT | Active Construction | Construction Cost: $1.203M FACT | Arapahoe County |
| Broadway Signal Replacement | CDOT | Active Construction | Construction Cost: $1.2M FACT | Adams County |
| Broomfield County Traffic Signal Replacement | CDOT | Archived Project | Cost: $1.2M FACT | Broomfield County |
| CO 14 & US 40 Crack Sealing in Jackson & Grand Counties | CDOT | Archived Project | Construction Cost: $1.2M FACT | Grand and Jackson counties |
| CO 83/85/86 ADA Curb Ramps in Douglas County | CDOT | Archived Project | Cost: $1.2M FACT | CDOT’s page names no county. |
| CO 86 & CO 119 Upgrades | CDOT | Archived Project | Cost: $1.2M FACT | CDOT’s page names no county. |
| CO 96/US 50 Southeast Colorado Signal Replacement | CDOT | Archived Project | Cost: $1.2M FACT | Otero and Pueblo counties |
| Curb Ramp & Pedestrian Improvements in Adams, Arapahoe, Broomfield, Denver & Jefferson Counties | CDOT | Archived Project | Cost: $1.2M FACT | CDOT’s page names no county. |
| I-25 Curb Ramps Castle Pines to Orchard | CDOT | No status printed | Cost: $1.2M FACT | CDOT’s page names no county. |
| I-70 Eastbound Variable Speed Limit Signs between Empire and Idaho Springs | CDOT | No status printed | Cost: $1.2M FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Rock Fence Improvements | CDOT | No status printed | Cost: $1.2M FACT | CDOT’s page names no county. |
| Southeast Colorado Sign Replacement (12 locations) | CDOT | Active Construction | Construction Cost: $1.2M FACT | CDOT’s page names no county. |
| Traffic Signal Replacement in Boulder, Greeley | CDOT | No status printed | Cost: $1.2M FACT | Boulder and Weld counties |
| US 160 Rest Area Truck Parking Enhancements | CDOT | No status printed | Cost: $1.2M FACT | CDOT’s page names no county. |
| US 160: Del Norte to Monte Vista ADA & Road Improvements | CDOT | No status printed | Cost: $1.2M FACT | CDOT’s page names no county. |
| US 24 at Mountain View Drive Intersection Improvements in Leadville | CDOT | Archived Project | Cost: $1.2M FACT | Lake County |
| US 50 Bridge Repairs Over Agate Creek | CDOT | Archived Project | Cost: $1.2M FACT | Saguache County |
| US 550 Intersections (South to North) | CDOT | No status printed | Cost: $1.2M FACT | CDOT’s page names no county. |
| US 287 Longmont Signal Pole Improvements | CDOT | No status printed | Construction Cost: $1.19M FACT | Boulder County |
| HVAC, Electrical and Energy Upgrades, Colorado Talking Book Library | Department of Education | Appropriated this year | $1,179,689 FACT | Colorado Talking Book Library Denver County |
| ADA Ramp Upgrades in Longmont | CDOT | Archived Project | Cost: $1.125M FACT | CDOT’s page names no county. |
| I-76 Roadway Improvements East of Sterling | CDOT | No status printed | Cost: $1.12M FACT | Logan County |
| Adams & Arapahoe County Traffic Signal Replacement | CDOT | No status printed | Cost: $1.1M FACT | CDOT’s page names no county. |
| Bottleneck Mitigation in Centennial | CDOT | Archived Project | Construction Cost: $1.1M FACT | Arapahoe County |
| Boulder & Greeley Traffic Signal Pole Replacements | CDOT | Archived Project | Cost: $1.1M FACT | Boulder and Weld counties |
| Boulder Americans with Disabilities Act Ramp Enhancement | CDOT | Archived Project | Cost: $1.1M FACT | Boulder County |
| Broomfield & Jefferson County ADA Curb Ramp Upgrades | CDOT | Archived Project | Cost: $1.1M FACT | Broomfield and Jefferson counties |
| CO 12 & US 160 Repairs in Trinidad and La Veta | CDOT | Archived Project | Cost: $1.1M FACT | CDOT’s page names no county. |
| CO 67 Road & Bridge Improvements in Sedalia | CDOT | Archived Project | Cost: $1.1M FACT | Douglas County |
| CO 9 Park Avenue and 4 O’Clock Roundabout | CDOT | Archived Project | Cost: $1.1M FACT | CDOT’s page names no county. |
| I-25 at South Academy | CDOT | No status printed | Cost: $1.1M FACT | El Paso County |
| I-70 Vail Pass Drain Installation | CDOT | No status printed | Cost: $1.1M FACT | CDOT’s page names no county. |
| Signal Improvements on CO 7 in Boulder | CDOT | No status printed | Cost: $1.1M FACT | CDOT’s page names no county. |
| US 24 Intersection Improvements | CDOT | Archived Project | Construction Cost: $1.1M FACT | El Paso County |
| US 24 Structure I-12-T Bridge Preventative Maintenance | CDOT | Archived Project | Cost: $1.1M FACT | Chaffee County |
| US 40 & CO 13 Signals Upgrade in Craig | CDOT | No status printed | Construction Cost: $1.1M FACT | Moffat County |
| US 40 Craig Traffic Signal Replacement | CDOT | Archived Project | Cost: $1.1M FACT | Moffat County |
| US 40 Grand County Traffic Signal Replacement | CDOT | Archived Project | Cost: $1.1M FACT | Grand County |
| US 50 and CO 348 Culvert Repairs | CDOT | Archived Project | Cost: $1.1M FACT | Delta and Montrose counties |
| US 50 Delta Signal Improvements | CDOT | No status printed | Cost: $1.1M FACT | CDOT’s page names no county. |
| US 50/CO 291 Salida Pedestrian Improvements | CDOT | No status printed | Cost: $1.1M FACT | CDOT’s page names no county. |
| Southeast Colorado Timber Bridge Repair | CDOT | Active Construction | Construction Cost: $1.08M FACT | Custer, Huerfano, Las Animas, Otero and Pueblo counties |
| Region 5 Culvert Rehabilitation - US 160 | CDOT | No status printed | Cost: $1.07M FACT | CDOT’s page names no county. |
| Variable Message Boards in Kiowa, Prowers and Pueblo Counties | CDOT | No status printed | Cost: $1.06M FACT | Kiowa, Prowers and Pueblo counties |
| Roof Replacement, Art and Design Hall | Fort Lewis College | Appropriated this year | $1,004,554 FACT | Fort Lewis College La Plata County |
| I-25 Dry Creek Ramp Improvements | CDOT | Active Construction | Cost: $1.002M FACT | CDOT’s page names no county. |
| Replace Kitchen Refrigeration System, Buena Vista Minimum Security Center | Department of Corrections | Appropriated this year | $1,000,937 FACT | Buena Vista Minimum Security Center Chaffee County |
| 1st Avenue & Wadsworth Boulevard Signal Replacement | CDOT | Archived Project | Cost: $1M FACT | Jefferson County |
| ADA Ramp Upgrades in the Pueblo Metro Area | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| CO 119 Canyon Blvd. and Folsom St Signal Replacement | CDOT | Archived Project | Cost: $1M FACT | Boulder County |
| CO 133 Bowie Chip Seal | CDOT | Archived Project | Cost: $1M FACT | Gunnison County |
| CO 141 Bridge Rehabilitation Project between Gateway and Naturita | CDOT | Archived Project | Cost: $1M FACT | Montrose County |
| CO 340 Bike/Pedestrian Improvements | CDOT | Archived Project | Cost: $1M FACT | Mesa County |
| CO 402 & CR 9E Intersection Improvement | CDOT | Archived Project | Cost: $1M FACT | CDOT’s page names no county. |
| CO 52 Signal Improvements at WCR 41 | CDOT | No status printed | Construction Cost: $1M FACT | Weld County |
| CO 64 Accessibility Upgrades in Rangely | CDOT | Archived Project | Cost: $1M FACT | CDOT’s page names no county. |
| CO 91 Culvert Rehabilitation | CDOT | Archived Project | Cost: $1M FACT | Lake County |
| Colorado Correctional Industries Small Projects | Department of Corrections | Appropriated this year | $1,000,000 FACT | NO SINGLE SITE Colorado Correctional Industries operates inside many facilities; the appropriation names none of them. |
| This year’s budget line Colorado Correctional Industries small projects | DOC | Requested, recommended | $1,000,000 FACT | NO SINGLE SITE Colorado Correctional Industries operates inside many facilities; the appropriation names none of them. |
| Denver Metro Bridge & Expansion Joint Rehab | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| Fort Collins ADA Curb Ramp Replacement | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| I-25 Rockfall, Phase 2 | CDOT | No status printed | Cost: $1M FACT | Las Animas County |
| I-270 York Street Bridge Preventative Maintenance | CDOT | No status printed | Construction Cost: $1M FACT | Adams County |
| I-70 CCTV Camera Installation in Northeastern Colorado | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| I-70 Drainage Improvements near Airport Boulevard | CDOT | No status printed | Construction Cost: $1M FACT | Adams County |
| ITS Road Side Connected Vehicles Installation - Statewide | CDOT | Active Construction | Cost: $1M FACT | CDOT’s page names no county. |
| Northeastern Co. Signal Backplate Replacement Phase 2 | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| Region 3 ADA Ramp Improvements in Craig | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| Region 3 ADA Ramp Improvements in Hayden | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| Signal Pole Replacements in Windsor and Ault - Weld County | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| Southeast Colorado Sign Replacements | CDOT | Active Construction | Construction Cost: $1M FACT | Custer, Douglas, Fremont, Park, Pueblo and Teller counties |
| Statewide Camera Replacement | CDOT | Active Construction | Construction Cost: $1M FACT | Boulder, Cheyenne, Clear Creek, Conejos, Costilla, Dolores, Eagle, El Paso, Elbert, Grand, Gunnison, Hinsdale, Huerfano, Jackson, La Plata, Larimer, Las Animas, Logan, Mesa, Moffat, Montrose, Morgan, Otero, Ouray, Park, Pitkin, Prowers, Pueblo, Rio Blanco, Routt, Saguache, San Juan, San Miguel, Summit, Teller, Washington and Weld counties |
| Traffic Light Installation in Fort Collins | CDOT | Active Construction | Construction Cost: $1M FACT | Larimer County |
| US 40 Chip Seal in Steamboat Springs 2020 | CDOT | Archived Project | Cost: $1M FACT | Routt County |
| US 40 Pedestrian Improvements in Craig | CDOT | Archived Project | Cost: $1M FACT | Moffat County |
| US 50 Resurfacing Texas Creek to Coaldale | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| US 50 Traffic Signal Replacement and Radar Detection Project | CDOT | No status printed | Cost: $1M FACT | CDOT’s page names no county. |
| US 50B Structure Replacement | CDOT | Archived Project | Cost: $1M FACT | Bent County |
| US 6 Railroad Crossing Roadway Merger | CDOT | Archived Project | Construction Cost: $1M FACT | Morgan County |
| Wastewater Treatment Facility Repairs, Fort Lyon | Department of Local Affairs | Appropriated this year | $997,616 FACT | Fort Lyon Bent County |
| Northeastern Colorado Signal Backplate Replacement | CDOT | No status printed | Cost: $996,000 FACT | CDOT’s page names no county. |
| I-70 ITS Fiber Optic Installation | CDOT | Archived Project | Cost: $990,000 FACT | CDOT’s page names no county. |
| CO 71 Roadway Reinforcement South of Last Chance | CDOT | Archived Project | Cost: $987,000 FACT | Lincoln and Washington counties |
| Denver region youth service center replacement | DHS | Requested, not recommended | $984,500 FACT | Denver Region Youth Services Center Denver County |
| I-25 sign replacement project in El Paso County | CDOT | No status printed | Cost: $982,000 FACT | CDOT’s page names no county. |
| Repair Roof and Ceiling, Indoor Arena and Stalls | Lamar Community College | Appropriated this year | $973,191 FACT | Lamar Community College Prowers County |
| Timber Bridges Repairs in Southwest Colorado | CDOT | No status printed | Construction Cost: $963,303 FACT | Conejos, Ouray and Saguache counties |
| US 160 Mile Post 136.61 Culvert Replacement | CDOT | No status printed | Cost: $960,000 FACT | Archuleta County |
| Human Resources Information System | Department of Personnel | Appropriated this year | $955,500 FACT | An IT project. The act names no place. |
| I-70 Bridge Rehab at Tennyson Street and Sheridan Boulevard | CDOT | No status printed | Cost: $950,000 FACT | CDOT’s page names no county. |
| Federal Boulevard Signal Improvements | CDOT | Active Construction | Construction Cost: $935,000 FACT | Denver County |
| US 287 & CO 14 Flood Repairs | CDOT | No status printed | Cost: $934,000 FACT | CDOT’s page names no county. |
| Roof Replacement, Norlin Library | University of Colorado - Boulder | Appropriated this year | $933,290 FACT | University of Colorado Boulder Boulder County |
| US 36 Estes Park to Boulder Sign Replacement | CDOT | Archived Project | Construction Cost: $928,000 FACT | Boulder and Larimer counties |
| Southwestern Colorado Chain Up Station Lighting | CDOT | No status printed | Cost: $917,000 FACT | CDOT’s page names no county. |
| US 40 Intersection Improvements in Hugo | CDOT | Archived Project | Construction Cost: $916,000 FACT | Lincoln County |
| CO 151 Sambrito Creek Flow Improvements | CDOT | Archived Project | Cost: $913,000 FACT | CDOT’s page names no county. |
| CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement | CDOT | Archived Project | Cost: $900,000 FACT | Pueblo County |
| I-70 Rockfall Mitigation E. of Dumont | CDOT | No status printed | Cost: $900,000 FACT | CDOT’s page names no county. |
| Metro Denver Bridge Joint Replacement | CDOT | No status printed | Cost: $900,000 FACT | CDOT’s page names no county. |
| US 287 Adams County Signals & Ramps | CDOT | No status printed | Cost: $900,000 FACT | CDOT’s page names no county. |
| US 287 Concrete Panel Replacement in LaPorte | CDOT | Active Construction | Cost: $900,000 FACT | CDOT’s page names no county. |
| US 550 Chipeta Traffic Signal Installation | CDOT | Active Construction | Cost: $900,000 FACT | CDOT’s page names no county. |
| Replace HVAC, Lighting, and Roof System, Cramer Building | Colorado Northwestern Community College | Appropriated this year | $897,491 FACT | Colorado Northwestern CC — Rangely Rio Blanco County |
| Powers Boulevard and Bradley Road Traffic Signal Installation | CDOT | No status printed | Cost: $895,000 FACT | El Paso County |
| Boulder Traffic Signal Improvements | CDOT | Active Construction | Construction Cost: $885,349 FACT | Boulder County |
| CO 115 & Broadway Traffic Signal in Penrose | CDOT | Archived Project | Cost: $884,367 FACT | Fremont County |
| CO 96 Near Boone | CDOT | Archived Project | Cost: $873,500 FACT | CDOT’s page names no county. |
| CO 13 Emergency Repairs | CDOT | Archived Project | Cost: $850,000 FACT | CDOT’s page names no county. |
| CO 30 Traffic Signals in Aurora | CDOT | Archived Project | Cost: $850,000 FACT | CDOT’s page names no county. |
| US 50 and Baxter Road Intersection Safety Improvements | Construction Phase | CDOT | No status printed | Construction Cost: $850,000 FACT | Pueblo County |
| US 85 & Meadows Parkway Culvert Rehabilitation | CDOT | Active Construction | Cost: $841,706 FACT | CDOT’s page names no county. |
| Monumental Stair Upgrades, Carlson Theatre, Clare Small/TB01 | University of Colorado - Boulder | Appropriated this year | $840,308 FACT | University of Colorado Boulder Boulder County |
| CO 66 Flood Repair | CDOT | Archived Project | Cost: $839,945 FACT | CDOT’s page names no county. |
| Depreciation Fund for Regional Centers and Group Homes | Department of Human Services | Appropriated this year | $832,718 FACT | NO SINGLE SITE A depreciation fund for regional centers and group homes as a class, not a building. |
| This year’s budget line Depreciation Fund for regional center group homes | DHS | Requested, recommended | $832,718 FACT | NO SINGLE SITE A depreciation fund for regional centers and group homes as a class, not a building. |
| Replace Kitchen Refrigeration System, Arkansas Valley Correctional Facility | Department of Corrections | Appropriated this year | $831,567 FACT | Arkansas Valley Correctional Facility Crowley County |
| Arapahoe County Curb Ramps along CO 30/6th Avenue | CDOT | Active Construction | Construction Cost: $827,919 FACT | Arapahoe County |
| Denver Metro Area Retaining Wall and Roadway Repairs | CDOT | Archived Project | Cost: $825,000 FACT | CDOT’s page names no county. |
| Elizabeth Road Resurfacing Eagleridge Road to Ridge Road | CDOT | Archived Project | Cost: $820,000 FACT | CDOT’s page names no county. |
| I-76 Concrete Panel Replacement west of Fort Morgan | CDOT | No status printed | Cost: $818,000 FACT | CDOT’s page names no county. |
| I-70 & Sheridan Intersection Improvements | CDOT | No status printed | Cost: $807,000 FACT | CDOT’s page names no county. |
| US 34 & CO 402 Intersection Improvements | CDOT | Archived Project | Construction Cost: $802,000 FACT | Larimer County |
| Essential Culvert Repairs in Metro Denver | CDOT | Archived Project | Cost: $800,000 FACT | CDOT’s page names no county. |
| US 85 Resurfacing in Adams County | CDOT | No status printed | Construction Cost: $800,000 FACT | Adams County |
| CO 145 Curb Ramp Upgrades in Downtown Dolores | CDOT | Archived Project | Cost: $797,000 FACT | CDOT’s page names no county. |
| Pueblo County Highway Sign Replacement | CDOT | No status printed | Cost: $791,000 FACT | CDOT’s page names no county. |
| US 287 Repairs at Larimer County Road 17 | CDOT | No status printed | Cost: $790,000 FACT | CDOT’s page names no county. |
| CO 21 Powers Boulevard Improvements at Omaha Boulevard | CDOT | Archived Project | Cost: $773,000 FACT | CDOT’s page names no county. |
| CO 14 Cameron Peak Emergency Response Culvert | CDOT | Archived Project | Cost: $769,386 FACT | Larimer County |
| Upgrade Door Hardware and Access Control, Campuswide | Arapahoe Community College | Appropriated this year | $756,964 FACT | Arapahoe Community College Arapahoe County |
| I-25 and Erie Parkway Ramp Signalization | CDOT | No status printed | Cost: $756,000 FACT | CDOT’s page names no county. |
| CO 66 Culverts West of Platteville | CDOT | Archived Project | Cost: $750,000 FACT | Weld County |
| Electronic Security System Replacement, Colorado State Penitentiary (Capital Renewal) | Department of Corrections | Appropriated this year | $748,289 FACT | Colorado State Penitentiary Fremont County |
| This year’s budget line Electronic security system replacement, CSP ph 1/2 (CR) | DOC | Requested, recommended | $748,289 FACT | Colorado State Penitentiary Fremont County |
| US 550 Red Mountain Pass Avalanche Control System | CDOT | Active Construction | Construction Cost: $744,900 FACT | Ouray County |
| Weld County Americans with Disabilities Act Curb Ramps | CDOT | Active Construction | Construction Cost: $739,500 FACT | Weld County |
| Elevator Upgrades, Six Buildings | Colorado Community College System | Appropriated this year | $726,841 FACT | Colorado Community College System Denver County |
| Door Access Control Upgrade | Fort Lewis College | Appropriated this year | $722,818 FACT | An IT project. The act names no place. |
| ADA Ramp Project on US 6 & South Frontage Road in Eagle and Vail | CDOT | Archived Project | Construction Cost: $715,000 FACT | Eagle County |
| I-70 Median Safety Improvements Near Horizon Drive in Grand Junction | CDOT | No status printed | Cost: $711,736 FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Roadway Treatment & Replacement | CDOT | No status printed | Cost: $706,000 FACT | CDOT’s page names no county. |
| CO 52 Culvert Extension at Weld County Road 19 | CDOT | Archived Project | Cost: $705,000 FACT | CDOT’s page names no county. |
| US 287 and CO 14 Improvements (at Ted's Place) | CDOT | No status printed | Cost: $705,000 FACT | CDOT’s page names no county. |
| Fairplay Mobility Hub Improvements | CDOT | Active Construction | Construction Cost: $702,000 FACT | Park County |
| CO 115 and CO 9 Critical Culverts | CDOT | Archived Project | Cost: $700,000 FACT | El Paso County |
| Regional Property Preservation Projects | History Colorado | Appropriated this year | $700,000 FACT | NO SINGLE SITE History Colorado’s regional property preservation, named in the plural and tied to no one property. |
| This year’s budget line Regional property preservation projects | HistCO | Requested, recommended | $700,000 FACT | NO SINGLE SITE History Colorado’s regional property preservation, named in the plural and tied to no one property. |
| CO 14 Embankment Repairs West of Rustic | CDOT | Archived Project | Cost: $693,270 FACT | CDOT’s page names no county. |
| I-25 Panel Replacement Near Wellington | CDOT | No status printed | Cost: $687,231 FACT | CDOT’s page names no county. |
| Roof Replacement, Tech Building A | Colorado Mesa University | Appropriated this year | $683,090 FACT | Colorado Mesa University Mesa County |
| 6th Avenue Improvements from Telluride Street to Tower Road | CDOT | Archived Project | Cost: $680,000 FACT | Arapahoe County |
| CO 170 Critical Culverts, Boulder County | CDOT | Archived Project | Cost: $679,000 FACT | Boulder County |
| US 550 Red Mountain Pass Shed Tunnel Lighting Upgrades | CDOT | No status printed | Cost: $675,000 FACT | CDOT’s page names no county. |
| Denver Metro Culvert Repairs | CDOT | No status printed | Construction Cost: $670,000 FACT | Clear Creek, Denver and Jefferson counties |
| US 550 & CO 62 Surface Improvements in La Plata & Ouray Counties | CDOT | No status printed | Cost: $661,000 FACT | CDOT’s page names no county. |
| US 50 Culvert Replacement in Mesa & Montrose Counties | CDOT | Archived Project | Construction Cost: $660,655 FACT | Mesa and Montrose counties |
| Wadsworth Boulevard & Evans Avenue Intersection Improvements | CDOT | Archived Project | Construction Cost: $655,850 FACT | Jefferson County |
| Region 3 Stencil Project | CDOT | No status printed | Cost: $650,000 FACT | CDOT’s page names no county. |
| CO 82 & Catherine Store Signal Upgrades | CDOT | No status printed | Construction Cost: $647,000 FACT | Garfield County |
| Emergency Generator, HVAC Replacements, Restroom Remodel at Fort Collins Readiness Center | Department of Military and Veterans Affairs | Appropriated this year | $644,200 FACT | Fort Collins Readiness Center Larimer County |
| I-25 Overhead Signs Replacement | CDOT | No status printed | Construction Cost: $640,000 FACT | El Paso and Pueblo counties |
| Denver Metro Sign Replacement | CDOT | Archived Project | Cost: $635,207 FACT | CDOT’s page names no county. |
| I-70 Improvements from Deer Trail to Bethune | CDOT | No status printed | Cost: $623,007 FACT | CDOT’s page names no county. |
| CO 12 Culvert Repairs in Huerfano & Las Animas Counties | CDOT | Archived Project | Cost: $620,943 FACT | Huerfano and Las Animas counties |
| US 287 Resurfacing near Owl Canyon Road | CDOT | No status printed | Construction Cost: $617,700 FACT | Larimer County |
| I-25 Culvert Repairs Trinidad | CDOT | No status printed | Cost: $613,000 FACT | CDOT’s page names no county. |
| Bridge Guardrail Replacement near Boulder & Deer Trail | CDOT | Archived Project | Construction Cost: $612,588 FACT | Arapahoe and Boulder counties |
| I-25 Gallinas Bridge Rehabilitation | CDOT | No status printed | Cost: $611,000 FACT | CDOT’s page names no county. |
| CO 67 & Kelley's Road Signal & ADA Curb Ramp Improvements | CDOT | Archived Project | Cost: $600,000 FACT | Teller County |
| US 550/US 160 ADA Ramp Enhancement | CDOT | No status printed | Cost: $600,000 FACT | CDOT’s page names no county. |
| Southwest Colorado Highway Guardrail Upgrades | CDOT | No status printed | Cost: $588,125 FACT | CDOT’s page names no county. |
| Interior Medline and Pharmacy Improvements, Colorado Territorial Correctional Facility | Department of Corrections | Appropriated this year | $587,245 FACT | Colorado Territorial Correctional Facility Fremont County |
| CO 257 & 392 Curb Ramp Upgrades Near Windsor | CDOT | Archived Project | Cost: $572,000 FACT | Larimer and Weld counties |
| US 50 Bridge over East Dry Creek in Pueblo | CDOT | Archived Project | Cost: $571,000 FACT | El Paso County |
| Sign Panel and Structure Replacement, Denver Metro | CDOT | Travel Advisory, News | Cost: $570,000 FACT | Adams, Arapahoe, Douglas and Jefferson counties |
| US 34 CCTV Weather Cameras from Greeley to Wiggins | CDOT | Archived Project | Construction Cost: $558,098 FACT | Morgan and Weld counties |
| CO 14 Poudre Canyon Guardrail Installation | CDOT | Archived Project | Cost: $556,584 FACT | CDOT’s page names no county. |
| CO 184 Culvert Repairs in Montezuma County | CDOT | Archived Project | Cost: $553,000 FACT | Montezuma County |
| I-70 Crack Seal from the Kansas State Line to Flagler | CDOT | No status printed | Cost: $549,000 FACT | CDOT’s page names no county. |
| US 6 Clear Creek Canyon Trail Phase 2 | CDOT | Archived Project | Cost: $548,000 FACT | Clear Creek County |
| CO 92 Bridge Maintenance in North Fork | CDOT | Archived Project | Cost: $544,288 FACT | Gunnison County |
| US 50 Crosswalk, Median & Roadway Improvements in Gunnison | CDOT | Archived Project | Cost: $536,000 FACT | Gunnison County |
| Southwestern Colorado Guardrail Replacement | CDOT | No status printed | Cost: $528,000 FACT | CDOT’s page names no county. |
| I-70 Glenwood Canyon Sign Replacement | CDOT | No status printed | Cost: $525,000 FACT | CDOT’s page names no county. |
| US 287 Intersection Improvements at Foothills Pkwy | CDOT | No status printed | Cost: $525,000 FACT | CDOT’s page names no county. |
| Grand Junction Ramp Upgrades on I-70 & CO 340 | CDOT | No status printed | Cost: $523,000 FACT | CDOT’s page names no county. |
| CO 392 Weld County Safety Improvements | CDOT | Archived Project | Construction Cost: $517,741 FACT | Weld County |
| I-25 Frontage Road Resurfacing | CDOT | No status printed | Construction Cost: $514,000 FACT | Larimer County |
| CO 64 Pedestrian Improvements in Rangley | CDOT | Archived Project | Cost: $512,000 FACT | Rio Blanco County |
| Inspector General Offense Reporting System | Department of Corrections | Appropriated this year | $510,669 FACT | An IT project. The act names no place. |
| CO 17 Structure over Conejos River P-11-A Scour Mitigation | CDOT | Archived Project | Cost: $500,000 FACT | Conejos County |
| CO 391 Kipling & 48th Avenue Traffic Signal Replacement | CDOT | Archived Project | Cost: $500,000 FACT | CDOT’s page names no county. |
| CO 83 Douglas County Sign Replacement | CDOT | Archived Project | Cost: $500,000 FACT | CDOT’s page names no county. |
| Highway Construction Projects | Department of Transportation | Appropriated this year | $500,000 FACT | NO SINGLE SITE Highway construction appropriated to the department, not to a named corridor. |
| I-25 Larimer County Concrete Panel Replacement | CDOT | Active Construction | Cost: $500,000 FACT | CDOT’s page names no county. |
| CO 145 Culvert Installation Near Telluride | CDOT | Archived Project | Cost: $495,861 FACT | CDOT’s page names no county. |
| I-70 West Vail Pass Basin Access Road | CDOT | No status printed | Cost: $483,000 FACT | CDOT’s page names no county. |
| CO 119 Wall Repair in Black Hawk | CDOT | Archived Project | Cost: $481,505 FACT | Clear Creek County |
| US 34 & US 85 Curb Ramp Upgrades in Greeley | CDOT | Archived Project | Cost: $480,157 FACT | Weld County |
| Southeastern Colorado Stencil Marking | CDOT | No status printed | Cost: $470,000 FACT | CDOT’s page names no county. |
| Pedestrian Bridge Replacement | Community College of Aurora | Appropriated this year | $469,318 FACT | Community College of Aurora Arapahoe County |
| ARDEC Kerbel Well Redrill | Colorado State University | Appropriated this year | $463,390 FACT | Colorado State University Larimer County |
| Southeast Colorado Highway Crosswalk & Marking Improvements | CDOT | No status printed | Cost: $460,000 FACT | CDOT’s page names no county. |
| Stencil Project in Teller & El Paso Counties | CDOT | Active Construction | Cost: $448,255 FACT | CDOT’s page names no county. |
| North I-25 Metering | CDOT | No status printed | Cost: $440,047 FACT | CDOT’s page names no county. |
| US 34 & US 287 Curb Ramp Upgrades in Loveland | CDOT | Archived Project | Cost: $440,000 FACT | Larimer County |
| US 40 Crack Seal Repair | CDOT | Archived Project | Construction Cost: $437,000 FACT | Moffat County |
| Curb Ramp Replacement in Arapahoe & Jefferson Counties | CDOT | Archived Project | Cost: $435,528 FACT | CDOT’s page names no county. |
| CO 14 Signal Installation at CR 5 | CDOT | No status printed | Construction Cost: $434,118 FACT | Larimer County |
| Southeastern Colorado Stencil Project | CDOT | No status printed | Cost: $429,000 FACT | CDOT’s page names no county. |
| CO 52 Near Wiggins Underground Drainage Improvements | CDOT | Archived Project | Cost: $427,519 FACT | CDOT’s page names no county. |
| Southeastern Colorado Culvert Repairs | CDOT | No status printed | Cost: $424,274 FACT | CDOT’s page names no county. |
| Southeastern Colorado Culvert Repairs in Huerfano County | CDOT | No status printed | Cost: $424,000 FACT | CDOT’s page names no county. |
| US 50A Culvert Repairs in Cañon City | CDOT | No status printed | Construction Cost: $423,500 FACT | Fremont County |
| CO 83 & US 285 Centerline Rumble Strip | CDOT | Archived Project | Construction Cost: $417,000 FACT | Douglas and Jefferson counties |
| CO 52 & CO 59 Timber Bridge Preservation | CDOT | Archived Project | Cost: $405,000 FACT | CDOT’s page names no county. |
| Denver Metro Traffic Signal Improvements | CDOT | Archived Project | Cost: $400,000 FACT | Douglas County |
| Colorado Springs & Pueblo Signal Backplates | CDOT | Active Construction | Construction Cost: $397,111 FACT | El Paso and Pueblo counties |
| Southwest Colorado Crack Repairs on US 550, CO 184 and CO 141 | CDOT | No status printed | Cost: $386,075 FACT | CDOT’s page names no county. |
| I-76 in Morgan County Concrete Panel Replacement | CDOT | No status printed | Cost: $383,432 FACT | CDOT’s page names no county. |
| US 50 Curb Ramp Upgrades in South Delta | CDOT | No status printed | Cost: $380,000 FACT | CDOT’s page names no county. |
| Fort Collins ADA Curb Ramp Improvements | CDOT | No status printed | Cost: $376,000 FACT | CDOT’s page names no county. |
| US 285 Structure over Chalk Creek J-12-B Scour Mitigation | CDOT | No status printed | Cost: $375,000 FACT | Chaffee County |
| Insectary Foundation Repair | Department of Agriculture | Appropriated this year | $373,939 FACT | Palisade Insectary Mesa County |
| I-70 Avalanche Control Near the Eisenhower-Johnson Memorial Tunnels & US 40 Berthoud Pass | CDOT | No status printed | Cost: $371,000 FACT | CDOT’s page names no county. |
| School Finance System Modernization | Department of Education | Appropriated this year | $369,279 FACT | An IT project. The act names no place. |
| Monarch Pass Avalanche Control Shelter | CDOT | No status printed | Cost: $366,000 FACT | CDOT’s page names no county. |
| US 24 Americans with Disabilities Act Ramps in Divide, CO | CDOT | Archived Project | Cost: $359,777 FACT | Teller County |
| CO 71 & CO 94 Intersection Improvements at Punkin Center | CDOT | Archived Project | Cost: $352,000 FACT | Lincoln County |
| Road Closure Gate Installation in Southeast Colorado | CDOT | No status printed | Cost: $350,000 FACT | CDOT’s page names no county. |
| US 6 North Avenue Americans with Disabilities Act Ramps | CDOT | Archived Project | Cost: $343,000 FACT | Mesa County |
| US 84 Culvert Repair South of Pagosa Springs | CDOT | No status printed | Cost: $337,000 FACT | CDOT’s page names no county. |
| I-76 Denver Metro Sign Replacement | CDOT | No status printed | Construction Cost: $328,000 FACT | Adams County |
| CO 52 & CO 66 Critical Culvert Rehabilitation | CDOT | Archived Project | Cost: $304,000 FACT | CDOT’s page names no county. |
| CO 1 Resurfacing in Wellington | CDOT | Archived Project | Cost: $300,000 FACT | CDOT’s page names no county. |
| CO 71 Bridge Repair Otero County | CDOT | Archived Project | Cost: $300,000 FACT | Otero County |
| Sign Replacement on CO 72 and CO 74 in Boulder, Jefferson & Gilpin Counties | CDOT | No status printed | Cost: $300,000 FACT | CDOT’s page names no county. |
| US 85 at County Road 14.5 Intersection Improvements | CDOT | No status printed | Cost: $300,000 FACT | Weld County |
| US 6 Rumble Strip Installation from Nebraska to Sterling | CDOT | Archived Project | Cost: $298,000 FACT | Logan and Phillips counties |
| Western Colorado Roundabout Striping | CDOT | No status printed | Construction Cost: $288,898 FACT | Eagle, Garfield, Mesa, Pitkin and Summit counties |
| CO 1 & Southbound I-25 Ramp Traffic Signal Installation in Wellington | CDOT | Archived Project | Cost: $275,385 FACT | CDOT’s page names no county. |
| CO 14 Rumble Strip Installation in Weld County | CDOT | Archived Project | Cost: $261,000 FACT | CDOT’s page names no county. |
| Sign Replacement on US 550, US 160 & CO 140 in La Plata & San Juan Counties | CDOT | No status printed | Cost: $260,000 FACT | CDOT’s page names no county. |
| Northern Colorado Culvert Lining & Repair | CDOT | Active Construction | Construction Cost: $257,788 FACT | Larimer and Weld counties |
| I-25 Guardrail in Pueblo County | CDOT | No status printed | Cost: $250,000 FACT | Pueblo County |
| I-270 Gabion Wall Repair | CDOT | Active Construction | Construction Cost: $247,000 FACT | Adams County |
| US 24 Stone Wall Repairs South of Cascade | CDOT | Archived Project | Cost: $240,000 FACT | El Paso County |
| Campus Security Improvements | Otero College | Appropriated this year | $234,300 FACT | An IT project. The act names no place. |
| Crack Sealing on US 160 & CO 145 | CDOT | Archived Project | Cost: $234,000 FACT | CDOT’s page names no county. |
| CO 66 & US 85 Sidewalk Improvements Near Platteville | CDOT | Archived Project | Cost: $230,000 FACT | CDOT’s page names no county. |
| I-70 & I-76 Denver Metro Sign Replacement | CDOT | No status printed | Construction Cost: $200,000 FACT | Adams, Arapahoe, Denver and Jefferson counties |
| CO 291/CR 154 Turn Lanes in Salida | CDOT | Archived Project | Cost: $180,000 FACT | Chaffee County |
| CO 392 & CR 55 Turn Improvements | CDOT | Archived Project | Cost: $174,037 FACT | Weld County |
| CO 93 Improvements | CDOT | Archived Project | Cost: $169,000 FACT | Boulder County |
| CO 14 & Weld County Road 33 Improvements | CDOT | Archived Project | Cost: $167,000 FACT | Weld County |
| Denver Metro ADA Ramps in Arapahoe, Douglas and Jefferson Counties | CDOT | No status printed | Cost: $100,000 FACT | CDOT’s page names no county. |
| Southbound I-225 to 17th Place Off-Ramp Improvements | CDOT | No status printed | Cost: $98,000 FACT | CDOT’s page names no county. |
| CO 72 Chipseal in Boulder County | CDOT | Archived Project | Cost: $97,335 FACT | CDOT’s page names no county. |
| CO 119 Boulder Canyon Tunnel Repairs | CDOT | No status printed | Cost: $89,000 FACT | Boulder County |
| US 24 & Fountain Avenue Traffic Flow Improvements to Pikes Peak Highway in Cascade | CDOT | Archived Project | Cost: $50,000 FACT | El Paso County |
| CO 67 & US 24 Culvert & Inlet Construction | CDOT | Archived Project | Cost: $6,000 FACT | Teller County |
| CO 96 Pueblo Intersection | CDOT | Archived Project | Construction Cost: $244.500 FACT | Pueblo County |
| Bridge Repairs in Denver & Adams County | CDOT | No status printed | Construction Cost: $1–5M FACT | Adams and Denver counties |
| CO 101 Bridge & Culvert Replacement south of Las Animas | CDOT | Archived Project | Cost: $1–5M FACT | Bent and Las Animas counties |
| CO 109 Bridge over US 50, BNSF Railroad | CDOT | Archived Project | Cost: $5–20M FACT | Otero County |
| CO 115 and CO 67 Florence Drainage Improvements | CDOT | Archived Project | Cost: $1–5M FACT | Fremont County |
| CO 141 Naturita North Paving | CDOT | Archived Project | Cost: $5–20M FACT | CDOT’s page names no county. |
| CO 142 ADA Ramp Improvements in Manassa | CDOT | Archived Project | Cost: $0–$1M FACT | Conejos County |
| Denver Metro ADA Ramps Construction Phase 6 | CDOT | Archived Project | Cost: $1–5M FACT | CDOT’s page names no county. |
| Garfield and Mesa County Culvert Project | CDOT | No status printed | Cost: $1–5M FACT | CDOT’s page names no county. |
| Garfield County ADA Ramp Improvements | CDOT | No status printed | Cost: $1–5M FACT | CDOT’s page names no county. |
| I-25 Ramp Metering in Southeast Colorado | CDOT | No status printed | Cost: $1–5M FACT | El Paso County |
| I-76 Concrete Replacement Morgan/Weld Counties | CDOT | No status printed | Cost: $5–20M FACT | CDOT’s page names no county. |
| US 24 Bridge Replacement east of Peyton | CDOT | Archived Project | Cost: $1–5M FACT | El Paso County |
| US 24 Emergency Culvert Repairs at Ruxton Avenue | CDOT | Archived Project | Cost: $1.5–2M FACT | El Paso County |
| US 24 Wilkerson Pass Safety Improvements | CDOT | Archived Project | Cost: $1–5M FACT | Park County |
| US 50 Las Animas Resurfacing | CDOT | No status printed | Cost: $5–20M FACT | CDOT’s page names no county. |
| Weld County ADA Ramps | CDOT | Active Construction | Cost: $5–20M FACT | CDOT’s page names no county. |
| 4th Street Bridge Construction in Pueblo | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| 80th Avenue over US 36 | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| 84th Avenue over I-25 | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| A CDOT project page we could not read | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Active Construction Projects | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Alameda Avenue Corridor Improvements | Design Phase | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| American Recovery & Reinvestment Act (ARRA) | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Arapahoe Road and I-25 Interchange | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Arapahoe Road from I-25 to Parker Road Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Arapahoe Road Resurfacing | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Burnham Yard Transportation Planning Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| C-470 & Ken Caryl Intersection Improvements | CDOT | Archived Project | NOT PUBLISHED | Jefferson County |
| C-470 from I-25 to I-70 Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | Douglas and Jefferson counties |
| C-470 Resurfacing from S. Rooney Road to Ken Caryl | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| C-470 Trail Bridge over Acres Green | CDOT | No status printed | NOT PUBLISHED | Douglas County |
| C-470/US 85 (Santa Fe Drive) Interchange | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 1 Realignment in Wellington, Larimer County | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 1 Striping & Access Control Plan | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 101 Bridges South of Las Animas | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 103 Improvements (I-70 South for 8.3 Miles) | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 113 Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | Logan County |
| CO 115 Bridge Repair & Mitigation Work Along the Arkansas River | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 115 Cañon City through Florence Safety Improvements and Resurfacing Design | CDOT | Studies | NOT PUBLISHED | Fremont County |
| CO 119 from Boulder to Longmont Intelligent Transportation System Installation | CDOT | Archived Project | NOT PUBLISHED | Boulder County |
| CO 119 North Clear Creek Valley Restoration Project | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 12 Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 12 Southern Mountain Loop | Planning and Environmental Linkages (PEL) Study | CDOT | Studies | NOT PUBLISHED | Huerfano and Las Animas counties |
| CO 128 at I-25 Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 13 near Meeker in Rio Blanco County | CDOT | Archived Project | NOT PUBLISHED | Rio Blanco County |
| CO 133 Carbondale Access Control Plan | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 14 Sterling Resurfacing | CDOT | Archived Project | NOT PUBLISHED | Logan County |
| CO 14, I-25 to CR 23 East of Fort Collins | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 141 Mesa Creek Bridge Repair | CDOT | No status printed | NOT PUBLISHED | Montrose County |
| CO 145 Highway, Safety & Drainage Improvements, Telluride to Placerville | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 145 San Miguel County Cribwall | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 145 Society Turn Intersection near Telluride | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 149 Creede North & Lake City North Resurfacing | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 151 Emergency Culvert North of Arboles | CDOT | Archived Project | NOT PUBLISHED | Archuleta County |
| CO 160 Bridge Replacement East and West of Pritchett | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 170 Eldorado Canyon | CDOT | Archived Project | NOT PUBLISHED | Boulder County |
| CO 172-Becker Street Intersection Improvements in Ignacio | CDOT | Archived Project | NOT PUBLISHED | La Plata County |
| CO 172/151 Signalization in La Plata County | CDOT | Archived Project | NOT PUBLISHED | La Plata County |
| CO 184 Narraguinnep Canal Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | Dolores County |
| CO 196 Culvert Rehabilitation in Bent County | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 21 (Powers Boulevard) Bridges | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 21 Powers Boulevard and Old Ranch Road | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 23 Holyoke to Nebraska State Line Resurfacing | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 24 from Seibert to Stratton | CDOT | No status printed | NOT PUBLISHED | Kit Carson County |
| CO 257 Big Thompson River | CDOT | Archived Project | NOT PUBLISHED | Weld County |
| CO 266 & CO 71 Bridge Replacement North of Rocky Ford | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 30 Pedestrian Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 392 Lucerne East Resurfacing | CDOT | Archived Project | NOT PUBLISHED | Weld County |
| CO 52 Main Street in Hudson | CDOT | Archived Project | NOT PUBLISHED | Weld County |
| CO 56 East of Berthoud to I-25 Resurfacing | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 60 Chip Seal | CDOT | No status printed | NOT PUBLISHED | Larimer and Weld counties |
| CO 66 Overlay at US 287 to I-25 | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 69 Resurfacing from Hillside to Texas Creek | CDOT | Active Construction | NOT PUBLISHED | Custer and Fremont counties |
| CO 7 (Upper) Estes Park to Raymond | CDOT | Flood, Archived Project | NOT PUBLISHED | Boulder and Larimer counties |
| CO 7 Cherryvale Road to 75th Street | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 7 from I-25 to US 287 Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 7 Intersection Improvements in Lafayette Design | CDOT | No status printed | NOT PUBLISHED | Boulder County |
| CO 7 Multimodal Corridor from Brighton to Boulder | Design Phase | CDOT | No status printed | NOT PUBLISHED | Adams and Boulder counties |
| CO 7 South of Estes Park | CDOT | Archived Project | NOT PUBLISHED | Larimer County |
| CO 71 & CO 59 Chip Seal and Minor Resurfacing | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 71 Bridge Replacement in Rocky Ford | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 72A Resurfacing | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 75 Intersections Improvements in Littleton | CDOT | No status printed | NOT PUBLISHED | Arapahoe County |
| CO 82 Corridor Projects | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 82 Grand Avenue Paving Project (GAPP II) | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 82 Wall Repair | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 83 & Stagecoach Road Intersection Improvements | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 83 Safety & Operations Analysis | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| CO 88/Arapahoe Road over Cherry Creek | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| CO 9 at Currant Creek | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 91 Copper Mountain to Fremont Pass | CDOT | Archived Project | NOT PUBLISHED | Eagle County |
| CO 92 Gunnison River Bridge Design Phase | CDOT | Archived Studies | NOT PUBLISHED | Delta and Gunnison counties |
| CO 92 Hotchkiss to Crawford Resurfacing | CDOT | Archived Project | NOT PUBLISHED | Delta and Gunnison counties |
| CO 92 Stengel’s Hill: Streamlined Design-Build Project | CDOT | Archived Studies | NOT PUBLISHED | CDOT’s page names no county. |
| CO 93 from Golden to Boulder Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | Boulder County |
| CO 93 South of Boulder | CDOT | Archived Project | NOT PUBLISHED | Boulder County |
| CO 96 Bridges | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| CO 97 Nucla Sidewalk Reconstruction | CDOT | No status printed | NOT PUBLISHED | Montrose County |
| Colorado Boulevard & Hampden Avenue Reconstruction | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Colorado Boulevard between Alameda Ave and Martin Luther King Boulevard | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Colorado Transportation Management Center Situational Awareness System | CDOT | Statewide News, Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Completed Studies | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Coordinated Adaptive Ramp Meter Pilot Study | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| Cottonwood Pass Concept Design in Eagle & Garfield Counties | CDOT | Studies | NOT PUBLISHED | Eagle and Garfield counties |
| Denver Metro Bicycle & Pedestrian Safety Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Denver Metro Bus Rapid Transit (BRT) Project | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Denver Metro Sign Structures | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Denver Metro Wall Repairs | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Eastbound US 36 Emergency Rebuild Near Wadsworth Boulevard | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Eastern Timber Bridge Replacement in Rural Colorado | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| FASTER | CDOT | FASTER | NOT PUBLISHED | CDOT’s page names no county. |
| Federal Boulevard Corridor Safety Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Federal Boulevard from Hampden to Belleview avenues Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| Federal Boulevard Median Project, 52nd to 67th | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Flood-Related Projects | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Glenwood Canyon Rest Areas Improvements Design | CDOT | Studies | NOT PUBLISHED | Eagle and Garfield counties |
| Grand Avenue Bridge | CDOT | Archived Project | NOT PUBLISHED | Grand County |
| Grand Junction Mobility Hub Design | CDOT | No status printed | NOT PUBLISHED | Mesa County |
| I-225 Widening | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 (US 36 to 104th Avenue) Safety & Operations Improvements Study | CDOT | Studies | NOT PUBLISHED | Adams County |
| I-25 & CO 7: Interim Transit Improvements | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 & Exit 11 Interchange Improvements in Trinidad | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 & Mulberry Interchange Improvements | Design & Planning Phase | CDOT | Studies | NOT PUBLISHED | Larimer County |
| I-25 & Plum Creek/Meadows Parkway | CDOT | Past Construction | NOT PUBLISHED | Douglas County |
| I-25 and Alameda Avenue Interchange | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 and Arapahoe Road Bridge Replacement | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 and CO 94 Safety Improvements | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 and Fillmore Street Interchange | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 at State Highway 392 Interchange Improvement Project | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Bridge Deck and Joint Repairs | CDOT | No status printed | NOT PUBLISHED | Boulder, Larimer and Weld counties |
| I-25 Bridges South of Fountain | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Central Express Lanes: Downtown Denver to US 36 | CDOT | Express Lanes, Tolling | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Central Planning & Environmental Linkages (PEL) Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Climbing Lane | CDOT | No status printed | NOT PUBLISHED | Weld County |
| I-25 Exit 108 Interchange Reconstruction & Rest Area Study | CDOT | Studies | NOT PUBLISHED | Pueblo County |
| I-25 Expansion, Colorado Springs to Monument | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Frontage Road Reconstruction (Little Thompson River Bridge) | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Mobility Hub Site Selection Study - Castle Rock | CDOT | Studies | NOT PUBLISHED | Douglas County |
| I-25 near 15th Street | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 North Design Build (Colorado Springs) | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 North Forty | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Over 48th Avenue Bridge Joint Repair | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Ramp Metering in Douglas County | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Raton Pass Rockfall Mitigation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Sky Ridge Emergency Bridge Repair | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 South Gap Environmental Assessment: Monument to Castle Rock | Environmental Assessment | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Southbound Pilot Program | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Speer Boulevard & 23rd Avenue Bridge Repairs | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25 Widening (Lane Balance) from Lincoln Avenue to County Line Road | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-25: Speer & 23rd Bridge Interchange | National Environmental Policy Act & Preliminary Design | CDOT | Environmental | NOT PUBLISHED | Denver County |
| I-270 Corridor Improvements Study | CDOT | Environmental, Studies | NOT PUBLISHED | CDOT’s page names no county. |
| I-270 Critical Bridge Replacements | CDOT | Archived Project | NOT PUBLISHED | Adams County |
| I-70 and CO 59 Emergency Bridge Repairs | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 at Eagle | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Beavertail Tunnel Lighting Replacement | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Bridge Rehabilitation Over the Colorado River Near Rifle | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Bridge Replacement in Dotsero | CDOT | Bridge Enterprise | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Deer Trail East | CDOT | No status printed | NOT PUBLISHED | Elbert County |
| I-70 East of Burlington Bridge Rehabilitation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Eastbound Auxiliary Lane | Frisco to Silverthorne | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Edwards Interchange Phase I | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Exit 26 Grand Junction Diverging Diamond Interchange | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Exit 26 Ramp Improvements in Grand Junction | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 from Denver to Vail: Intelligent Transportation System installation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Frontage Road - East of Idaho Springs | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Genesee Bike Path and Pedestrian Bridge | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Kipling Interchange Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Mountain Corridor Context Sensitive Solutions (CSS) | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Mountain Corridor: Golden to the Glenwood Springs | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Mountain Corridor: Veterans Memorial Tunnels to Continental Divide | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Mountain Express Lane | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Overlay and Guardrail Repair from Eisenhower Johnson Memorial Tunnel to Georgetown | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Resurfacing from Dotsero to Gypsum | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Structure Replacement West of EJMT | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Viaduct Expansion Joint Repairs | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Westbound Bakerville to Eisenhower-Johnson Memorial Tunnel Climbing Lane Environmental Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Westbound Peak Period Shoulder Lane | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Westbound Twin Tunnels (Veterans Memorial Tunnels) | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70 Wrong Way Detection Maintenance | CDOT | Active Construction | NOT PUBLISHED | CDOT’s page names no county. |
| I-70B Reconstruction | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-70B Third Street to Sixth Street Improvements | Design Phase | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-76 Brush Reconstruction | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| I-76 Hillrose to Atwood Resurfacing | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Intelligent Transportation System Innovative Technologies | CDOT | Statewide News | NOT PUBLISHED | CDOT’s page names no county. |
| Maroon Creek Bridge | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Military Access, Mobility & Safety Improvements | CDOT | Archived Project | NOT PUBLISHED | El Paso County |
| Miscellaneous Northeastern Colorado Projects | CDOT | RAMP | NOT PUBLISHED | Boulder, Larimer and Weld counties |
| Mobility Study in Dillon and Silverthorne at US 6 & CO 9 | CDOT | No status printed | NOT PUBLISHED | Summit County |
| Mount Harris Canyon Rockfall Mitigation and Resurfacing | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Mountain Rail | Preliminary Design & Planning | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Mt. Garfield Culvert Study | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| North I-25 Express Lanes: US 36 to 120th Avenue | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Northeast Colorado Projects | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Northwest Colorado Projects | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| O Street & US 85 Intersection Improvements | Design Phase | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Overview | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Paepcke Transit Hub Improvements on Main and Galena, a City of Aspen Project | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Parker Road and Arapahoe Road Interchange | CDOT | No status printed | NOT PUBLISHED | Arapahoe County |
| Peaks to Plains Trail | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Pecos Street over I-70 Bridge Replacement | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Powers Blvd and Airport Rd Interchange Project | CDOT | Environmental | NOT PUBLISHED | El Paso County |
| Powhaton Bridge Rehabilitation | CDOT | No status printed | NOT PUBLISHED | Adams County |
| Red Cliff Bridge Improvements | Design Phase | CDOT | Studies, Environmental | NOT PUBLISHED | Eagle County |
| Serpentine Drive & I-25 Wall Repairs in El Paso County | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| SH 14 over the Poudre River | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| SH 67 Bridge Replacement | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Signal Replacements in Denver Metro/Central Colorado Design | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Smart 25 Pilot: Coordinated Ramp Metering System on I-25 from Ridgegate Parkway to University Boulevard | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Smart 70 | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Snowplow Signal Priority Pilot | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| South Federal Boulevard Safety Improvement Project | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| South Federal Raised Medians | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Southbound I-225 Restriping & Lane Addition from Yosemite Street to I-25 | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Southeastern Colorado Pavement Marking | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Southwest Chief Thru-Car Service Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| State Freight and Passenger Rail Plan (March, 2012) | CDOT | Transit and Rail, Passenger Rail Plan | NOT PUBLISHED | CDOT’s page names no county. |
| State Highway 7 (Arapahoe Road) Environmental Assessment | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| State Highway CO 14 Corridor | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| State Highway System Variable Message Sign Replacement | CDOT | Statewide News | NOT PUBLISHED | CDOT’s page names no county. |
| University Boulevard Concrete Repairs | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 138 & US 385 Timber Bridge Replacements | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 160 & CO 172 to Gem Village | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 160 and US 550 Durango Continuous Flow Intersection | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 160 at Rio Grande County Road 19 | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 160 Elmore's East Project | Preliminary Design & Planning | CDOT | Studies | NOT PUBLISHED | La Plata County |
| US 160 Scour Mitigation near South Fork | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 160 Wolf Creek Pass Fiber Optic Cable Installation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 160/South Broadway Reconstruction in Cortez | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 & Judge Orr Road Intersection Improvements | Design Phase | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 and CO 67 Bridges | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 at Crossman Avenue Intersection Upgrades | CDOT | Archived Project | NOT PUBLISHED | Chaffee County |
| US 24 Bridge over WITHHELD | CDOT | FASTER, Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 Bridge Replacement at Black Squirrel Creek | CDOT | Archived Project, FASTER | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 Constitution Avenue to Garrett Road | CDOT | Archived Project | NOT PUBLISHED | El Paso County |
| US 24 Corridor Improvements | Design Phase | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 East - Manitou Springs Overlay | CDOT | Archived Project | NOT PUBLISHED | El Paso County |
| US 24 Lake County | CDOT | Archived Project | NOT PUBLISHED | Lake County |
| US 24 Resurfacing East of Simla | CDOT | Archived Project | NOT PUBLISHED | Elbert County |
| US 24 Resurfacing from Burlington to Bethune | CDOT | Active Construction | NOT PUBLISHED | Kit Carson County |
| US 24 Ute Pass | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 24 Ute Pass Improvements from 8th Street to Woodland Park | CDOT | Archived Project | NOT PUBLISHED | El Paso County |
| US 285 from C-470 to Tiny Town Intelligent Transportation System installation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 285 from Santa Fe Drive to Federal Boulevard Intelligent Transportation System installation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 287 at Lamar | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 287 from US 36 to CO 7 Intelligent Transportation System installation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 287 Improvements in Boulder County Design | CDOT | No status printed | NOT PUBLISHED | Boulder County |
| US 287 Near Berthoud | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 287 Resurfacing in Fort Collins | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 34 at 35th & 47th Avenues Interchanges Design Study | CDOT | Studies | NOT PUBLISHED | CDOT’s page names no county. |
| US 34 Big Thompson Canyon | CDOT | Archived Project | NOT PUBLISHED | Larimer County |
| US 34 Brush Lateral Canal Repair | CDOT | Archived Project | NOT PUBLISHED | Morgan County |
| US 34 Business in Weld County | CDOT | Archived Project | NOT PUBLISHED | Weld County |
| US 34 Railroad Crossing Elimination Study | CDOT | No status printed | NOT PUBLISHED | Weld County |
| US 34 Truss Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 34 Truss Bridges MDB | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 34 Wray Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | Yuma County |
| US 36 Express Lanes | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 36 from Baseline Road to CO 119 Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 36, Pearl Street to 55th Street - Wetland Mitigation | CDOT | Archived Project | NOT PUBLISHED | Boulder County |
| US 36/Foothills Parkway Bridge Deck Replacement | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 40 - Colfax and Quail Signal Replacement | CDOT | Archived Project | NOT PUBLISHED | Jefferson County |
| US 40 Construction in Old Town Steamboat Springs | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 40 Elk River Bridge Replacement | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 40 Fraser Feasibility Study | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 40 Granby Trail | CDOT | Archived Project | NOT PUBLISHED | Grand County |
| US 40 Mountain Corridor: Grand County | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 40 Red Dirt Hill Safety Improvement | CDOT | No status printed | NOT PUBLISHED | Grand County |
| US 40 Steamboat West | CDOT | Archived Project | NOT PUBLISHED | Routt County |
| US 491 Cortez North | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 50 Culvert Replacement in Montrose | CDOT | No status printed | NOT PUBLISHED | Montrose County |
| US 50 East | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 50 Little Blue Creek Canyon Safety Improvements | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 50 Over Blue Mesa | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 50 Reconstruction Las Animas to Lamar | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 50 Safety/Operational Highway Improvements for Freight & Travel Passing Lanes Study | CDOT | Studies | NOT PUBLISHED | Bent, Otero, Prowers and Pueblo counties |
| US 50B & US 50C Corridor Safety Study | CDOT | Studies | NOT PUBLISHED | Pueblo County |
| US 550 Bear Creek Bridge | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 550 Camino del Rio and Main Avenue | CDOT | No status printed | NOT PUBLISHED | La Plata County |
| US 550 Molas Pass Crib Walls | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 550 North of Ridgway | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 6 Bridges Design Build Project | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 6 Brush Creek Bridge | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 6 from CO 58 to I-25 Intelligent Transportation System installation | CDOT | Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 6 Improvements from I-25 to Perry Street in Denver | CDOT | Past Construction | NOT PUBLISHED | CDOT’s page names no county. |
| US 6 North Avenue Improvements Design | CDOT | Archived Project | NOT PUBLISHED | Mesa County |
| US 6 Over Garrison Street | CDOT | Archived Project | NOT PUBLISHED | Jefferson County |
| US 6 over Sheridan Boulevard Bridge Replacement | CDOT | FASTER, Archived Project | NOT PUBLISHED | CDOT’s page names no county. |
| US 6/River Frontage Road Access Control Plan | CDOT | Archived Project | NOT PUBLISHED | Garfield County |
| US 6/Wolcott West Widening | CDOT | Archived Project | NOT PUBLISHED | Eagle County |
| US 85 - Brighton to Fort Lupton | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 85 (Santa Fe Drive) over Dad Clark Gulch | CDOT | Bridge Enterprise, FASTER | NOT PUBLISHED | CDOT’s page names no county. |
| US 85 and CO 392 Road and Intersection | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 85 Ault to Wyoming Border | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 85 Fort Lupton and Evans Park-n-Rides | CDOT | No status printed | NOT PUBLISHED | Weld County |
| US 85 from Hampden Avenue to Castle Rock Intelligent Transportation System installation | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| US 85 Traffic Signal Installation at Daniels Park Road | CDOT | Active Construction | NOT PUBLISHED | Douglas County |
| US 85/US 34 Bypass | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Wadsworth Boulevard Over Bear Creek Bridge Replacement | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Wadsworth Boulevard Resurfacing from 65th to 90th Avenue Design | CDOT | Studies, Environmental | NOT PUBLISHED | Jefferson County |
| Wadsworth Maintenance from Hampden Avenue to US 6 | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
| Wadsworth Parkway between 88th Avenue and 104th Avenue | CDOT | No status printed | NOT PUBLISHED | CDOT’s page names no county. |
Spending to date
NOT PUBLISHEDHow we know
The records
53 projects, CDOT’s corridors among them, are read one by one from each project’s own sources, which its page lists. Their totals are a project’s whole cost, and two of them are our arithmetic on published parts, labeled CALC.
Appropriated capital figures are read from the capital construction schedule of HB26-1410, the 2026-27 Long Bill. It was enacted as chapter 436 of the Session Laws of Colorado 2026 and signed 8 May 2026. All 63 line items sum to $160,355,815, which is the total the act itself prints for that schedule. The parse is complete because the act says so, not because we counted. The IT projects are read from the same act’s IT schedule the same way, and sum to the $32,325,503 it prints.
Requested figures are read from JBC Staff Figure Setting, FY 2026-27, Capital Construction, dated 25 February 2026. A request is not an appropriation. It is what an agency asked for, and what the state declined to fund is as telling as what it builds.
CDOT’s projects are read from every page of CDOT’s own project catalog, last read 25 September 2026. A row prints the amount and the stage CDOT’s page prints, and says NOT PUBLISHED where the page prints none. An amount of a million dollars or more is shown in millions ("$90.1M"). CDOT’s exact words are in the amount’s hover text and on the project’s own page.
Where CDOT prints a range ("$5 - 20 Million"), the row prints the whole range ("$5–20M"), never one end of it. A range is not one figure, so it is not ordered by amount and is in neither size band. It sorts after every row with a single amount, and the Size filter lists the 16 ranges on their own. 50 catalog pages would not serve us their contents; their rows say so, and their pages here do too.
One project is one row. Where two of these records describe the same project, a list we keep by hand says which row a reader sees. Nothing is matched by name or amount. A budget line paired with a larger project stays on the page, under it.
Where the circles come from
Neither budget document publishes a coordinate, a county, or an address. Both name a facility or an institution — "Four Mile Correctional Center", "Lamar Community College" — and we place those. Every placement is declared in one file with the reason it is placed where it is. Where we could not establish a site, the project is listed and not drawn. It is never pinned to a plausible guess, and it is never dropped.
What this page does not claim
It does not show spending. None of these figures is money out the door; for most projects no publisher reports spending at this grain, and we will not estimate it. The exceptions are the CDOT projects named under Spending to date, whose payments are on their own pages. It does not add a request to an appropriation, or a project’s whole cost to one year’s budget line.
Circles at one facility are spread on a small ring so none hides the others. The ring is a drawing device and is smaller than the facility it sits on. It is not a claim about where inside a campus anything is. Relief shading is schematic.