North I-25 Express Lanes — Segment 6 (Berthoud–Johnstown)

Express lanes & interchange work on I-25 north of Denver. Timeline 2021–2023.

Est. total cost
≈ $305M
Delivery stage
✓ Complete
Paid so far, to whom PENDING

Your take on this project

Latest public update

CDOT lists Segment 6 as fully funded at approximately $305M. CDOT's own milestones page says the Berthoud to Fort Collins stretch, which includes Segment 6, was completed as 2023 closed: the express lanes were to open as soon as Dec 15, 2023, with work continuing through 2024 and a grand opening in spring 2024. This row said the segment was still under construction until 24 September 2026.

Open questions for the state ANALYSIS

  • Are final closeout costs posted for Segment 6?

Fiscal position

Total project cost≈ $305M

Total cost & funding are drawn from the official record(s) listed below.

Spend-to-date: not published. Colorado does not publish what it has spent on this project, so this field is left blank rather than estimated. It will fill from TOPS/CORE vendor expenditure data as payments are matched to projects.

Milestones

  • Funding identified — 2021
  • Express lanes Berthoud to Fort Collins open — as soon as December 2023
  • Final grand opening scheduled — spring 2024

Who is being paid FACT

Funding sourceFully funded: $20M federal BUILD grant plus state and local contributions.
VendorContract / valuePaid to dateConfidence
WITHHELDCM/GC contractor (JV lead)$215M contractPENDINGB
WITHHELDJV construction partner—PENDINGB
WITHHELDPrime consultant, final design (5.1 mi, 13 bridges)—PENDINGB
The money is published; the names are held. Each row below carries the contract value, what has been paid to date so far as it is published, and our confidence grade — the same figures as always, from the same official records. What is withheld is the vendor's name, the record link that names it, and the campaign-finance search that sat beside it. That is a deliberate decision taken pending legal review, not a figure we could not find: a blank cell would have said the opposite. What WITHHELD means

Source records

Follow this project

North I-25 Express Lanes — Segment 6 (Berthoud–Johnstown)

Point a phone camera at this to open the project.