Aurora projects · 2026

Projects

Every capital project the City of Aurora lists by project for 2026, with its 2026 Adopted appropriation, and the Aurora Water categories the city publishes instead of projects. Below them are the State of Colorado’s own projects in the city, a different government’s money, kept apart. Each project opens its own page.

Capital projects

FACT
This is the city’s own capital money, and the table below is about a quarter of it. Aurora budgeted $384,354,334 of capital spending for 2026. It publishes $95,165,836 of that project by project — 24.8%. The remaining $289,188,498 is Aurora Water, which the city publishes by category rather than one project at a time. That is the publisher’s own split, not ours: its table is headed “Projects as Adopted by City Council without Aurora Water” and its total row is labeled “(Excluding Aurora Water)”. Both halves are below. Nothing here is added to any figure in another section of these pages. The section that follows is the State of Colorado’s money, the dashboard carries the three counties’ own, and budgets belonging to different governments are never combined.

This is not a “major projects” shortlist. It is every row the city prints in its capital project table — all 193 of them, down to $20,000 — read from the budget book’s own Capital Improvement Program chapter. Only 56 of those rows carry money appropriated for 2026; the other 137 are projects still holding unspent money from earlier years, and the table says which is which. Every department total, every fund total and the chapter’s own grand total reconcile to the city’s printed figures, in all eight of its columns, before a row of it appears here.

2026 capital, listed by project FACT
$95.2M
Exactly $95,165,836. The city’s own printed total for the project table, which it labels (Excluding Aurora Water). This is money appropriated for 2026 — not money spent, and not the five-year plan.
The whole 2026 capital program FACT
$384.4M
Exactly $384,354,334. Every fund, from the budget book’s own Summary by Fund. The $95,165,836 above is 24.8% of it. The city prints both figures, and prints their difference as its own row.
Aurora Water — not listed by project FACT
$289.2M
Exactly $289,188,498. 75.2% of the capital program, and the majority of it. In the capital summary the city publishes it as 9 categories across the two funds Aurora Water runs, not project by project. It is shown below by category rather than left out.
Spent so far, by project NOT PUBLISHED
—
The city publishes no spending by project. This chapter carries appropriations and plans: no spend to date, no encumbrance, no prior-year actual against a named project. The carryforward column below is money appropriated and not yet spent, which is the nearest thing published and is not a spend figure. No estimate is offered.

What the project table covers, fund by fund

Every fund with capital money in 2026, and whether the city publishes its projects one by one. The two funds Aurora Water runs are the exclusion, and together they are most of the program. These are capital appropriations only — the dashboard’s $100 receipt prints the same two funds’ whole budgets, operating and capital together, which are much larger figures for the same names.

FundPublished2026 capital
Capital Projects FundBy project$39,962,082
Conservation Trust FundBy project$3,205,000
Designated Revenues FundBy project$0
Enhanced E-911 FundBy project$1,700,000
Gifts & Grants FundBy project$0
Golf Courses FundBy project$6,640,000
Open Space FundBy project$9,625,000
Parks Development FundBy project$213,762
Transportation Maintenance FundBy project$33,819,992
Wastewater FundBy category — Aurora Water$54,939,463
Water FundBy category — Aurora Water$234,249,035
Total capital improvement programThe city’s own printed total, every fund$384,354,334

The excluded majority, in the categories the city publishes

Aurora Water’s capital money, as the capital summary prints it: 9 categories, with no project names and no project numbers. This is the part the table further down leaves out, and it is here so that the gap has a size and a shape rather than only a name. These rows are not projects and this section never calls them projects.

Some of this is published project by project elsewhere in the same chapter, and is not read here yet. The book carries “Non-Routine Project Pages” — a page per project, with a description, a location and its own money columns — and Aurora Water projects are among them. They are a subset by the publisher’s own name for them, and this ledger has not reconciled them, so no figure from them appears here. The nine categories above remain the only complete account the city publishes of this money.

FundCategory2026 capital
Wastewater FundCollection$20,625,854
Wastewater FundOperations & General Management$8,109,000
Wastewater FundStorm Water$26,204,609
Water FundOperations & General Management$7,311,000
Water FundSource of Supply Other$63,092,144
Water FundSource of Supply Storage$55,315,388
Water FundSource of Supply Water$21,200,000
Water FundTransmission & Distribution$45,596,186
Water FundTreatment$41,734,317
Total Aurora Water — the city’s own printed row$289,188,498

Every project the city publishes

The table opens in the city’s own order, which groups projects by fund and department rather than by size — the city publishes no ranking, so none is the default. You can sort it any way you like. Two different quantities sit side by side and are never added. The 2026 appropriation is money Council appropriated for this year. The carried-forward column is, in the book’s own words, “Prior years’ unspent appropriation as of December 31, 2024” — money appropriated in earlier years and not yet spent, which is why a project can show nothing for 2026 and still be live. The city also prints four later years; those are plans, not appropriations, and no figure from them appears here. Each project name opens that row’s own page.

Search and filter

193 projects

Every capital project row Aurora publishes for 2026, with its fund, its department, its 2026 appropriation and its unspent appropriation carried forward from earlier years. In the city’s own order until you choose another.
Courts Building ImpovementsCapital Projects FundCourt Administration$0$0
Direct Costs Financial ServicesCapital Projects FundFinance$236,837$0
Remodel for Check 21 SystemsCapital Projects FundFinance$0$18,615
Direct Costs-Purchasing SvcsCapital Projects FundFinance$553,601$0
Financial Systems (Accounting, T&L, and Budget)Capital Projects FundFinance$0$364,468
Fire Station 17 Bunker Gear Storage RoomCapital Projects FundFire$0$0
Fire Station Debt ServiceCapital Projects FundFire$2,000,000$0
Cross Creek Fire StationCapital Projects FundFire$0$71,379
Navigation Campus Building RepairCapital Projects FundHousing and Community Services$500,000$0
Animal Shelter ProjectCapital Projects FundHousing and Community Services$3,200,000$0
Camera ReplacementsCapital Projects FundInformation Technology$100,000$0
Systems and Network ReplacementCapital Projects FundInformation Technology$326,000$0
HandsetsCapital Projects FundInformation Technology$0$0
Technology Infrastructure ExpansionCapital Projects FundInformation Technology$300,000$282,389
Regional Crime Lab Technology CostsCapital Projects FundInformation Technology$0$29,464
CAPSTC Ventilation SystemCapital Projects FundInformation Technology$0$22,009
Enterprise Resource Planning System ReplacementCapital Projects FundInformation Technology$1,394,862$792,166
Wifi Access ReplacementsCapital Projects FundInformation Technology$651,241$0
Highway 30 Landfill Remediation GrantCapital Projects FundNon-Departmental$0$0
People's Building Grant MatchCapital Projects FundNon-Departmental$0$0
Art in Public Places (Transfer to Cultural Fund)Capital Projects FundNon-Departmental$467,708$0
Colfax ImprovementsCapital Projects FundNon-Departmental$0$408,334
HW 30 Landfill RemediationCapital Projects FundNon-Departmental$250,000$30,831
ARTA PaymentCapital Projects FundNon-Departmental$3,757,651$0
DIA Noise MitigationCapital Projects FundNon-Departmental$0$76,640
DIA Court Approved Noise PlanCapital Projects FundNon-Departmental$0$968,490
TOD Development SupportCapital Projects FundNon-Departmental$0$1,800,000
Public Safety Debt ServiceCapital Projects FundNon-Departmental$1,500,000$0
Xcel Street Light StudyCapital Projects FundNon-Departmental$0$184,856
Greenhouse Set-Aside FundsCapital Projects FundNon-Departmental$0$350,000
Transportation Maintenance COP PaymentCapital Projects FundNon-Departmental$2,500,000$13,232
SEAM Fleet Bay and Fueling Cost ShareCapital Projects FundNon-Departmental$0$0
Median MaintenanceCapital Projects FundParks, Recreation & Open Space$44,790$248,176
Fire Stations Xeric Landscape - CPFCapital Projects FundParks, Recreation & Open Space$0$414,591
HL Canal Underpass TIP match - CPFCapital Projects FundParks, Recreation & Open Space$0$800,000
Smoky Hill Median-CPFCapital Projects FundParks, Recreation & Open Space$0$132,597
Colorado Freedom Memorial ProjectCapital Projects FundParks, Recreation & Open Space$0$0
SE Parking Lot and Trails-CPFCapital Projects FundParks, Recreation & Open Space$0$1,369,199
DeLaney Farm Site Improvements- CPFCapital Projects FundParks, Recreation & Open Space$0$141
Median Development-CPFCapital Projects FundParks, Recreation & Open Space$0$3,688,235
HLC Tip Match-CPFCapital Projects FundParks, Recreation & Open Space$0$611,408
Plains Conservation Ctr Improve- CPFCapital Projects FundParks, Recreation & Open Space$0$53,659
Sand Creek Park Shelter-CPFCapital Projects FundParks, Recreation & Open Space$0$16,000
Multi Modal Transportation Master PlanCapital Projects FundPlanning and Business Development$0$2,001,335
Aurora AerotropolisCapital Projects FundPlanning and Business Development$0$89,073
13th Ave Light Rail TODCapital Projects FundPlanning and Business Development$0$2,350,000
DOLA 13th Av Transit DevelopmtCapital Projects FundPlanning and Business Development$0$4,900,000
1400 Dallas Street ImprovementCapital Projects FundPlanning and Business Development$0$6,522
Colfax Corridor Streetscapes ImprovementsCapital Projects FundPlanning and Business Development$0$34,908
People's Bldg ConstructionCapital Projects FundPlanning and Business Development$0$2,671
GOH Mid-Block LightingCapital Projects FundPlanning and Business Development$0$655,000
Beck Recreation Center Demo / Feasibility StudyCapital Projects FundPublic Works$0$0
Box Elder CreekCapital Projects FundPublic Works$0$0
Infill DevelopmentCapital Projects FundPublic Works$500,000$0
Meadowood Recreation Center ProjectCapital Projects FundPublic Works$0$0
Tower Metro District IGACapital Projects FundPublic Works$0$0
Traffic Signal RetimingCapital Projects FundPublic Works$1,000,000$0
64th Avenue ARI IncentiveCapital Projects FundPublic Works$0$0
Conservatory Metro DistrictCapital Projects FundPublic Works$0$841
People's Building ProjectCapital Projects FundPublic Works$0$0
Central Library Renovation ProjectCapital Projects FundPublic Works$0$0
Aurora TMV TRO&TCapital Projects FundPublic Works$0$0
Comm Infrastructure Impr RTO&TCapital Projects FundPublic Works$0$0
FY25 Traffic Signal Equip UpgradeCapital Projects FundPublic Works$0$0
Colorado Ave West of Havana SidewalkCapital Projects FundPublic Works$0$0
Sidewalk infill 22nd Place from Tower to CarmelCapital Projects FundPublic Works$0$0
Majestic ProjectCapital Projects FundPublic Works$0$5,215,000
13th Avenue Multimodal TIPCapital Projects FundPublic Works$0$1,500,000
Gun Club Mutimodal TIPCapital Projects FundPublic Works$0$2,500,000
Alameda I-225 Bridge Design TIPCapital Projects FundPublic Works$0$3,000,000
Peoria Bridge Design TIPCapital Projects FundPublic Works$0$2,961,658
Laredo Bridge Over Highline TIPCapital Projects FundPublic Works$0$2,223,700
Animal Shelter Update/ExpansionCapital Projects FundPublic Works$0$2,000,000
Building Improvement Master Plan / ImplementationCapital Projects FundPublic Works$0$1,989,979
Central Library Room UpgradeCapital Projects FundPublic Works$0$250,000
Multimodal ImplementationCapital Projects FundPublic Works$0$600,000
Parker Quincy Smoky Hill TIPCapital Projects FundPublic Works$0$9,171,000
Public Safety Master Plan / ImplementationCapital Projects FundPublic Works$0$715,917
11th Havana Del Mar HSIPCapital Projects FundPublic Works$0$4,211,579
Police Firing Range PEMBCapital Projects FundPublic Works$0$857,216
Advanced Traffic Signal ControllersCapital Projects FundPublic Works$0$419,550
Chase Drain Rebate ProgramCapital Projects FundPublic Works$0$98,890
Missing Sidewalks PH1 TIPCapital Projects FundPublic Works$0$3,085,000
Missing Sidewalks PH 2 TIPCapital Projects FundPublic Works$0$6,252,798
Smith Road Multimodal Corridor DesignCapital Projects FundPublic Works$0$3,801,993
Traffic Management SystemCapital Projects FundPublic Works$1,000,000$3,462,550
Advanced Traffic Signal SystemCapital Projects FundPublic Works$0$377,204
Picadilly Road AgreementsCapital Projects FundPublic Works$0$10,760,000
I70 Picadilly FASTER GrantCapital Projects FundPublic Works$0$5,365,734
I70 Picadilly BUILD GrantCapital Projects FundPublic Works$0$7,552,191
Montview Redesign IGACapital Projects FundPublic Works$0$14,885
Nine Mile Ped BridgeCapital Projects FundPublic Works$0$11,886,953
Aurora Parkway SARIACapital Projects FundPublic Works$0$276,613
I-70 / Picadilly 30 Percent DesignCapital Projects FundPublic Works$0$38,095,508
HSIP Grant 19/20Capital Projects FundPublic Works$0$99,572
Imboden RoadCapital Projects FundPublic Works$0$8,656
Picadilly -Smith to 26th AgreementCapital Projects FundPublic Works$0$850,000
Security EnhancementsCapital Projects FundPublic Works$500,000$1,682,796
Jewell Avenue Ped CrossingCapital Projects FundPublic Works$0$248,999
Gun Club Priority Proj SARIACapital Projects FundPublic Works$0$3,389,158
Gartrell Priority Proj SARIACapital Projects FundPublic Works$0$67,755
Signal System Upgrade GrantCapital Projects FundPublic Works$0$475,752
ADA Accomodation Equity and AccessCapital Projects FundPublic Works$0$749,764
NW Aurora Mobility and Access ImplementationCapital Projects FundPublic Works$0$35,040
E-470 Loan RepaymentCapital Projects FundPublic Works$235,000$36,800
Transportation Priority ProjectsCapital Projects FundPublic Works$1,600,000$6,026,734
Miscellaneous Street ImprovementsCapital Projects FundPublic Works$1,480,000$3,164,141
Sidewalk/ADA ImprovementsCapital Projects FundPublic Works$0$410,000
Traffic Operations and SafetyCapital Projects FundPublic Works$3,250,000$7,287,878
Street Asphalt Overlay ProgramCapital Projects FundPublic Works$0$5,718,420
Transportation Improvement ProgramCapital Projects FundPublic Works$0$9,984,710
Northwest Aurora Alley Paving ProgramCapital Projects FundPublic Works$607,750$456,622
Direct Costs - Design and Engineering CPFCapital Projects FundPublic Works$1,896,134$0
Traffic Signal Component ReplacementCapital Projects FundPublic Works$1,025,000$800,043
Street Maintenance - Chip Seal/Crack SealCapital Projects FundPublic Works$0$4,067
Bridge MaintenanceCapital Projects FundPublic Works$1,050,000$1,182,486
Direct Costs - Building Repair CPFCapital Projects FundPublic Works$312,988$4
Building Repair Projects - CPFCapital Projects FundPublic Works$5,367,520$7,004,469
6th Ave Lft Turn Lane BuckleyCapital Projects FundPublic Works$0$0
Bicycle Aurora Phase 1 FundingCapital Projects FundPublic Works$0$959,621
Buckley AFB Accel-Decel LanesCapital Projects FundPublic Works$0$663,440
Streets Condition TestingCapital Projects FundPublic Works$30,000$150,000
Police District 2 Debt ServiceCapital Projects FundPublic Works$825,000$782,979
Single Point of Entry RemodelCapital Projects FundPublic Works$0$465,795
Multimodal Connections - TOD first/last mileCapital Projects FundPublic Works$0$1,470,008
Quincy WideningCapital Projects FundPublic Works$0$339,799
Police Security EnhancementsCapital Projects FundPublic Works$0$10,046
Traffic Signal Inspection and RepairCapital Projects FundPublic Works$0$43,499
Traffic Calming ImprovementsCapital Projects FundPublic Works$1,300,000$2,278,227
Picadilly I-70 InterchangeCapital Projects FundPublic Works$0$87
Roadway Safety ImprovementsCapital Projects FundPublic Works$200,000$1,032,803
Westerly CreekCapital Projects FundPublic Works$0$925,335
Road Maintenance IGACapital Projects FundPublic Works$0$1,600,384
Infrastructure Recreation-CTFConservation Trust FundParks, Recreation & Open Space$340,000$1,761,592
Systemwide Planning - CTFConservation Trust FundParks, Recreation & Open Space$300,000$682,766
Infrastructure Parks-CTFConservation Trust FundParks, Recreation & Open Space$785,000$2,662,629
Infrastructure Trails-CTFConservation Trust FundParks, Recreation & Open Space$0$289,592
Infrastructure Open Space-CTFConservation Trust FundParks, Recreation & Open Space$20,000$278,156
Systemwide Improvements - CTFConservation Trust FundParks, Recreation & Open Space$0$20,472
Construction Open Space-CTFConservation Trust FundParks, Recreation & Open Space$1,510,000$2,307,711
Construction Parks-CTFConservation Trust FundParks, Recreation & Open Space$250,000$3,671,634
Aur Res Infrastructure-CTFConservation Trust FundParks, Recreation & Open Space$0$60,000
Aurora Television 4K UpgradeDesignated Revenues FundCommunications$0$0
Youth Empowerment CenterDesignated Revenues FundHousing and Community Services$0$0
Utah BBall Court-Broncos FundsDesignated Revenues FundParks, Recreation & Open Space$0$0
911 Technology InfrastructureEnhanced E-911 FundInformation Technology$500,000$0
Aurora911 Console and AFR Portable ReplacementsEnhanced E-911 FundInformation Technology$0$0
Radio Tower Infrastructure ReplacementEnhanced E-911 FundInformation Technology$0$0
800 MHz Radio System UpgradeEnhanced E-911 FundInformation Technology$0$48,050
MDC Infrastructure ReplacementEnhanced E-911 FundInformation Technology$0$1,601,106
Computer Aided Dispatch UpgradeEnhanced E-911 FundInformation Technology$0$0
Uninterruptible Power System ReplacementEnhanced E-911 FundInformation Technology$0$1,335
Radio System Infrastructure UpgradeEnhanced E-911 FundInformation Technology$0$2,189,383
Public Safety FiberEnhanced E-911 FundInformation Technology$0$19,900
911 Systems Cybersecurity ProgEnhanced E-911 FundInformation Technology$0$443,898
E-911 Call Management SystemEnhanced E-911 FundInformation Technology$0$1,217,268
800 MHz Portable and Mobile ReplacementEnhanced E-911 FundInformation Technology$1,200,000$200,000
ADA Imp Council ChambersGifts & Grants FundNon-Departmental$0$172,412
6.1o Park Renovations by WardGifts & Grants FundNon-Departmental$0$0
Park Renovations By WardGifts & Grants FundNon-Departmental$0$3,167,194
6.1p Fire Station ImprovementsGifts & Grants FundNon-Departmental$0$0
Fire Station ImprovementsGifts & Grants FundNon-Departmental$0$9,261,322
Animal Shelter RenovationsGifts & Grants FundNon-Departmental$0$3,543,131
Cherry Creek Bike Path-GrantGifts & Grants FundParks, Recreation & Open Space$0$2,584
HLC/Laredo ArCo GrantGifts & Grants FundParks, Recreation & Open Space$0$180,000
Sand Creek Trail Grant-AdCoGifts & Grants FundParks, Recreation & Open Space$0$229,890
PCC Gnt 2020-2021 ArCoGifts & Grants FundParks, Recreation & Open Space$0$493,609
Star K Nature Plan Grant AdCoGifts & Grants FundParks, Recreation & Open Space$0$300,000
Murphy Creek Trail-ArCoGifts & Grants FundParks, Recreation & Open Space$0$500,000
Brownfields RLFGifts & Grants FundPlanning and Business Development$0$1,355
Golf-Infra CTF SupportGolf Courses FundParks, Recreation & Open Space$0$166,766
Golf Infrastructure Capital ProjectsGolf Courses FundParks, Recreation & Open Space$6,640,000$639,898
Infrastructure Recreation-AdCoOpen Space FundParks, Recreation & Open Space$0$1,727
Infrastructure Trails-AdCoOpen Space FundParks, Recreation & Open Space$0$28,448
Systemwide Planning - Open SpaceOpen Space FundParks, Recreation & Open Space$0$1,581,321
Infrastructure Trails-ArCoOpen Space FundParks, Recreation & Open Space$500,000$828,255
Construction Open Space-ArCoOpen Space FundParks, Recreation & Open Space$1,000,000$6,080,975
Construction Parks-ArCoOpen Space FundParks, Recreation & Open Space$5,250,000$13,336,498
Infrastructure Parks-ArCoOpen Space FundParks, Recreation & Open Space$2,040,000$2,089,341
Infrastructure Open Space-ArCoOpen Space FundParks, Recreation & Open Space$100,000$391,470
Parks Parking Lot Paving ArCoOpen Space FundParks, Recreation & Open Space$250,000$155,677
Construction Open Space-AdCoOpen Space FundParks, Recreation & Open Space$100,000$948,224
Infrastructure Open Space-AdCoOpen Space FundParks, Recreation & Open Space$75,000$170,000
Construction Parks-AdCoOpen Space FundParks, Recreation & Open Space$0$300,000
Infrastructure Parks-AdCoOpen Space FundParks, Recreation & Open Space$310,000$170,307
Community Parks DevelopmentParks Development FundParks, Recreation & Open Space$0$0
Infrastructure Parks-PDFParks Development FundParks, Recreation & Open Space$0$316,595
Systemwide Planning - PDFParks Development FundParks, Recreation & Open Space$0$285,695
Cherry Creek Bike Path-PDFParks Development FundParks, Recreation & Open Space$0$0
Construction Parks-PDFParks Development FundParks, Recreation & Open Space$213,762$9,351,290
Concrete Repair Program - TMFTransportation Maintenance FundPublic Works$2,224,000$1,238,525
Street Maintenance and Reconstruction -TMFTransportation Maintenance FundPublic Works$30,649,610$17,466,379
Street Maintenance - Asphalt Overlay In House TMFTransportation Maintenance FundPublic Works$946,382$918,817
Where these figures come from
2026 Operating and Capital Improvement Budget (adopted), published by the City of Aurora, Office of Budget and Financial Planning and named on the methodology page. The tables are read by column position, not by reading order, because this chapter prints project names carrying digits (“Fire Station 17”, “Check 21 Systems”, “I-70 / Picadilly”) and prints a negative as a minus sign detached from its own figure — both of which a plainer reading files as money. Every department, every fund and the chapter’s grand total are checked against the city’s own printed rows, in all eight columns, and the two halves of the program are checked against the Summary by Fund page, which is a different page with its own layout.

One figure in the book disagrees with itself, and it is not the appropriation. The Aurora Water page repeats the whole-program totals under its own table; in seven of eight columns it matches the Summary by Fund page exactly, and for carried-forward money it prints $438,389,077 where the summary page prints $435,195,718 — $3,193,359 apart. The summary page’s figure is the one two separate paths agree on, so it is the one used, and the 2026 appropriations on this page are unaffected: those reconcile across all three tables to the dollar.

State projects in Aurora

FACT
This is the State of Colorado’s money, not the city’s. These are projects the STATE appropriates or is asked to appropriate, at sites inside Aurora. No figure here is part of the city budget above, and none of it is ever added to one. Two governments spend money in the same place; this site keeps them apart on principle.
ProjectState departmentWhereWhat happened to the moneyAmount
Aurora CC Classroom building third floor renovationIHECommunity College of AuroraRequested, not recommended$8,287,776
Pedestrian Bridge ReplacementCommunity College of AuroraCommunity College of AuroraAppropriated$469,318
Occupational Hazard Mitigation, R1 NorthUniversity of Colorado - AnschutzCU Anschutz Medical CampusAppropriated$3,020,870
Fire Alarm System Replacement, Various BuildingsUniversity of Colorado - AnschutzCU Anschutz Medical CampusAppropriated$2,997,553

The three quantities on that table, and why they are never added

QuantityWhat it isTotal
AppropriatedMoney the legislature appropriated for this project in the enacted capital schedule.$6,487,741
Requested, recommendedA capital request the Capital Development Committee recommended. Nobody has appropriated it.$0
Requested, not recommendedA capital request the committee did not recommend. Nobody has appropriated it, and it is shown because what a state declines to fund is as telling as what it builds.$8,287,776
Neither document says where these projects are, so we do
The enacted capital schedule and the committee’s figure-setting document name an institution or a facility and publish no address, no county and no coordinate. Placing them is our claim, made once and graded: A where the document names the town itself, B where it names a facility whose location is a matter of public record but is not in the document. This section filters on the town, not the county — a county is not a city, and a county-keyed filter would put a neighboring town’s project under this city’s name.
The 2 sites this table draws on, and why each one is placed there
  • Community College of Aurora · grade B — CentreTech campus, Aurora, Arapahoe County.
  • CU Anschutz Medical Campus · grade B — The Anschutz Medical Campus at Aurora sits in Adams County.